HomeMy WebLinkAbout20131209 Ver 1_401 Application_20131113e 0Gavel & Dorn Engineering, PLLC
6730 Freedom Dnve, Charlotte, NC 28214, 704 -483 -2054
November 12, 2013
20131209
NC DW% WBSCP Unit
1650 Mail Service Center
Raleigh, NC 27699 -1650
Re: Peters Creek Outfall Rehabilitation PCN
To whom it may concern:
On behalf of the City of Winston - Salem, Gavel & Dorn Engineering, PLLC (G &D) is pleased to
submit the following documents for your review.
1. (5) copies of the PCN Application
2. (2) full size copies of construction plans;A r
3. (3) 11x17 copies of the construction plans;
4. (1) check in the amount of $240.00. �' �
If after reviewing the documents you need any additional information to complete your review,
please feel free to contact me via email at mavo @eaveldorn.com or by phone at 704- 724 -5047.
Sincerely,
GAVEL & DORN ENGINEERING, PLLC
Sean Mayo, P.E.
Project Manager
C: Jason Dorn, Ph.D., P.E.
Project Files
�ot WATF9
o�
h �
a <
20131208
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the Corps:
❑ Section 404 Permit "' ' ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number. 12 or General Permit (GP) number.
1c. Has the NWP or GP number been verified by the Corps?
® Yes ❑ No
1 d. Type(s) of approval sought from the DWQ (check all that apply):
❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval Is not required?
For the record only for DWQ
401 Certification:
® Yes ❑ No
For the record only for Corps Permit:
® Yes ❑ No
It Is payment into a mitigation bank or In -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or In4lou fee program.
❑ Yes ® No
1 g. Is the project located in any of NC's twenty coastal counties. 9 yes, answer 1 h
below.
❑Yes ®No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ® No
2. Project Information
2a. Name of project
Peters Creek Outfall Rehabilitation
2b. County:
Forsyth
2c. Nearest municipality / town:
Winston -Salem
2d. Subdivision name:
2e. NCDOT only, T.I.P. or state project no:
3. Owner Inbmration
3a. Name(s) on Recorded Deed:
City of Winston -Salem
3b. Deed Book and Page No.
3c. Responsible Party (for LLC If
applicable):
Ron Hargrove
IML'ov@
3d. Street address:
101 N. Main Street, Suite 357
3e. City, state, zip:
Winston-salem, NC 27101 - - - — - _ _
3f. Telephone no.:
336 -747 -7312 D
wwfi.; R__ _ GVq
Y
3g. Fax no.:
'? 3& 2 7.
3h. Email address:
ronh@cftyofws.org
Page 1 of 10
PCN Form — Version 1.4 January 2009
4. Applicant Information (if different from owner)
4a. Applicant is:
❑ Agent ❑ Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:
4e. City, state, zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
S. Agent/Consultant Infamudlon (K applicable)
59. Name:
Jason Dom, PE, PhD
5b. Business name
(if applicable):
Gavel & Dom Engineering, PLLC
Sc. Street address:
6730 Freedom Drive
5d. City, state, zip:
Charlotte, NC 28214
5e. Telephone no.:
704919 -1900
5f. Fax no.:
704483-0207
5g. Email address:
jason@gaveldom.com
Page 2 of 10
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
WA (City owned)
1b. Site coordinates (in decimal degrees):
I Latitude: 36.08747 Longitude: - 80.2596
1c. Property size:
0.05 acres
2. Surface waters
2a. Name of nearest body of water to proposed project:
Peters Creek
2b. Water Quality Classification of nearest receiving water.
C
2c. Mver basin:
Yadkin
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Peters Creek is an existing urbanized creek located in Winston Salem. The creek is located In an existing undeveloped City of WinstonSalem right of
way. The creek is a sandy bottom creek with some exposed rock outcroppings. The creek Is typical of an heavily urbanized creel with that Is
experiencing significant erosion. There is also kudzu growth, debris etc within the creek.
3b. List the total estimated acreage of all existing wetlands on the property: 0.05
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 20
3d. Main the purpose of the proposed project
To construct an 1 &Inch aerial sanitary sewer crossing on new steel pMng piers. Also abandon existing &inch aerial sewer and 14 -Inch siphon.
3e. Describe the overall project in detail, including the type of equipment to be used:
The steel piers for the project will be constructed with driven steel pilings. The new 184nch pipe will be set on top of the piers using heavy equipment
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
ro ect (including all r phases) In the
[] Yes ® No ❑ Unknown
Comments:
4b. If the Corps made the jurisdictional determination, what type
of detemtination was made?
Preliminary Final
4c. if yes, who delineated the jurisdictional areas?
Name (if known):
Agency /Consultant Company.
I Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ® No ❑ Unknown
5b. if yes, explain In detail according to °help flW Instructions.
6. Future Project Plarks
6a. Is this a phased project?
❑ Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
❑ Wetlands ® Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
Wetland impact
number
Permanent (P) or
Temporary
2b.
Type of impact
2c.
Type of wetland
2d.
Forested
2e.
Type of jurisdiction
Corps (404,10) or
DWO (401, other)
2f.
Area of
impact
(acres)
W1 -
Choose one
Choose one
Yes/No
-
W2 -
Choose one
Choose one
Yes/No
-
VV3 -
Choose one
Choose one
Yes/No
-
W4 -
Choose one
Choose one
Yes/No
-
W5 -
Choose one
{ Choose one
Yes/No
-
Wg -
Choose one
Choose one
Yes/No
-
2g. Total Wetland Impacts:
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
Stream impact
number
Permanent (P) or
Temporary m
3b.
Type of impact
3c.
Stream name
3d.
Perennial (PER) or
intermittent (INT)?
3e.
Type of
jurisdiction
3f.
Average
stream
width
(feet)
3g•
Impact
length
(linear
fee)
S1 T
Minor creek disturbance
Peters Creek
PER
Corps
40
10
S2 -
Choose one
-
-
S3 -
Choose one
-
-
S4 -
Choose one
-
-
S5 -
Choose one
-
-
Sg -
Choose one
-
-
3h. Total stream and tributary Impacts
10
3i. Comments:
-Naar Str eam_ impactsJor _oonstnwhocLotaenal_sanda y -sewer crossing. No heavy equipment will_cross streamAed.-Eoat track -cmIy orltidpAted
Page 4 of 10
PCN Form — Version 14 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then indM ually list all open water impacts below.
4a.
Open water
Impact number
Permanent (P) or
Temporary
4b.
Name of waterbody
(if applicable)
4c.
Type of impact
4d.
Waterbody
type
4e.
Area of impact (acres)
01 -
Choose one
Choose
02 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f. Total open water Impacts
4g. Comments:
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below.
5a.
Pond ID number
5b.
Proposed use or
pine of pond
5c.
Wetland Impacts (acres)
5d.
Stream Impacts (feet)
5e.
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f. Total:
5g. Comments:
5h. Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
51. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require miti on then you MUST fill out Section D of this form.
6a. Project Is in which protected basin?
❑ Nauss ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other.
6b.
Buffer Impact
number —
Permanent (P) or
Temporary
6c.
Reason for impact
6d.
Stream name
6e.
Buffer
mitigation
required?
6f.
Zone 1
Impact
(square
feet )
6g.
Zone 2
impact
(square
feet
B1 -
---Yes/No
B2 -
Yes/No
B3 -
Yes(No
B4 -
Yes/No
B5 -
YeslNo
B6 -
Yes/No
6h. Total Buffer Impacts:
61. Comments:
Page 5of10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Steel pilings and piers for aerial sanitary sewer crossing have been located outside of normal edge of creek. Piers have been located as far up the
embankment as possible.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Construction will be completed from above the creek and will not require any creek disturbance by heavy equipment. Access easements have been
obtained to allow for construction equipment to reach both sides of the creek without crossing the creek.
2. Compensatory Mitt ion for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
❑ Yes ® No
2b. if yes, mitigation is required by (check all that apply):
❑ DWQ ❑ Corps
2c. If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in4leu fee program
❑ Permittee Responsible Mitigation
3. Complete If Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter)
Type: Choose one
Type: Choose one
Type: Choose one
Quay:
Quantity:
Quantity:
3c. Comments:
4. Complete If Making a Payment to In -Ileu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
Choose one
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non - riparian wetland mitigation requested:
aloes
4g. Coastal Ltidal) wetland mitigation requested:
acres_
4h. Comments:
5. Complete If Using a Permlttse Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation Is proposed (e.g., payment to private mitigation bank,
pennittee responsible riparian buffer restoration, payment into an approved in4leu fee fund).
6h. Comments:
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
within one of the NC Riparian Buffer Protection Rules?
❑ Yes ® No
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes ❑ No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
0 q6
2b. Does this project require a Stormwater Management Plan?
❑ Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
No stormwater aspect of plan. Project is to replace and repair existing sanitary sewer system only.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
2e. Who will be responsible for the review of the Stormwater Management Plan?
WA
3. Certified Local Government Stormwater Review
3a. In which local ovemmenrs Jurisdiction Is this ro ect?
3b. Which of the following locally- implemented stormwater management programs
apply (check all that apply):
❑ Phase 11
❑ NSW
USMP
8 Water Supply Watershed
❑ Other.
3c. Has the approved Stormwater Management Plan with proof of approval been
Oyes ❑ No
4. DWQ Stormweter Program Review
4a. Which of the following state - implemented stormwater management programs apply
(check all that apply):
❑Coastal counties
❑HQW
ORW
HSesslon Law 2006 -246
❑0ther
4b. Has the approved Stormwater Management Plan with proof of approval been
wMwn�.wJ/f
❑ Yes ❑ No
55.. D'OWO 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan most the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 10
PCN Form — Version 1.4 January 2009
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federaUstateAocal) funds or the
Byes ❑ No
use of public (federal/state) land?
1b. If you answered 'yes' to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
[]Yes ®No
(North Carolina) Environmental Policy Act (NEPAISEPA)?
1c. If you answered 'yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after- the-fact permit application?
[]Yes ® No
2c. If you answered 'yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
❑Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered 'yet* to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
Project is to cortsbuct an 184nch aerial sanitary sewer crossing. The crossing wig repaldreplace part of an exkftg sewer system and will not Increase
capacity of the system In any way. The crossing will allow for removal of a 14 -Inch buried siphon crossing and 8-inch aerial crossing of the stream that
are maintenance Issues.
4. Sewage Disposal (DWQ Requirement)
4a. Cleary detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project or available capacit
y of the subject facility.
No add al wastewat" be n _ _ e$� re� of the-Proism
Page 9 of 10
PCN Form — Version 1.4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
5b. Have you checked,with the USFWS concerning Endangered Species Act
❑ Yes ® No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
-
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
USFWS NC Endangered and Threatened species, NC Natural Heritage, $ NC Wildlife Resources Commission webpages
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
South Atlantic Habitat and Ecosystem online mapping application
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
® Yes ❑ No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NC State Historic Preservation OMos online mapping application. Crossing is in between Ardmore Historic District and W. Fourth St Historic District
but will not affect existing buildings in any way.
S. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain?
TO Yes ❑ No
8b. If yes, explain how project meets FEMA requirements:
No building structures are proposed in the FEMA floodplain. Noise study has been completed showing that proposed construction will not cause a
rise in the existing flood elevations.
8c. What source(s) did you use to make the floodplain determination?
FEMA Maps obtained through NC Floodplain Mapping Program.
Rzin Hdtrarow-
i Agents Signature
44113
Applicant/Agent's Printed Name
Data
( s ai Is valid only If an authorization
letter from a applicarit Is provided.)
Page 10 of 10
I (TYPE B W/TYPE 3 RING & COVER & VENT)
776 RIM-767.00' INV IN (30 ")= 758.01'
776
0 +00 0 +50 1 +00 1 +50 2 +00 2 +50 3 +00 3 +50
GRAFTON STREEET
EX. PROP.
AMMON LINE (TYP.
EXISTING R/W
EXISTING �• ::. FRAME
DWELLING
FRAME
DWELLING t
(PER GIS)
(PER GIS) �\
PROP. SMH41122
20' TOP RIM= 768.24'
TCE �''� /
j INV IN= 760.51'
1 I �! l V =FULL OF DEBRIS'
Jrl ' z
TREE TO REMAIN. PROTECT FROM
TRUCK TRAFFI a 1 I �REMO &;
VJ
k RESET`r
FE CEE
o
TOP RIM =, X y 1 z
CL INV =760
r o� i o
u X +
EX. 10' PRESCRIPTIVE EASEMENT
PROP. 20' SAN SWR EASEMENT
PROP. 30' TCE (TYP.) �� \
YXISTING CREEK BANK
TO BE REPAIRED PER
CHAEL STABILIZATION
DETAIL THIS SHEET
en (.TYP.)I ExPC5�0
SAN SEVMkIR TO BE
PRA /
MH W.` 1. 4 .
0
IN V= 768.83'
SMH41123
TOP RIM= 768.20'
CL INV= 760.50'
`EXISTING
FRAME
DWELLING
C
!, mD
_ z Z
a 18„ �
z
AhAPLE
/ �
INV= 764.43'
15 "CMP
X 00
776
INV 0
. I "' 1
A. 0+93.91
a
0
O
00
N
0
772
b
MH
#8 (TYPE
B W/TYPE
3 RING
COVER)
C O
x
� GV �
IM =767.0
10
R FLOC
• �A
W
O co
771.5
W n•
00 EL.
VENT
EL.= 773,5
W)
x
14V
IN (8"
=759.90
•
0� c` v
O
O
o^
• tn
o
ox3o�
2 CO
j
0 Q
p
I
4NV 0 UT =7
8.98
768
+
°
m ..
• f- z
o
O
772
W
m
O
'on
772
0
w
LEGEND
POP.
MH
9 (TYPE'
W/TYPE
3 RING
COVER)
N
771.5
rir
EL.=
PROPOSED SANITARY SEWER
CL
RI
=767.0
EASEMENT
®
EASEMENT
SSE
PROPOSED SANITARY SEWER
764
(�
I
IN (1 8w
= 760.07' I)
w
1
CIPP CIPP
CURED IN PLACE PIPE (CIPP)
. 8"
EXISTING SANITARY SEWER MANHOLE
OPEN CUT
I cs
= 10
EX.
11.00 P
SSMH 4114
1122
SWR
o
- ��i - ��
EXISTING WATER LINE
DI
EXISTING STORM DROP INLET
768
I" LL
- SS - ss --
EXISTING SANITARY SEWER
O CT
EXISTING SAN. SEWER CLEAN OUT
-
RI
= 768.24' ,(SEALED)
760
GAS
GAS LINE
-
768
Ll.
-- oe - oe
OVERHEAD ELECTRIC
®�'
EXISTING WATER METER
112
LF00.69�
SAN
EX• 8
SWR
n
LP
LIGHTPOLE
PROP.
18"
LL
(, j�
- -- ue - ue --
UNDERGROUND ELECTRIC
J
LL]
n,
n
I M
OUT =76C!
41'
Z �.
756
.1
�-
-
752
t0
M M
tQ
u)
^
N
ui
c 0,
.�
0► 01
v
^' t0
OD
M
t0
-
r
n n^
n
r
n
IST.
ui
\ `
"
R
E {ST.
764G
3RADE
764
,�1
1
1
EX. 18"
EC
18"
1
LI
Dill
TO REWUN
DP
760
127
1
fl
- -
- <i
-
-
- -
- -
-
760
X. 30
VCP 0
PROP.
18" VCPISAN
SWR
0.25
15
0 2.27
EX. 30
40'
PILE
CAP &
NIPROP
18" VCP'ISAN
SWR
0
756
VC
l
5'
1
!
C
PER
E
DETAIL
0 3.85X1
(
756
1
1
(TYP
)
ALL
PIPE TO B
t
EX. M*�HOLE TO
REMAIN
DI
L
CLASS 5
11
G 1 DIE!
RESTRAINED
JOIN
EX. 14 '
FILL MA', THOLE W
ONCRETE
TO
PIPE
BY GRIFFI
DIP TO
BE
ELEV OF' NEW INVERT
HEIGHT.
752
OR E U
15' MIN
ABANDONED
FORM NEW INVERT
PER TYP
752
IN PLACE
H -PILE
PER
748
,I
748
18 iNCH
SANITARY
SEINER
PROFILE
SC
ALE:
ORIZON
AL 1 "=
40'
VERTICA
1 " =4'
744
744
T
ui
0�
'i
U)
�
amC
o OD
Q%
co t
i
0 CU
OD 0s
V5
^ 0,
i
vv
LO
� o
N
v
�
�
�
Lc
n
r
L:
r,
N ko
r`
0 +00 0 +50 1 +00 1 +50 2 +00 2 +50 3 +00 3 +50
GRAFTON STREEET
EX. PROP.
AMMON LINE (TYP.
EXISTING R/W
EXISTING �• ::. FRAME
DWELLING
FRAME
DWELLING t
(PER GIS)
(PER GIS) �\
PROP. SMH41122
20' TOP RIM= 768.24'
TCE �''� /
j INV IN= 760.51'
1 I �! l V =FULL OF DEBRIS'
Jrl ' z
TREE TO REMAIN. PROTECT FROM
TRUCK TRAFFI a 1 I �REMO &;
VJ
k RESET`r
FE CEE
o
TOP RIM =, X y 1 z
CL INV =760
r o� i o
u X +
EX. 10' PRESCRIPTIVE EASEMENT
PROP. 20' SAN SWR EASEMENT
PROP. 30' TCE (TYP.) �� \
YXISTING CREEK BANK
TO BE REPAIRED PER
CHAEL STABILIZATION
DETAIL THIS SHEET
en (.TYP.)I ExPC5�0
SAN SEVMkIR TO BE
PRA /
MH W.` 1. 4 .
0
IN V= 768.83'
SMH41123
TOP RIM= 768.20'
CL INV= 760.50'
`EXISTING
FRAME
DWELLING
C
!, mD
_ z Z
a 18„ �
z
AhAPLE
/ �
INV= 764.43'
15 "CMP
X 00
776
0 +00 0 +50 1 +00 1 +50 2 +C
8 INCH SANITARY SEWER PROFILE
SCALE: HORIZONTAL 1"= 40'
VERTICAL 1"=4'
- EX. 15'
ALLEY
y
TOP RI
TOP RIM=
774.55'
- tNV OUT= 760.97'
\ I
EXISTING
FRAME
DWELLING \y -� EX. 10 PRESCRIPTIVE EASEMENT
PROP. 20' SAN SWR EASEMENT
PROP. 30' TCE TYP.)
5 / BOTTOM OF BANK /
/ (TYP.) /
M
�L I NEP
OF GRECyC ,
��
, y % \0
P. / �J PRO/ /cam/ CONTROL POINT #5
J CAP & REBAR
GROUND COORDINATES
N:853,323.9364 US FT
4 "SIPHON TOP F fA =769,0
E.-11627,766.3354 US FT
�� I TOP :1I 25 EL: 779.73' (NAVD 88)
(PER ANS) Ity -DEAD �' TOP ?IM= 781.77'
L CL , V= 758.39' -
EXISTING 14" SIPHON TCE TO BE ACCESSED
\ �t
TO BE SEE NOTES THIS (50' PUBLIC R /W) QOM TAYLOR ST. R/W
18"vcP 8,. SHEET SMH42878 CLEAR R/W AS
ROP. ' pop NECESSARY
\SS TOP RIM= 776.34'
H #7 3 os, i. -� INV OUT= 769.14'
UNDISTURBED STREAMBANK
0
a
0
O
00
N
0
772
b
Z O
C O
x
� GV �
,.? 5-p
10
R FLOC
• �A
W
O co
771.5
W n•
00 EL.
�
W)
x
•
0� c` v
O
O
o^
• tn
o
ox3o�
2 CO
j
0 Q
p
II
ti
it
768
+
°
m ..
• f- z
o
O
W
m
O
0
w
LEGEND
W
am it
rir
TEMPORARY CONSTRUCTION
PROPOSED SANITARY SEWER
CL
EASEMENT
®
EASEMENT
SSE
PROPOSED SANITARY SEWER
764
(�
EASEMENT
w
CIPP CIPP
CURED IN PLACE PIPE (CIPP)
. 8"
EXISTING SANITARY SEWER MANHOLE
OPEN CUT
I cs
EXISTING STORM CATCH BASIN
SAN
SWR
o
- ��i - ��
EXISTING WATER LINE
DI
EXISTING STORM DROP INLET
-
I" LL
- SS - ss --
EXISTING SANITARY SEWER
O CT
EXISTING SAN. SEWER CLEAN OUT
-
760
GAS
GAS LINE
-
Ll.
-- oe - oe
OVERHEAD ELECTRIC
®�'
EXISTING WATER METER
112
LF00.69�
SAN
EX• 8
SWR
UNDERGROUND TELEPHONE
LP
LIGHTPOLE
PROP.
18"
LL
(, j�
- -- ue - ue --
UNDERGROUND ELECTRIC
J
LL]
65o
EXISTING CONTOUR
FIRE HYDRANT
m
Z �.
756
752
t0
M M
tQ
u)
^
N
ui
c 0,
.�
0► 01
v
^' t0
OD
M
t0
N
to
r
n n^
n
r
n
ui
u;
0 +00 0 +50 1 +00 1 +50 2 +C
8 INCH SANITARY SEWER PROFILE
SCALE: HORIZONTAL 1"= 40'
VERTICAL 1"=4'
- EX. 15'
ALLEY
y
TOP RI
TOP RIM=
774.55'
- tNV OUT= 760.97'
\ I
EXISTING
FRAME
DWELLING \y -� EX. 10 PRESCRIPTIVE EASEMENT
PROP. 20' SAN SWR EASEMENT
PROP. 30' TCE TYP.)
5 / BOTTOM OF BANK /
/ (TYP.) /
M
�L I NEP
OF GRECyC ,
��
, y % \0
P. / �J PRO/ /cam/ CONTROL POINT #5
J CAP & REBAR
GROUND COORDINATES
N:853,323.9364 US FT
4 "SIPHON TOP F fA =769,0
E.-11627,766.3354 US FT
�� I TOP :1I 25 EL: 779.73' (NAVD 88)
(PER ANS) Ity -DEAD �' TOP ?IM= 781.77'
L CL , V= 758.39' -
EXISTING 14" SIPHON TCE TO BE ACCESSED
\ �t
TO BE SEE NOTES THIS (50' PUBLIC R /W) QOM TAYLOR ST. R/W
18"vcP 8,. SHEET SMH42878 CLEAR R/W AS
ROP. ' pop NECESSARY
\SS TOP RIM= 776.34'
H #7 3 os, i. -� INV OUT= 769.14'
UNDISTURBED STREAMBANK
EXISTING STREAM
BOTTOM DO
NOT DISTURB
RIP RAP TO
TO TOP OF BANK
EXISTING STREAM BOTTOM
EXISTING STREAM BANK
NORTH AMERICAN GREEN
C350 EROSION CONTROL LINER
(OR APPROVED EQUAL) ON ALL
DISTURBED .AREAS ABOVE TOP OF
BANK. SEED DISTURBED AREAS
PER CITY Cu= WINSTON SALEM
DPW ENGINEERING SPECIFICATIONS.
LLAYER OF FILTER FABRIC
MIRAFI 70OX OR EQUAL
CLASS B RIP RAP
MIN. 18" DEPTH EXCAVATE
AS NEEDED TO RECESS RIP
RAP INTO BANK
CHANNEL STABILIZATION DETAIL
NTS
DEMOLIS D. SEE / " PpSE , S 5 t�E� �as� j X r sMH41125A (3) EXISTING MANHOLES TO BE
NOTES THIS EET �/ . goon ' #4 7. ' c p J� TOP RIM = 772.82' AB4 DONED IN PLACE. GROUT PLUG ALL
INV IN 8 "= 762.02' INCOIAING PIPES. FILL MANHOLE 'IMTH
aK J_s CL INV= 758,14' #57 STONE. REMOVE MANHOLE TAP MIN.
Rocy�'�` SM 41121 2' BELOW GRADE AND BACKFILL. I
P �0 �
"a? r TO RIM= 768.33'
/ Q F0� 000:�. `+ / 5 ` ,`� z CL INV= 760.13'
° SMH41126
/ ED�y�I� 7 .mac- c� J`; K ' z TOP RIM= 7e 8.24'
/ PRO ` IN 758I0 s' 9.10'
CL
PLE � INV= 758I EXISTING 14" SIPHON ABANDONMENT NOTES: EXISTING 8" AERIAL ABANDONMENT NOTES:
I I m I CL
30`� P- " ° m I 1. ABANDON MAIN IN PLACE. PLUG MAIN AT 1. EXISTING AERIAL CROSSING TO BE ABANDONED
�YPLE� TOP RIM= 768.33'
Ooh Iz MANHOLE WITH MIN. 2 GROUT. IN PLACE AND DEMOLISHED AS NOTED BELOW.
�' INV IN =FULL OF DEBTS
ftE = 14API E I INV OUT= 760.28' 2. FILL UPSTREAM SIPHON MANHOLE WITH 2. ALL VISIBLE PIPING SHALL BE DEMOLISHED AND
p� CHERRY CONTROL POINT #4 CONCRETE TO NEW INVERT ELEVATION. SHAPE NEW HAULED OFF SITE FOR DISPOSAL. DEMOLITION OF
/ 22y; ° CAP &REBAR ! INVERT PER TYPICAL MANHOLE DETAIL. PIPE SHALL EXTEND MIN. 5' INTO CREEK BANK.
GROUND COORDINATES EXISTING 30 " SAN EWER TO BE LINED
22" WAPL = N:853,085.9949 US FT VIA CIPP. SEE CIPF SHEETS FOR ', 3. ALL OTHER MANHOLES TO BE ABANDONED 3. ALL OPEN ENDS OF PIPE TO BE ABANDONED IN
APLE SMH41120 E 1,627,866.8919 US FT
' (NAVD 88) DETAILS (TYP.) SHALL HAVE ANY INCOMING PIPES PLUGGED WITH PLACE SHALL BE PLUGGED WITH GROUT.
L DRIVE TOP RIM= 767.06' EL:765.08 GROUT. FILL MANHOLE WITH CRUSHED STONE.
� INV 1N 8 "= 760.48' 4. 8" MAIN SHALLED BE PLUGGED WITH GROUT AT
4 \ SMH41119 CL INV= 757.76' REMOVE TOP OF MANHOLE TO MIN. 2' BELOW DOWNSTREAM MANHOLE. DOWNSTREAM MANHOLE TO
y > � ��� TOP RIM = 767.35' GRADE. REMAIN IN SERVICE.
40 CL INV= 757.60'
/ IR� I I I I I 3. BACKFILL TO EXISTING GRADE WITH SOIL.
n
u
GRAPHIC SCALE
J
Apprvd.
,1
k, Date:
10 -31 -13
is
10V h
IN FEET
1 nch = 40 ft.
FINAL DRAWING - NOT RELEASED
FOR CONSTRUCTION
Chkd:
JD
Drwn:
SM
Scale:
111=40'
Project Number:
Sheet: PP-3
a
0
O
00
N
b
Z O
C O
� GV �
• �A
W
A 00 Z
I.
A
0� c` v
�
o a
w
O
m
0
w
LEGEND
W
- TCE TCE
TEMPORARY CONSTRUCTION
PROPOSED SANITARY SEWER
CL
EASEMENT
®
EASEMENT
SSE
PROPOSED SANITARY SEWER
(�
EASEMENT
w
CIPP CIPP
CURED IN PLACE PIPE (CIPP)
L?�'H
EXISTING SANITARY SEWER MANHOLE
OPEN CUT
I cs
EXISTING STORM CATCH BASIN
- ��i - ��
EXISTING WATER LINE
DI
EXISTING STORM DROP INLET
-
I" LL
- SS - ss --
EXISTING SANITARY SEWER
O CT
EXISTING SAN. SEWER CLEAN OUT
_
z
GAS
GAS LINE
Ll.
-- oe - oe
OVERHEAD ELECTRIC
®�'
EXISTING WATER METER
C
-- U' -- u t
UNDERGROUND TELEPHONE
LP
LIGHTPOLE
,�
LL
(, j�
- -- ue - ue --
UNDERGROUND ELECTRIC
J
LL]
65o
EXISTING CONTOUR
FIRE HYDRANT
m
Z �.
er
EXISTING STREAM
BOTTOM DO
NOT DISTURB
RIP RAP TO
TO TOP OF BANK
EXISTING STREAM BOTTOM
EXISTING STREAM BANK
NORTH AMERICAN GREEN
C350 EROSION CONTROL LINER
(OR APPROVED EQUAL) ON ALL
DISTURBED .AREAS ABOVE TOP OF
BANK. SEED DISTURBED AREAS
PER CITY Cu= WINSTON SALEM
DPW ENGINEERING SPECIFICATIONS.
LLAYER OF FILTER FABRIC
MIRAFI 70OX OR EQUAL
CLASS B RIP RAP
MIN. 18" DEPTH EXCAVATE
AS NEEDED TO RECESS RIP
RAP INTO BANK
CHANNEL STABILIZATION DETAIL
NTS
DEMOLIS D. SEE / " PpSE , S 5 t�E� �as� j X r sMH41125A (3) EXISTING MANHOLES TO BE
NOTES THIS EET �/ . goon ' #4 7. ' c p J� TOP RIM = 772.82' AB4 DONED IN PLACE. GROUT PLUG ALL
INV IN 8 "= 762.02' INCOIAING PIPES. FILL MANHOLE 'IMTH
aK J_s CL INV= 758,14' #57 STONE. REMOVE MANHOLE TAP MIN.
Rocy�'�` SM 41121 2' BELOW GRADE AND BACKFILL. I
P �0 �
"a? r TO RIM= 768.33'
/ Q F0� 000:�. `+ / 5 ` ,`� z CL INV= 760.13'
° SMH41126
/ ED�y�I� 7 .mac- c� J`; K ' z TOP RIM= 7e 8.24'
/ PRO ` IN 758I0 s' 9.10'
CL
PLE � INV= 758I EXISTING 14" SIPHON ABANDONMENT NOTES: EXISTING 8" AERIAL ABANDONMENT NOTES:
I I m I CL
30`� P- " ° m I 1. ABANDON MAIN IN PLACE. PLUG MAIN AT 1. EXISTING AERIAL CROSSING TO BE ABANDONED
�YPLE� TOP RIM= 768.33'
Ooh Iz MANHOLE WITH MIN. 2 GROUT. IN PLACE AND DEMOLISHED AS NOTED BELOW.
�' INV IN =FULL OF DEBTS
ftE = 14API E I INV OUT= 760.28' 2. FILL UPSTREAM SIPHON MANHOLE WITH 2. ALL VISIBLE PIPING SHALL BE DEMOLISHED AND
p� CHERRY CONTROL POINT #4 CONCRETE TO NEW INVERT ELEVATION. SHAPE NEW HAULED OFF SITE FOR DISPOSAL. DEMOLITION OF
/ 22y; ° CAP &REBAR ! INVERT PER TYPICAL MANHOLE DETAIL. PIPE SHALL EXTEND MIN. 5' INTO CREEK BANK.
GROUND COORDINATES EXISTING 30 " SAN EWER TO BE LINED
22" WAPL = N:853,085.9949 US FT VIA CIPP. SEE CIPF SHEETS FOR ', 3. ALL OTHER MANHOLES TO BE ABANDONED 3. ALL OPEN ENDS OF PIPE TO BE ABANDONED IN
APLE SMH41120 E 1,627,866.8919 US FT
' (NAVD 88) DETAILS (TYP.) SHALL HAVE ANY INCOMING PIPES PLUGGED WITH PLACE SHALL BE PLUGGED WITH GROUT.
L DRIVE TOP RIM= 767.06' EL:765.08 GROUT. FILL MANHOLE WITH CRUSHED STONE.
� INV 1N 8 "= 760.48' 4. 8" MAIN SHALLED BE PLUGGED WITH GROUT AT
4 \ SMH41119 CL INV= 757.76' REMOVE TOP OF MANHOLE TO MIN. 2' BELOW DOWNSTREAM MANHOLE. DOWNSTREAM MANHOLE TO
y > � ��� TOP RIM = 767.35' GRADE. REMAIN IN SERVICE.
40 CL INV= 757.60'
/ IR� I I I I I 3. BACKFILL TO EXISTING GRADE WITH SOIL.
n
u
GRAPHIC SCALE
J
Apprvd.
,1
k, Date:
10 -31 -13
is
10V h
IN FEET
1 nch = 40 ft.
FINAL DRAWING - NOT RELEASED
FOR CONSTRUCTION
Chkd:
JD
Drwn:
SM
Scale:
111=40'
Project Number:
Sheet: PP-3
#3 STIR
#3 STIR
BELOW
(BEYONI
HP12x5;
STEEL F
NOTES:
2-1/4"x3" GALV STRAPS WITH
1/4"x2 1/2" NEOPRENE FAD
ADHERED TO STRAP
1/4 "x6" NEOPRENE
PAD ADHERED TO
SADDLE
3/4 "0 GALV
ANCHOR BOLTS
ASTM A307
OR A36 - -`
0
I
X53
PILE
1. PILE SUPPORTED FOUNDATION DESIGN SHOWN ON
THIS DETAIL IS BASED UPON THE FOLLOWING
PARAMETERS:
MINIMUM CAPACITY OF HP12x53 PILE = 20
TONS
CONCRETE COMPRESSIVE STRENGTH = 4000
PSI
GRADE 60 REINFORCING STEEL
MAXIMUM STREAM VELOCITY = 10 =T /SEC
IF FIELD CONDITIONS REQUIRE ANY DEVIA'TION FROM
2. THESE PARAMETERS, FOUNDATION DESIGh� SHALL BE
REVIEWED BY THE ENGINEER.
LENGTH OF PILES SHALL BE AS REQUIRED TO
DEVELOP 20 TON CAPACITY BY EITHER END
BEARING, FRICTION OR A COMBINATION G= END
BEARING AND FRICTION. AS A MINIMUM, :)ILES
SHALL BE DRIVEN AT LEAST 15 FEET INTO
UNDISTURBED SOIL, BENEATH THE LEVEL OF THE
CREEK BED.
„ ms
SNUG FIT
#3 STIRRUPS
@6 ", TYP
4 — #4, TYP
4—#4
4— #7
#3 CIRCULAR
HOOPS, TYP
PROA r taa. 2013 -0040
FIGURE 5 Gavel &Dorn Engineering, PLLC
FIGURE 5 PILE CAP DETAIL 6730 Freedom Drive
SCAM; WINSTON-SALEM I FORSYTH COUNTY PUBLIC UTILITIES Charlotte, NC 28214
N/A PETERS CREEK SANITARY SEWER 704 -483 -2054
DATE: 09 -16 -2013 REHABILITATION PROJECT License No. P -0601
NOTES
1.
INLET
MAINTENANCE SHALL BE DOCUMENTED
IN PROJECT LOG BOOK.
2.
FILTER
TYPES, SHALL BE APPROVED BY THE
CITY INSPECTOR PRIOR
(OPTION A )
TO INSTALLATION.
3.
FILTER
BAGS MAY BE REMOVED WHEN SITE
IS STABILIZED AT
m p�/�
SfY
THE DIRECTIG
N OF THE ENGINEER.
4.
FILTER
BAGS SHALL BE REMOVED PRIOR TO
STREET ACCEPTANCE.
5.
FILTER
BAGS SHALL BE CLEANED OR REPLACED
ON A REGULAR
BASIS
(NOT 3E MORE THAN HALF FULL AT
ANY TIME).
HOOD GRATE -- �**
1" REBAR FOR
REMOVAL FROM
FILTER I
I�111,�I�i
CATCH BASIN
DEFLECTOR
)UTLET
I N STALLATI 0 N
SECTION
SEDIMENT INLET PROTECTION DEVICE
DETAIL
NTS
FINAL DRAWING -- NOT RELEASED
FOR CONSTRUCTION
ilk
'018,
it
i'
i
r
r
1
i
i
I
U t`
o
a 00
U
z O
LO o
a c°v w
W p 0z
o
� a
I
�I
�I
Apprvd.
PAVEwEkT REPAER DETAIL NCDFT /DiV 9/01ST2
Date:
ILL & PATCH METHOD
10 -31 -13
(OPTION A )
PAVEMENT TO BE SAW
Drwn:
CUT PERPENDICULAR
m p�/�
SfY
Scale:
CENTER TO SURFACE. FACE TO BE
NTS
OF
PATCH MEAT, CLEAN & STRAIGHT.
TACK PRIOR TO PATCH.
I
EXTENT OF THE MILL JANO ASPHALT INLAY
TO BE OETERMINEOBY THE ENIIINEER � ..••`��
I
_
MILL 2® & REPLACE WITH 2' SF9.5A
1/2® 119.013
' EXISTING
PAVEMENT
4 1/2' 119.OB ;STRUCTURE
I
I THIS IS THE MINIMUM
/ PAVEMENT STRUCTURE
Z I TO BE USED UNLESS
/ OTHERWISE DIRECTED
I BY THE ENGINEER
M /
I
f.
FLOWABLE FILL (CONCRETE) NO SUBSTITUTION OR
DEVIATION FROM THIS
OR AS APPROVED BY ENGINEER
f STANDARD WILL BE
/J (TRAFFIC BEARING ROAD PLATE ALLOWED WITHOUT PRIOR
OR STEEL PLATE CAN BE USED APPROVAL BY THE ENGINEER.
FOR 24 HOURS DURING CURING i
OF CONCRETE)
/ f �
f f
i
MIN PROPOSED MIN
s' UTILITY I' 'PLANIVIEW*
y MILL MILL
o /
OQ O �gg� OHO -- — -- - - - -- LANE
STONE STABILIZATION I
ACTUAL PATCH AREA LANE
I
UNDISTURBED SIDIL/
•PR4IILE VIEW
NOTES IF ENGINEER APPROVED. THEN THE BACKFILL (AGGREGATE BASE COURSE _
OR SUITABLE SUBGRADE) SHALL BE MADE IN 6' LAYERS AND SHALL BE COMPACTED
TO AT LEAST 95% OF STANDARD OENSITY (AASHTO METHOD T -99). EACH LAYER J D € STR€CT ENGIN E�
MUST BE THOROUGHLY TAMPED BY A MECHANICAL TAMP BEFORE THE NEXT LAYER
IS PLACED. ALL ASPHALT PAVEMENT REPLACED SHALL BE IN ACCORDANCE WITH
THE MOST CURRENT N.C.D.O.T. STANDARD SPECIFICATIONS. BASE COURSE DENSITY
EFFECTIVE B-18-03
SHALL BE 100 %. REVISED 11-09-04 BY PSG
repairdetailZdgn 5/28/2009 11:28:12 AM
FINAL DRAWING -- NOT RELEASED
FOR CONSTRUCTION
ilk
'018,
it
i'
i
r
r
1
i
i
I
U t`
o
a 00
U
z O
LO o
a c°v w
W p 0z
o
� a
I
�I
�I
Apprvd.
Date:
10 -31 -13
Chkd:
JLD
Drwn:
m p�/�
SfY
Scale:
NTS
Project Number:
Sheet: D