HomeMy WebLinkAboutNCC215988_Site Plan or Location Map_20211117CONSTRUCTION SCHEDULE
^�
1.
Obtain all necessary permits and plan approvals. Erosion and Sediment Control
(E&SC) permit and a Certificate of Coverage (COC) must be obtained before any land disturbing activities
occur. A copy of the E&SC permit, the COC and a hard copy of the plan must be kept on site, preferably in a
permits box, and accessible during inspection.
2.
Install gravel construction entrances first, then silt fences, reinforced silt fence outlets and wattles.
O
3.
Finish clearing and grubbing any necessary areas on the lots as they are started.
4T
4.
Begin lot grading and excavation activities
R oP
5.
Begin or continue with house construction activities.
^5 so
6.
Finish all rough grading and house construction.
.11JPG�
7.
Install driveways, walks and patios.
S 9 c'
8.
Begin fine grading of lot areas
301 In 9'Lo
9.
Final grassing, mulching and stabilizing of lot. In most cases this will involve the installation of sod on the lot.
�o y
The silt fence will remain in place until the lot is sodded or grassing is stabilized and takes hold.
o �"S
10.
The contractor shall conduct self -inspections of the erosion and sedimentation control measures and complete
O
the following combined self -inspection form found on the DENIER website
_ SOP c
https:Hfiles.nc.gov/ncdeg/Energy%2oMineral%20and%2OLand%2OResources/Stormwater/NPDES%20
General%20Permits/DEMLR-CSW-Monitoring-Forms-Rev-August-8-2019.pdf. Twelve months of complete
inspection forms shall be kept on site and available for inspection at all times. It is recommended a copy be
Q
kept in a permits box. (GS 113A-54.1 (e), 15A NCAC 0413.0131, NCGOI Part III Sections A and B)
11.
Self -inspections for erosion and sedimentation control measures are to be performed at least once every seven
calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be
made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in
cep
the construction details on this plan. A rain gauge shall be installed at the project site for monitoring.
S�
12.
Inspection and final acceptance letters. When the project is complete, the permittees shall contact DENIER to
Cy
close out the E&SC Plan. After DENIER informs the permittee of the project close out, via inspection report,
the permittee shall visit "deq.nc.gov/NCGO1" to submit an electronic Notice oftermination (e-NOT). A $100
r
annual general permit fee will be charged until the e-NOT has been filled out.
VICINITY MAP
N.T.S.
A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
NCGS 113A-54.1"IS AVAILABLE FOR USE. IT CAN BE COMPLETED BY HAND OR
COMPLETED AS AN EXCEL SPREADSHEET.
AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED
EROSION AND
SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE. RULE 15A
NCAC 04B. 0131 STATES THAT "...DOCUMENTATION SHALL BE ACCOMPLISHED BY
INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE
APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,
PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
CONTROL PLAN."
GROUND STABILIZATION
SITE AREA
STABILIZATION
EXCEPTIONS
DESCRIPTION
TIME FRAME
PERIMETER DIKES,
7 DAYS
NONE
SWALES, DITCHES
& SLOPES
HIGH QUALITY
7 DAYS
NONE
WATER ZONES
(HQW)
SLOPES STEEPER
7 DAYS
IF SLOPES ARE
THAN 3:1
10' OR LESS IN
LENGTH AND ARE
NOT STEEPER
THAN 2:1, 14
DAYS ARE
ALLOWED
SLOPES 3:1 OR
14 DAYS
7 DAYS FOR
FLATTER
SLOPES GREATER
THAN 50' IN
LENGTH
ALL OTHER AREAS
14 DAYS
NONE (EXCEPT
WITH SLOPES
FOR PERIMETERS
FLATTER THAN 4:1
AND HQW ZONES)
DATE: PAGE:
Silt Sock/ Wattle Silt Sock/ Wattle NOTE:
FLOW--.;, 3 FLOW 3" Area to be 1. Other materials providing equivalent protection
Area to be
I I ProI1
tected Protected against erosive velocities may be substituted for
• - ,
use in silt socks or wattles.
12'' Min. 2. Fill silt sock/wattle netting uniformly with compost
2" x 2" 12" Min. 2" x 2" to the desired length such that logs do not deform.
Stakes Stakes 3. Silt sock/Wattle(s) should be installed parallel to
SECTION and a minimum of 10 feet beyond the toe of a
SECTION graded slope. Silt Sock/Wattle(s) located below
flat areas should be located at the edge of the
land disturbance. The ends of the silt
sock/wattle(s) should be turned slightly upslope to
F<O A. Max '�<p Maw prevent runoff from going around the end of the
6 silt sock/wattle(s).
4. Oak or other durable hardwood stakes with a 2
inch x 2 inch cross section should be driven
VJI vertically plumb, through the center of the silt
sock/wattle. Stakes should be placed at a
maximum interval of 4 feet or a maximum interval
Trench in of 8 feet if the silt sock/wattle is placed in a 4 inch
Wood Mulch or Com at ground 4" Min. trench.
5. In the event stakingis not possible ie. when
Tot 2heihtoflo
P (
/ 9 9
socks/wattles are used on pavement) heavy
UNTRENCHED INSTALLATION ENTRENCHED INSTALLATION* P ) Y
°TH IS APPLICATION MAY NOT BE USED- COM POST SOCKS SMALLER THAN 12 concrete IS shall be used behind the silt
sock/wattle to hold it in place during runoff events.
ISOMETRIC VIEW MAINTENANCE:
1. Inspect silt sock/wattle at least weekly and after
each 1 inch or reater rainfall Remove
Mulch or Compost
for Untrenched Socks Area To Be Pr
Sheet Flow -
Silt Sock
Wattle
Work Area
9
accumulated sediment and any debris as
needed to allow for adequate flow.
2. Silt sock/Wattle must be replaced if clogged or
torn.
3. If ponding becomes excessive, the silt
sock/wattle may need to be replaced with a
larger diameter or a different measure.
4. Reinstall if or damaged dislodged.
9 9
5. Silt socks/wattles shall be inspected until land
disturbance is compete and the area above the
measure has been permanently stabilized.
..\NC-Envir SILT SOCK / WATTLE FOR PERIMETER AND INLET PROTECTION
COMPOST SOCK INITIAL FLOW RATES
t Sock
8 Inch
(200
12 Inch
16 Inch
24 Inch
32 Inch
D
Design
Design Diameter
nm)
(300 nm)
(450 nm)
(600 nm)
nm
nm))
Maximum Slope
600 Feet
750 Feet
1,000
1,300
1.650
Length (<2%)
(183 m)
(229 m)
Feet
Feet
Feet
(305 m)
(396 m)
(500 m)
Hydraulic Flow
7.5
11.3
15.D
22.5
30.0
Through Rate
gpm/ft
gpm/ft
gpm/ft
gpm/ft
gpm/ft
(94
(141
(188
(281
(374
I/m/m)
I/m/m)
I/m/m)
I I/m/m)
vnn/m)
DATE:
PAGE:
Filter Fabric
Steel Post Plastic or
8' Max. Standard Strength fabric with wire fence Wire
Backfill trench
6' Max. Extra strength fabric without wire fence Wire Fence
and Compact
thoroughly
Steel Post
•,:.:.; •; • 1 Upslope
Plastic or 18-24
•nAvp
Wire ties
8" Min.
za"
8" down & 4" forward along the tr nch
24"
Filter Fabric
Construction:
CROSS SECTION VIEW
1. Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics.
2. Ensure that the height of the sediment fence does not exceed 24 inches above the ground. (Higher fences may impound volumes of water
sufficient to cause failure of the structure) Maintenance:
3. Construct the filter fabric from a continuous roll out to the length of the barrier to avoid joints. When joints are necessary, securely fasten the 1
Inspect sediment fences at least once a week and after each 1 inch or greater
filter cloth only at a support post with 4 feet minimum overlap to the next post.
rainfall. Make any required repairs immediately.
4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the 2
Should the fabric of a sediment fence collapse, tear, decompose, or become
bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wre or plastic zip ties should have a
minimum 50 pound tensile strength.
ineffective, replace it promptly.
3.
5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Supports should be driven securely into the ground a
Remove sediment deposits as necessary to provide adequate storage volume
minimum ofth inches.
for the next rain and reduce pressure on the fence. Take care to avoid
6. Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the filter fabric directly to posts.
undermining the fence during cleanouts.
4
Wire plastic zip ties should have a minimum of 50 pound tensile strength.
Remove all fencing materials and unstable sediment deposits and bring the
7. Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope from the barrier.
a PP y p g p p p
area to grade and stabilize it after the contributing drainage area has been
8. Place 12 inches of fabric along the bottom and side of the trench.
properly stabilized.
9. Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfll is critical to silt fence performance.
10. Do not attach filter fabric to existing trees.
.ANC -En
SILT FENCE
DATE: PAGE:
4' IS] IN - I ,SILT FENCE
TOP OF SILT FENCE
MUST BE AT LEAST
ABOVE THE TOP OF'
THE WASHED STO
STEEL FENCE P ST
WIRE FEN
HARDWARE CL TH
FRONT VIEW
BURY WIRE FENCE,
FILTER FABRIC,
FILTER OF
WASHED STO
°
AND HARDWARE
STEEL FENCE POPT CLOTH IN TRENCH
SET MAX 2' APAR jl
MIN. 18" INTO SOLID
3' FILTER FABRIC GROUND
4 °8`
c},o og�o
ON GROUND NOTES:
0 "O
a
1. Hardware cloth and ravel should overlay the silt fence at least 12 inches.
9 Y
°Oo�o 0 0
O g 0
2. Stone outlets should be laced on low elevation areas of silt fence and
P
o ° o� FO ��O �
based on field conditions.
MAINTENANCE:
1. Per NCG-01, inspect outlet at lest once a week and after each 1 inch
or greater rainfall event. Complete any required repairs immediately.
BURY WIRE FENCE AND HARDW C
BURY 6" OF UPPER EDGE OF
2. Freshen stone when sediment accumulation exceeds 6 inches.
FILTER FABRIC IN TRENCH 3. Keep mesh free of debris to provide adequate flow.
4. Remove sediment when half of stone outlet is covered.
5. Replace stone as needed to facilitate de -watering.
SECTION VIEW
.. \N C-Envir
SILT FENCE OUTLET
SODDING
LAY SOD IN A STAGGERED
PATTERN. BUTTTHESTRIPS
TIGHTLY AGAINST EACH OTHER.
DO NOT LEAVE SPACES AND DO
r+✓ni NOT OVERLAP. A SHARPENED
MASON'S TROWEL IS A HANDY
TOOL FOR TUCKING DOWN THE
ENDS AND TRIMMING PIECES.
BUTTING -
DS
CANGLED AUSED BY THE A O -
NCORRECT MATIC SOD CUTTER MUST BE
M= MATCHED CORRECTLY.
CORRECT
�A, „ tff r .ttllii� it � � 1 �•il 1! 1Nt ,1} ;'h!
ROLL SOD IMMEDIATELY TO WATER TO A DEPTH OF 4" MOW WHEN THE SOD IS
ACHIEVE FIRM CONTACT AS NEEDED. WATER WELL ESTABLISHED - IN 2-3
WITH THE SOIL AS SOON AS THE SOD IS WEEKS. SET THE MOWER
LAID. HIGH (2`3").
APPEARANCE OF GOOD SOD
SHOOTS -OR GRASS BLADES.
GRASS SHOULD BE GREEN AND
I HEALTH V. MOWED AT A 2'-3'
CUTTING HEIGHT.
THATCH - GRASS CLIPPINGS AND DEAD
LEAVES, UP TO 112'THICK.
ROOT ZONE -SOILAND ROOTS SHOULD BE
iii
112"-3/4' THICK. WITH DENSE ROOT MAT
F OR STRENGTH.
General Erosion Control Notes
1. Only the areas shown shall be disturbed.
2. All disturbed areas shall be grassed and
mulched as soon as possible and maintained
until pemanent cover Is established.
PAGE:
R/R
u
cao
F
EDGE OF CURB Notes:
CU4 INLET 1. If needed, Tree Protection fencing should be installed along the buffer zone, wetland
boundary and/or around protected trees, providing a radius of at least 1.25 feet for each
LEGEND inch of trunk diameter.
2. Install Silt Fence on the low elevation sides of each lot. Install Silt Fence outlets shown on
FLOW DIRECTION schematic/diagram and field adjusted, if necessary, for placement at low points. If lots are
SILT FENCE contiguous and have different land owners or builders, each lot should have individual Silt
Fences.
SILT FENCE OUTLET ® 3. Install required Silt Fence within 10 feet of property line to ensure there is no conflict with
CONSTRUCTION ENTRANCE
septic system. It Is the responsibility of the builder to ensure the Installation of sediment
CURB INLET control measures does not impact the septic system and repair area(s).
4. At least one Construction Entrance/Exit is to be installed per lot.
5. Waste bins and other areas dedicated for managing building material waste shall be at
least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that
no other alternative exists. If this separation cannot be achieved, these areas must be
contained behind Silt Fence.
6. Inlets downstream of disturbances should be protected; streets should be swept when
sediment from the construction activity is present.
..\NC-Environmental.jpeg 7. Details for Silt Fence, Silt Fence Outlets, Construction Entrances and other measures are
-- - provided on additional sheets. Erosion and sediment control details are not drawn to scale.
-------- --- TYPICAL LOT LAYOUT WITH CURB AND GUTTER
/ 6'' N1in.
/
2-3" Course
ea
Ag P
Construction:
Maintenance:
1. Clear the entrance and exit area of all vegetation, roots, and other objectionable
1. Per NCG-01 inspect at least once a week and after each 1 inch or greater rainfall,
material and properly grade it.
make any required repairs immediately.
2. Place the gravel to the specific grade and dimensions shown on the plans, and
2. Maintain the gravel pad in a condition to prevent mud or sediment from leaving the
smooth it.
construction site. This may require periodic topdressing with 2 inch stone.
3. Provide drainage to carry water to a sediment trap or other suitable outlet.
3. Immediately remove all objectionable materials spilled, washed or tracked onto public
4. Use geotextile fabrics in order to improve stability of the foundation in locations
roadways.
subject to seepage or high water table.
VVY
CONSTRUCTION
ENTRANCE / EXIT
r -/
I
7 D GROU COVEftTA
HERE
PIPES HAV EE
196
DRIVEWAY
PIPE IN DITCH
J
C�
R INFORCED
SI T FENCE v
e 1_/ \
WATTLE ��►6�CONSTRUCTION I 1
LIMITS 796
CONSTRUCTS q�z I
ENTRANC �o�zge CONCRETE \ J
WASHC
,TITLE �
O e
O� SILT FENCE
(TYP.)
J ^ � ' p j WATTLE
CONSTRUCTION \e
\ LIMITS _
Gv�
198
�00
STOCKPILE
AREA
d7
PROPOSED GRAVEL \ `-
DRIVE &PARKING 1
96
\ C
a9 OD
a
� I
\ �N 00 / 98
-PRO OSED 50' x 72' �\
METAL FRAME / \-
ST0 AGE BUILDING W
I►J
C
\ vl
i
1gS
\ 796 \ \
I \
\
11
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION
General - All measures will be inspected and corrections made after runoff producing rainfalls, or at least once per week minimum. The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures. If lot construction dictates, measures will be
relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible. Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual. Sodding, seeding and mulching will be maintained to insure proper ground stabilizing cover.
Gravel Construction Entrance - The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all
objectionable materials spilled, washed, or tracked onto public roadways.
Silt Fence - Sediment fences should be inspected at least once a week and after each rainfall event. Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly. Any sediment deposits that build up against the fence should be removed and disposed of properly to insure
that the removed sediment does not wash back against the fence. Adequate storage volume should be provided for behind the fence at tall times. Take care to not undermine the fence during cleanout operations.
Sodding - The sod should be properly maintained to insure that the grass take holds in the areas being secured. The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod. The sod should not be mowed to close, since this could inhibit adequate growth
and stabilization of the root bed. The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
p Yp Yp 9
Grassingand Mulching The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been laced the area should be maintained as needed to insure that all areas aregerminating An bare areas should be
9 9 9 9 p p Y Y p p p 9 9 p 9 9Y
repaired, and reseeded as soon as possible. If the time of year does not permit the establishment of a permanent grass, then a temporary grassing should be used until the growing season permits the use of a permanent grass.
Wattles - Wattles shall be inspected after significant rainfall events. Rills or gullies upslope of the wattle and any undercutting is to be repaired. Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height. Removed
sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water.
Reinforced Silt Fence Outlet - Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet. Take care to avoid undermining the fence during cleanout. Remove and replace stone as necessary as it becomes clogged with sediment. Remove all
fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized.
1 1 �
PAGE 1 of 2
TOTAL DISTURBED ACREAGE: 2.32 ACRES
EROSION CONTROL PLAN
OF
TITAN'S PLUMBING
STORAGE
FOR
ONSITE HOMES
AVERASBORO TWP. HARNETT COUNTY
11
SCALE: 1 = 1001 OCTOBER 2021
C RAPHIC,' SCALE
100 0 50 100 200 400
( IN 17EET )
1 tnch - 100 ft.
MOORMAN, KIZER & REITZEL, INC. 115 BROADFOOT AVE. FAYETTEVILLE, N.C. 28305
PHONE (910) 484-5191 FAX (910) 484-0388 LICENSE #F-0106
LAST SAVED: 10/15/2021 1:32 PM LAST PLOTTED: 10/15/2021 3:47 PM PLOTTED BY: Dennis Gilbert FILENAME: G:ASTAFF\DENNIS\DENNIS BACKUP 6-16-15\PROJECTS\EC NEW PROJECT\TITAN'S PLUMBING PARCEL.DWG