Loading...
HomeMy WebLinkAbout20131208 Ver 1_Riparian Buffer Authorization_20131119W BARrLETT & sMMR PC 1906 Nash Street North Wilson, NC 27893 -1726 Phone: (252) 399 -0704 Fax: (252) 399 -0804 www.bartlett.us.com November 18, 2013 North Carolina Department of Environmental & Natural Resources NC DWR, 401 & Buffer Permitting Unit Attn: Buffer Authorization 1650 Mail Service Center Raleigh, NC 27699 -1650 20131208 REFERENCE: ROCKY MOUNT - WILSON REGIONAL AIRPORT- BUFFER AUTHORIZATION To Whom It May Concern: Please find herewith: • Buffer Authorization Application (Original and two copies) • Agent Authorization Form • Vicinity Map • Narrative • Soil Survey Map • USGS Quad Map • Site Plan Should you have any questions or require additional information, please do not hesitate to call our office. Respectfully, � l on Meade Environmental Specialist Enclosures P \ PROJECT FILES\RWI Airport\13.037 WATER & ROADWAY ROROVEMENTS\S&MBuffer Author Submittal Letter doe U NOV 1 9 20-13 D Ty 20131208 State of North Carolina Department of Environment and Natural Resources �DbisIon of Water Resources Division of Water Resources 15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) - Buffer Authorization FORM: BA 10 -2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information la. Name of project: Rocky Mount - Wilson Regional Airport (Hangar Access Rd. Rehab and Waterline Ext. Project) 1 b. County: Nash 1c. Nearest municipality: Elm City Id. Subdivision name: NA le. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer if below. ❑ Yes ® No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Owner Information 2a. Name on Recorded Deed: Rocky Mount - Wilson Airport Authority 2b. Deed Book and Page No. DB 825 Page 192 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): PB 23 Pg 152 2d. Responsible Party (for Corporations): Rocky Mount - Wilson Airport Authority (Hans Hess - Airport Manager) 2e. Street address: 7265 Air Terminal Drive 2f. City, state, zip: Elm City, NC 27822 2g. Telephone no.: 252- 291 -0417 2h. Fax no.: 252 - 985 -3728 2i. Email address: rwiairport@aol.com 3. Applicant Information (if different from owner) 3a. Applicant is: ® Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): N 3d. Street address: 3e. City, state, zip: D NR . nyq 3f. Telephone no.: FBramq� 3g. Fax no.: 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: Robert S. Bartlett 4b. Business name (if applicable): Bartlett Engineering and Surveying, P.C. 4c. Street address: 1906 Nash St. 4d. City, state, zip: Wilson, NC 27893 4e. Telephone no.: 252 - 399 -0704 4f. Fax no.: 252 - 399 -0804 4g. Email address: Robert@bartletteng.com FORM: BA 10 -2013 Page 1 of 4 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Parid 011714 PIN 372600788059 1 b. Site coordinates (in decimal degrees): Latitude: 35.855376 Longitude: 77.896154 1c. Property size: 456 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Rocky Mount Reservoir (Tar River Reservoir) 2b. Water Quality Classification of nearest receiving water: 28 -(36) WS- IV,B;NSW,CA 2c. River basin: Tar - Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing airport runways with supporting buildings and drives. 3b. Attach an 8 % x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 3c. Attach an 8 % x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: Approximately 3900 LF 3e. Explain the purpose of the proposed project: Hangar access road rehabilitation and waterline extension. 3f. Describe the overall project in detail, including the type of equipment to be used: Approximately net of 100 SF of asphalt will be saw -cut and removed from the buffer with backhoe (and base). Drive realigned and remaining asphalt resurfaced. Disturbed areas will be re- graded, temporary matting used on slopes and area stabilized and re- seeded. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? ❑ Yes ❑ No ® Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known): Agency/ Consultant Company: Other: 4c. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 6. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown 5b. If yes, explain and detail according to "help file" instructions. Prior buffer authorization for clearing (safety reasons). Location different from current project limits. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. FORM: BA 10 -2013 Page 2 of 4 C. Proposed Impacts Inventory 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stream and outfall pipe not to be impacted. Part of drive (Net of 100 SF) to be removed from buffer (drive realignment) and area re- graded. 1. Buffer Impacts 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? 1a. Project is in which protected basin? ❑ Neuse ® Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1 b. Individually list all buffer impacts below. If any impacts require mitigation, then you MIUST fill out Section D of this form. Buffer impact number — Permanent (P) or Temporary Reason for impact Type of impact (exempt, allowable, allowable w/ mitigation) Stream name Buffer mitigation required? Zone 1 impact (sq ft) Zone 2 impact (sq ft) 61 ❑ P ® T access road/ slope re- stabilization allowable UT to Tar River Reservoir ❑ Yes ® No 2432 3115 B2 ❑ P ❑ T Total buffer mitigation required: ❑ Yes ❑ No ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. B3 ❑ P ❑ T 2f. Comments: No mitigation required. ❑ Yes ❑ No B4 ❑ P ❑ T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No B6 ❑ P ❑ T ❑ Yes ❑ No Total buffer impacts 2432 3115 1c. Comments: Net 100 SF of impervious area to be removed from buffer and access road realigned and re- surfaced. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Stream and outfall pipe not to be impacted. Part of drive (Net of 100 SF) to be removed from buffer (drive realignment) and area re- graded. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Standard erosion control measures to be used including silt fence and excelsior matting on disturbed slopes. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? 1:01 es ® No 2b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Reason for impact Total impact (square feet Multiplier Required mitigation (square feet Zone 1 3 (2 for Catawba) Zone 2 1.5 Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? ❑ Yes ❑ No 2d. If yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. 2f. Comments: No mitigation required. FORM: BA 10 -2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ® Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1 a. If due to site constraints, a BMP other than a level spreader is proposed, please provide a ® Yes ❑ No plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP public (federal /state) land? Manual and attach a BMP Supplement Form. 1 b. F. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the use of ® Yes ❑ No public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ® No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes ® No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after- the -fact permit application? ❑ Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): Applicant/Agent's Printed Name Nan N�� iwpj'- !� Applicant/Agent's Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided.) Send this completed form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service. NC DWR, Transportation Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 - 1650 For all other projects sent by First Class Mail via the US Postal Service Karen Higgins NCDWR — 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 For government transportation projects sent by delivery service (UPS, FedE , etc.): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, etc.): OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10 -2013 Page 4 of 4 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO. PLAN NO. PARCELID: PIN# 372600788059 STREET ADDRESS: Rocky Mount- Wilson Regional Airport 7265 Air Terminal Drive Elm City, NC 27822 Please print: Properly Owner: Rocky Mount- Wilson Airport Authority Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Robert S. Bartlett of Bartlett Engineering and Surveying, P.C. (Contractor / Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, Issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): Telephone: 252-291-0417 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Hans Hess - Airport Manager �o l Authorized Signature Authorized Signature Date: 1 't Date: LOCATION MAP NO SCALE I!� BAWMETT WNffM&WWMPC 1906 Nash Street North Wilson, NC 27893 -1726 Phone: (252) 399 -0704 Fax: (252) 399 -0804 info ®bartletteng.com November 18, 2013 North Carolina Department of Environmental & Natural Resources NC DWR, 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 REFERENCE: BUFFER AUTHORIZATION NARRATIVE Rocky Mount- Wilson Regional Airport 7265 Air Terminal Drive Elm City, NC 27822 - Nash County, NC Proposed Activity: The Rocky Mount- Wilson Regional Airport is located at 7265 Air Terminal Drive off of NC Hwy 97 approximately 2.0 miles east of the intersection of NC Hwy 58 and NC Hwy. 97 in Nash County. The overall acreage of the site is 456 acres. The existing conditions consist of a regional airport facility with a 7,000 ft runway and supporting structures. They wish to re -align and resurface existing drives and extend the waterline service at the site. Part of the existing drive crosses a Tar - Pamlico Buffer Zone that begins at an outfall pipe on the North side of the drive that discharges to an UT to the Tar River Reservoir located approximately 1,700 ft. on the northwest side of NC Hwy 97. The project proposes to resurface the existing drive in the buffer zone area and repair, re- grade, seed, and stabilize the area around the outfall that has experienced some erosion through the years. Net impervious area within the buffer will be reduced by approximately 100SF. If you have any questions or concerns, please do not hesitate to contact this office. Sincerely, Pngine ' g & Surveying L. Meade Environmental Specialist SHEET NUMBER 12 NASH COUNTY, NORTH CAROLINA ;15° 5r WINSTEAD CROSSROADS QUADRANGLE 'k RCES NORTH CAROLINA �o\ 7.5 MINUTE SERIES (TOPOGRAPHIC) CGS SW /4 ROCKY MOUNT 15' QUADRANGLE �P z , 2 s s ROCKY MOUNT 7Ml.J z 77 °52'30° 36 55 37 38 39 2 330 000 -FEET 40 q63 35 °52'30;, 1603 (� �1 f 1745 II ° • B Cem � n li u. Ce a • �.•. • i7/ / �� s Mt Hermo `'' � I Cem na / o 3973 i I .II • /53 76 III ll/ �.� , �- �. 770 00 0 1740 FEET 3972 � X789 • �� ° � �s em o C m ° i c- 603 162 x 1 ° I 39 e � ... C.1� O 11 � • 159 1 - -�� Go 1141 � 1140 4�� ca+O� 5� •�� o �I<' ..._.ice o � \ � 1342 i69 - d i \ 3970 43 y 1742 _ 163 •,, O 1340 � i N 7p- f� o 1327 1 .. 63. 50' t Zion / ° - �...,-- _...�' 1 37 �'\ - �� 3969 170 � 15�. / � �� •'�� O ' 1340. � lams 1150 S` s 1338 � U /60 ( • o m