Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0036090_Regional Office Historical File Pre 2018
Beverly Eaves Perdue Governor NCDENR North Carolina Department of Environ en t and Natura Resources Division of Water Quality Charles Wakild, P E. Dee Freeman Director Secretary August 13, 2012 Mr. Tim J. Drake, Vice -President Engineering Norfolk Southern Railway Company 1200 Peachtree Street, NE Atlanta, GA 30309-3579 Subject: Permit No. WQ0036090 Charlotte Intermadal Facility Wastewater Collection System Extension Mecklenburg County, North Carolina Dear Mr. Drake: In accordance with your complete application received on August 1, 2012, we are forwarding herewith Permit No. WQ0036090, dated August 13, 2012, to Norfolk Southern Railway Company, for the construction and operation of the subject wastewater collection system extension, This permit shall be effective from the date of issuance until rescinded, and shall besubject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference. Please pay particular attention to Permit Condition 3, which requires that the wastewater collection facilities be property operated and maintained in accordance with 15A NCAC 2T .0403 or any individual system -wide collection system permit issued to the Permittee. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 1) 15A NCAC 2T; 2) the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; 3) and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted August 1, 2000, as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application„ It shall be the Perrrlittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office Location. 610 East Center Avenue, Susie 301, Mooresville, NC 28115 Phone,. (704) 663-'1699 \ Pax: (704) 663-6040 Internet: http.//portal.ncdenr.org/webiwq An Equal Opportunity \ Affirmallve Action Employer — 50% Recycled/1 O % Post Consumer paper One North Carolina �aturallij pr Mr. Tim J. Drake August 13, 2012 Page Two In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted for the construction and operation of approximately 330 linear feet of 8-inch gravity sewer, 195 linear feet of 6-inch gravity sewer, a 0.00165 MGD pump station (32 gpm@79' TDH), a 0.00075 MGD pump station (37gpm@76' TDH), 2528 linear feet of 2-inch force main, and the discharge of 2,400 gallons per day of collected domestic wastewater into the City of Charlotte existing sewerage system in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted August 1, 2000, as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. The sewage and wastewater collected by this system shall be treated in the McAlpine Creek WWTP (NPDES No. NC0024970) prior to being discharged into the receiving stream. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This request must be in the form of a written_ petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made, this permit shall be final and binding. If you need. additional information concerning this matter, please contact Mr. Michael Parker at (704) 235-2194. Electronic copies: Cc: Sincerely, for Chuck Wakild, P.E. Erin Hall, Mecklenburg County Development of Water Quality Willis Horton, Mecklenburg County Duane Sharrer, PE, The Schneider Corporation Barbara Gross, CMU Mooresville Regional Office, Collection System Permit File Surface Water Protection Central Files PERCS NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES RALEIGH WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specified conditions and limitations: 1. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996, as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted August 1, 2000, as applicable; and other supporting materials unless specifically mentioned herein. 2. This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. 3. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met as provided in 15A NCAC 2T .0403: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and any contravention of the groundwater standards in 15A NCAC 2E...0200 or the surface water standards in 15A NCAC 2B .0200. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan shall be developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six-month period of time. f. A general observation of the entire sewer system shall be conducted at least once per year. g. inspection and maintenance records shall be maintained for a period of at least three years. h. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. 4. This permit is not transferable. In the event there is a desire for the wastewater collection •facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. 5. Construction of the gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in, an overflow or bypass discharge of wastewater to the surface waters of the State. 6. Per 15A NCAC 2T .0116, upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents to the address provided on the form. A complete certification is one where the form is fully executed and the supporting documents are provided as applicable. 7. A copy of the construction drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. 8. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted August 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C. 9. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. 10. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state and federal) which have jurisdiction, including but not limited to applicable river buffer rules in 15A NCAC 2B .0200, erosion and sedimentation control requirements in 15A NCAC Ch. 4 and under the Division's General Permit NCG010000, and any requirements pertaining to wetlands under 15A NCAC 2B .0200 and 15A NCAC 2H .0500. 11. Noncompliance Notification: The Permittee shall verbally report to a Division of Water Quality employee at, the Mooresville Regional Office, telephone number (704) 663-1699, as soon as possible, but in no case more than 24 hours or on the next working day, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport, such as mechanical or electrical failures of pumps, line blockage or breakage, etc.; or 2 b. Any failure of a pumping station or sewer line resulting in a by-pass directly to receiving waters without treatment of all or any portion of the influent to such station or facility. Voice mail messages or faxed information is permissible, but shall not be considered as the initial verbal report, Overflows and spills occurring outside normal business hours may also be reported to the Division of Ernergency Management at telephone number (800) 858-0368 or (919) 733-3300, Persons reporting any of the above occurrences shall file a spill report by completing Part I of Form CS-SSO (or the most current Division approved form), within five days following first knowledge of the occurrence, This report shall outline the actions taken or proposed to ensure that the problem does not recurPart II of Form CS-SSO (or the most current Division approved form) can also be completed to show that the SSO was beyond control. Permit issued this the 13th day of August, 2012 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION vI-- ,f6r Chuck Wakild, RE., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number WQ0036090 3 Permit No. WQ0036090 August 13, 2012 OwnerIWQCS Tim J. Drake, VP Engineering Norfolk Southern Railway Company 1200 Peachtree Street, NE Atlanta, GA 30309-3579 PE Duane Shaffer, PE The Schneider Corporation 8901 Otis Avenue Indianapolis, IN 46216 Complete and submit this form to the permit issuing regional office with the following: • One copy of the project record drawings (plan & profile views of sewer lines) of the wastewater collection system extension • Supporting design calculations (selected pumps, system curve, operating point, available storage if portable generator(s) or storage greater than longest past three year outage reliability option selected) for any pump stations permitted as part of this project • Changes to the project should be clearly identified on the record drawings or in written summary form. Permit modifications are required for any changes resulting in non-compliance with this permit, regulations or minimum design criteria. This project shall not be considered complete nor allowed to operate until this Engineer's Certification and all required supporting documentation have been received by the Division. Therefore, it is highly recommended that this certification be sent in a manner that provides proof of receipt by the Division. ENGINEER'S CERTIFICATION ❑ Partial ❑ Final , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (0 periodically, ❑ weekly, ❑ full time) the construction of the Charlotte lntermodal Facility, a Mecklenburg County project for the Permittee, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted November 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's seal, signature, and date: SEND THIS FORM & SUPPORTING DOCUMENTATION WITH REQUIRED ATTACHMENTS TO THE FOLLOWING ADDRESS MOORESVILLE REGIONAL OFFICE SURFACE WATER PROTECTION 610 EAST CENTER AVENUE, SUITE 301 MOORESVILLE NC 28115 The Permittee is responsible for tracking all partial certifications up until a final certification is received. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. 4 0 1I z 0 'ib, LISE THE TAB KEY TO MOVE FROM FIELD TO FIELD, 1. OwnerlPermittee: la. Norfolk Southem Railway Company Full Legal Name (company, municipaGity, HOA, utility, etc.) E� Signing Official Name and Title (Please review 15A NCAC 2T .01 The legal ent ty who will own this system is: Individual ❑ Federal 0 Municipality 0 Stet id. 1200 Peachtree Street, NE Mailing Address 1 f. GA State 1 h. 404.529,1252 Telephone 2. Project (Facility) 2a. Charlotte Intennodal Facili Brief Project Name (permit wil /. Contact Person: Kent F, Schu P.E. Proj� Name and Affiliation of Someon 3b. 31 7,826.7380 404..529,1371 Facsimile ., itan: fer to is name) b) for authorized signing officials! ounty © Private Partnership Corporation 01 k.~e qr.( cify): Di vui.K)N OF VVATRR le. Atlanta City 1g, 30309-3579 Zip Code ij E-mail 2b. Mecklenburg ounty Where Project is ct Designer, The Schneider Corporation ho Can Answer Questions About this Application 3c, kschuch@schneidercorp.com Phone Number Project is ►4' New ❑ Modificati n to 2. Owner is 0 Public (skip to item 8(3)) 2a, If private, applicant will be: E-mail odification, Permit No,: go to Item 2(a)) 2b. If sold, facilities owned by a ►:+ Retaining Ownership (i.e, store, church, single office, etc.) or Leasing units (lots, townhomes, etc. - skip to item B(3)) Selling units (lots, townhomes, etc. - go to item B(2b)) Charlotte -Mecklenburg Utilities Owner of Wastewater Treatment Facility (VMITF) Treating Wastewater From "fhis Project ❑ Public Utility (Instruction. C) ❑ Homeowner Assoc,/Developer (Instruction D) 4b Name of WWTF '5a. Charlotte -Mecklenburg Utilities Reserving S Owner of Downstream Sewer 8. The origin of this wastewater is (check all that apply): ❑ Residential Subdivision 0 Apartments/Condominiums Mobile Home Park. ❑ School Restaurant Office Gravi ze L Force ❑ Retail (Stores, shopping ❑ Institution ❑ Hospital ❑ Church 0 Nursing Home ❑ Other (specify): Fuel Station and Service Garage nters) Volume of wastewater to be el)oceti or}Derrnitted for this particular project: "Do not include future flows or pfrevlously permitted allocations If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this 0 Flow has already been allocated in Permit No. Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) Downstream Sewe 100 % Domestic/Commercial % Industrial (attach I description.) (RO: contact your Regional Office Pretreatment staff) °% Other (specify): 00. gallons per day FTA 12/07 z 0 f) Z Q 2 Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value In Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). Administration building with 30 employees (3 shifts with 10 employees each) 25ga1/employee/shift = 750 gal echanicat/Crew building with 60 employees (3 shifts with 20 employees each) 25ga1/employeeishift = 1,500 gal ocomotive dump station (3 tanks per day) 50 gal/tank = 150 Qat Total zz 2,400 gal l0. Summary of Sewer Lines to be Permitted (attach additional sheets tf necessary) Size (inches) Length (feet) S" PVC lateral to property line 195 feet " PVC gravity sewer in public New Gravity or Additional Force Maln 0 feet New Grav'it New Gr Summary of Pump Stations wi assoclated Force Mains to be Permitted (attach additional sheets as necessary) ump St, rtion Location ID ©llT)f (self chosen • as shown on plans/map for reference Design Flow (MGD) Operational Poin GPM @TDH 79' Power Reliability Option - permanent generator MATS; 2 portable generator w!MTS in Size Force Main Length 00 t.F Pump Station Location ID NORTH Design Flow Operational Poin (MGD) GPM @TDH .00071 7 gp6TDH (seat' chosen - as shown on piansirnap for referen Power Reliability Option - permanent generator wiATS; 2 - portable generator w1MTS Force Main Size Force Main Length Pump Station Loca' Design Flow (MGD) n ID (self chosen - as shown on plans/map for ref Operational Poin GPM @TDH Power Reliability Option - permanent generator MATS; 2 - portable generator w1MTS Force Main Size Force Main Length 12. Will the wastewater flow in the proposed sewer sines or pump stations be able to be directed to another treatment facility? Yes No If Yes, permit number of 2nd treatment facility RO if "yes' to 6,12 please contact the Central Office PERCS Unit) . Does Me sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and For Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? Yes 0 No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION F'TA 12/0 7 14. Have the following permits/certifications been submitted for approval for the system or erect to be served? Wetland/Stream Crossings - General Permit or 401Certification' 0 Yes 0 No + N/A Sedimentation and Erosion Control Plan? i$I Yes 0 No 0 N/A Stormwater? Yes [i No 0 N/A Does this project include any high priority lines, (see 15A NCAC 02T .0402 (2)1 involve aerial lines, siphons, or interference manholes)? These lines will be considered blob priority and must be checked Once every six months Check if Yes: 0 and provide details Owner/Pernni Certification. (Signature of Signing Official and Protect Name) attest that this application for NSRR mien dal.Facility has been is accurate and complete to the best of my knowledge, l understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.68, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as weN as civil penalties up t 25,000 per violation.. ning NGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF' THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY! TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NCAC 02T .0305 Date Professional Engineer's Certification, (Signature of Design Engineer and Project Nam.) Duane Sharrer, P. . attest that this application for NSRR Intermodal Facility . has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. l further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-21508, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. '2a. Duane Sharrer, P.E. Professional Engineer Name 2b. The Schneider Corporation Engineering Firm 2c. 8901 Otis Ave Mailing Address 17-826-7100 2h. 317-825-72 Telephone Facsimile IN ;2f. 21 State Zip sha neidercorp. com E-mail ©i�G SEAL 030685 NC PE Seal Signature 8 [late F i"A 12/07 CHARLOTTE-MCKtaNBU RCS UTIU April 30, 2012 Mr. Kent Schuch The Schneider Corporation 8901 Otis Avenue Indianapolis, IN 46216 SUBJECT: WATER AND SEWER FLOW ACCEPTANCE NORFOLK SOUTHERN RR - CHARLOTTE INTERMODAL FACILITY TAX PARCEL# 141-131-25 C-MU TRACKING# 800-12.547 A flow acceptance study of the subject site has been completed and the following has been determined: Charlotte -Mecklenburg Utilities agrees to accept the gravity sewage flow of 2,400 gallons per day (see attached flow calculations) from this project for transmission to the McAlpine Creek Wastewater Treatment Plant; NPDES permit number NCO024970, for treatment. This acceptance of flow is based on the existing capacity of the designated publicly owned treatments works, Please see attached FTSE form, Charlotte -Mecklenburg Utilities agrees to furnish water to the subject project. The water quality to the subject project is regulated by the State Drinking Water Act Amendments of 1986, and The Water Supply Management Plan, dated October 2005, (WSMP # 05.01702 & PWS ID # 0160010), on file with the Public Water Supply Section of NCDENR. However, Charlotte -Mecklenburg Utilities cannot guarantee a constant pressure or quality of flow. Due to the involvement of other agencies and continuing growth of the water and sewer syster'n, the ability to provide service for future projects cannot be guaranteed nor reserved, Connection to the Charlotte -Mecklenburg Utilities system is accepted on a first come, first served basis. The applicant should understand that this letter is not authorization to construct private water or sewer systems, as the appropriate Local or State permits are required prior to construction. tt the appropriate authorization to construct permits are not obtained and construction has not started wltl dd nee (1) year of of rescinded and a new me at ('704) 432-5801, Sincerely, Barbara Gross Engineering Assistant New Services Section ce static e ietfer, and aliment for an v service canne ction('sj has root been received acceptance letter, ttai flow acceptance apprnva(sha tudv must be made, if you have any questions, you may contact CHARLOTTE-MECKLENBURG UTif»I `L S ,. Engineering Division * New Services Section www, cmutillties. c€rm 700 North Tryon Street Charlotte, NC 28202 Ph: 704/432-5801 Fax: 704/432-5804 PR,VECT: LOCATION: T$C NZ DESCRIPTION FLOW CALCULATIONS Total Aran # Pow TcLaI Aran, Paw t+od a Peaking Factor Total Ptah Flow tgpet) r. ausinusses, ct cca ar :eta s a�'a" shi3t Lump 5tatirn A:pm xirnate y 3 tra,t )s oet day at 50 ezlic E silts nl Acifir ;II3ttatien 5+Jartg 10 eerr411cptlrQs,Ishtft, 3 st+iftsfdav �r!rchSnica{ f Craw u g = 70 e'rbitlyteslt,hift, 3 sh'Ets/dasy 7,3 CRC DATE DATE: 06F»L69VOL Department of Enviro State of North Carolina ent and Natural Resources Division of Water Quality Flow TracLing/Acceptance for Sewer Extension Permit Applications (FTSE—10/07) Project Applicant Name: The Schneider Corp©r ion Project Name for which flow is being requested: N.or Soutnern. Raa iroad - nari stt :a az a i i• ity More than one FTS'i-I0/07 may, be required for a single project 4 t1re owner of the WWTP is not responsible for al! pump stations along the route of the proposed wastewater ow. I. Complete this suction only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Sr*;ttin Creek, a ar b. WWTP Facility Permit #_ NC0024970, NCO024945, NCcC497 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used All flows are in MGD 10.40 66.8 0.0024 78.016 78.8% IL Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firrn/Design) Daily Flow, MGD ti+an Statement: -ear. ; , , certify that, to the hest of my knowledge, the addition of tine volume of w aaewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which I am. the responsible party. Signature of this form indicates acceptance of this ; water tlo... gna(ure Date CONNECT TO EXISTING SANITARY MANHOLE STREET VIEW MAP 2011, THE SCHNEIDER CORPORATION LATITUDE: 35° 111 22" N LONGITUDE: 80° 57' 29" W 1HE SCHNEDER CCRPORAIMA Historic Fort I4cM co 8901 Otis Avenue incimapdis, IN 46216-1037 Telephone: 317.825,7100 Fax; 317,11263200 www, schneldercap, cam DATE: 05%P 0/12 DRAWN BY: BDP PROJECT NO+: 7302.003 CHECKED OY: KFS DRAWNG FILES: T:\7x\7302\003\©wf;S\7302003_NSRelhiF A10E*NECT NORFOLK SOUTHERN RAILROAD COMPANY INTERMODAL FACILBTY SITE, CHARLOTTE, N.C. J TOPOGRAPHIC MAP 2011, THE SCHNEIDER CORPORATION LATITUDE:. 35° 11'38"N LONGITUDE: 80° 57' 32" W Sdneider THE SCHNEIDER CCRIVRAIXI4 H'stork Fart Hrrr+son 6901 Otis Awe Indwnopolis, IN 46216-1037 Telephone; 317,826,7100 Fox: 317,826.7200 arwrw.schlTeideRcorp.com OA 05/10/12 PPCT,SECT NOs 7302003 A BY: BDP CHECKED BY: KFS NORFOLK SOUTHERN RAILROAD COMPANY INTERMODAL FACILITY SITE, CHARLOTTE, N.C, DRAINING FILES, T; \nc\73o2\003 s\7 o2 cl F TE AP FORM WSCAS-12/©7 WATERSHED CLASSIFICATION ATTACHMENT FOR SEWER SYSTEMS Applicant, Name Norfolk. Southern Railway Company Project Name NSRR Intermodal Facility, Charlotte, NC Professional Engineer Name Duane Sharrer, P.E. Location ID Name of Waterbody' UT to Coffey Creek Engineering Firm. Name The Schneider Corporation County Mecklenberg River Basin Catawba River Basin Waterbody Stream Index No. 11-137-4 unna'rted, indicate "unnamed tributary to X", where X is the named waterbody to which the unnamed tributary joins. l certify that as a Registered Professional Engineer in the State of North Carolina that l have diligently followed the Division's instructions for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief PE Seal, Signature and Date *** END OF' FORM WSCAS-12/07 *** FORM: WSCAS-12/07 GIN¶- 11000 Waterbody Classification C Page 1 of I 2C) August 7, 2012 NCDENR Morresville Regional Office 610 East Center Avenue Mooresville, NC 28115 Re: NSRR Intermodal Facility Grinder Stations and Force Main NCDENR Approval Request Charlotte, NC Dear Permit Reviewer, IN 46216 t,t 'zi Phase: 3 1326y,71.. 0 This letter is to transmit to your office the application and supporting documents required for a permit from NCDENR to construct two small grinder stations and force mains to serve the proposed facilities at the NSRR Intermodal Facility being constructed at the southern end of the airport property in the vicinity of Byrum and West Road intersection. The 2 stations are on the NSRR property and will remain as private facilities that serve only their needs. The total estimated flows from the 2 stations is 2,400 gpd when fully occupied and in service. If you have any questions regarding the above information please contact me by phone (866) 973-7100 or direct dial (317) 826-7380. Also my e-mail is kschuchcfcschnedercorp ,corn Respectfully, The Schneider Coworation ent F. Schuch, P.E., IN Senior Project Manager Cc: File': t17k1730210031permits\ncdenrincdenr transmittaLdacx Indian; Tt,tt Fort Harr West Lafayette, Itre iayta 13fa) r01,r, Ankeny, Iowa Permit Number WQ0036090 Central Files: APS SWP 08/13/12 Permit Tracking Slip Program Category Status Project Type Non -discharge Active New Project Permit Type Fast Track Version Permit Classification Gravity Sewer Extension, Pump Stations, & Pressure Sewer 1.00 Individual Extensions Primary Reviewer Permit Contact Affiliation michaef.parker Coastal SW Rule Permitted Flow 2400 Facility Facility Name Charlotte Intermodal Facility Location Address Owner Major/Minor Region Minor Mooresville County Mecklenburg Facility Contact Affiliation Owner Name Owner Type Norfolk Southern Railway Company Non -Government Owner Affiliation D F Julian 1200 Peachtree St N E Box 13 Atlanta GA 30309 Dates/Events Orig Issue App Received Draft Initiated 08/13/12 08/10/12 Scheduled Issuance Public Notice Issue Effective Expiration 08/13/12 08/13/12 Regulated Activities Requested/Received Events Office Wastewater collection Outfall NULL Additional information requested Additional information received Waterbody Name Stream Index Number Current Class Subbasin