Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG120006_DMR_20211011
Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG120000 Date submitted October 11, 2021 CERTIFICATE OF COVERAGE NO. NCG12 0 0 0 6 SAMPLE COLLECTION YEAR 2021 FACILITY NAME Energizer Landfill SAMPLE PERIOD ❑ Jan -June X July -Dec COUNTY Randolph or ❑ Monthly' (month) PERSON COLLECTING SAMPLES Brett Higgins - Pyramid Environmental !DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Pace Analytical Lab Cart. it iz RECEIVED ❑Zero -Row ❑Water Supply [_]SA Comments on sample collection or analysis: OCT 26 2021 Mother class c CEI'AMRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE DVVR SECTION Part A: Stormwater Benchmarks and Monitoring Results n No discharge this oeriod2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Chemical Oxygen Demand mg/L a Fecl Coliform Colonies per 100 mL Total Suspended Solids mg/L pH, Standard Units Benchmarks _ - 120 1000 100 or 504 6.0-9.0 Parameter Code - 46529 00340 31616 C0530 00400 Weir 9/21/2021 2.42 70.3 11,800 12.1 6.4 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit text, Table 1, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Conversely, where fecal coliform results exceed the dilution upper limit, report the result as ">XX". Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 11/1/2018-5/31/2021 SWU-248, last revised 11/1/2018 Page 1 of 2 I [ I [ I [ I I I I I I t_ I I I I I I Part 6: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharge this Deriod2 Outfal[ No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, lnches3 Non -Polar Oil & Grease mg/L Total Suspended Solids, mg/L New Motor or Hydraulic Oil Usage, gal/mon Benchmarks _ - 15 100 or 504 — Parameter Code - 46529 00552 C0530 NCOI L Footnotes from Part A also apply to this Part B Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART Il SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ©NO E] IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES ®NO[] REGIONAL OFFICE CONTACT NAME: Mail an original covv of this DMR. includina all "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitorina period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." ?^A A.?. I%AFFI I " Signature of Permittee Date Permit Date: 11/1/2018-5/31/2021 SWU-248, last revised 11/1/2018 Page 2 of 2 a" d.d Alm NCDENR WW Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report No Forguldance on oiling out thisform, please visit httl2://portal.ncdenr.org/weblwqlws/su/npdessw#tab-4 Permit No.: Facility Name. Energizer Landfill at Ran County: Rand Inspector• Date of Inspection: Time of Inspection:I N 11� !�__ or Certificate of Coverage No.: Aph County Landfill Phone No. 336-6724556 WW Total Event Precipitation (inches): �, . L Vq Was this a "Representative Storm Event' or " Measureable Storm Event" as defined by the permit? +w (See i ormation below.) Yes ❑ No No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" ur "meusureable storm event" (requirements vary, depending on the permit). d.► Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, some permits do not have this requirement Please refer to these definitions, if applicable. i A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) In which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours j prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. no By low kmw No ittee or this report is accurate and complete to the best of my knowledge: Pagel of 2 SWU-242. Last modified 10/25/2012 =6 iw imi isw law iMW WW No WW WW 1. Outfall Description: Outfall No. Weir A Structure (pipe, ditch, etc.) V notch Weir Receiving Stream: Intermittent unnamed stream to Deep River Describe the industrial activities that occur within the outfall drainage area: Industrial Landfill 2. Color: Describe the color of thiisch rtsi asi colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3. Odor: Describe any distinct \rr at he scharge may g.tsmells strongly of oil, weak chlorine odor, etc.): 4. Clarity: Choose the number whic best describes the clarity of the discharge, where 1 is clear and 5 is very cloudy: 1 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: 1 2 3 4 5 b. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 Q2 3 4 5 7. Is there any foam in the stormwater discharge? Yes No 8. Is there an oil sheen in the stormwater discharge? Yes No 9. Is there evidence of erosion or deposition at the outfall? Yes No 10. Other Obvious Indicators of Stormwater Pollution: List and describe No other obvious indicatorsgf polly$n _ 1 { Note: Low clarity, high solids, and/orthe presefice ofifoam, oil sheen, or erosion/deposition may be indicative of pollutant exposure. These conditions warrant further investigation. Pagel of 2 Wo SWU-242, Last modified 10/25/2012