November 16, 2021
DWR # 20210224
Durham County
Terramor Homes
Attn: Jonathan Holtvedt
7208 Falls of Neuse Road
Raleigh, NC 27615
( Delivered via email to: iholtvedt(g7terramorhomes.com )
Subject: REQUEST FOR ADDITIONAL INFORMATION
Westpoint Residential Development
Dear Mr. Holtvedt:
On September 16, 2021, the Division of Water Resources (Division) received your application requesting
a 401 Individual Water Quality Certification and Buffer Authorization from the Division for the subject
project with fee paid on September 17, 2021. The project was placed on public notice on September 27,
2021 and the comment period for the notice ended October 28, 2021. The Division has determined that
your application is incomplete and cannot be processed. The application is on -hold until all of the
following information is received:
1. Your application states that "cofferdams and a pump around will be used" during of the
construction of the road crossing in Impact A. (See Section E: Impact Justification and Mitigation,
1b) However, no temporary stream impacts are requested in Section D of the application. Please
provide more details or an exhibit on the cofferdams and a pump around design and clarify if
there are temporary impacts associated with it. [15A NCAC 02H .0502(c)]
2. Your application states that "Impact A2- Buffer Mitigation for Zone 1 only may be required."
(Section D: Proposed Impact Inventory, 6i). Please clarify how this impact is categorized in the
Table of Uses in 15A NCAC 02B .0714(11). Further please clarify the boundaries of Impact A2 on
the impact maps and provide the width of the permanent maintenance corridor. [15A NCAC 02H
.0502(c) and 15A NCAC 02B .0611(b)(2)]
3. On the impact map for Impact A, the proposed new sewer line turns north to connect with the
existing sewer line to the north of the proposed road crossing. Please provide more details as to
why the tie in was designed this way. It appears additional avoidance and minimization of
NORTH 1:tE
nepertment of Environmental jolek"
CAROLINA
North Carolina Department of Environmental Quality Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707.9000
DocuSign Envelope ID: FCC1B1E6-78CC-4198-809C-7DBE2276DA95
Westpoint
DWR# 20210224
Request for Additional Information
Page 2 of 3
wetland impacts can be achieved by continuing the new sewer line straight to tie into the
existing sewer line. [15A NCAC 02H .0502(c)]
4. On the impact map for Impact B, there is a label for "New Waterline" but no corresponding
water line on the map. Please clarify the label and if a "New Waterline" is being proposed and if
it has any buffer or stream impacts. [15A NCAC 02H .0502(c)]
5. On the Overall Site Plan, Sheet Number CD-2.0, there appears to be an outlet for a proposed
stormwater wetland that goes through the buffer for Stream E on the west side of the project
and another outlet for a proposed stormwater wetland that goes through the buffer for Stream
A on the northeast side of the property. Please provide additional details on these outfalls and
how they meet dispersed flow as defined in 15A NCAC 02H .1002 Further please clarify why
these discharge points are proposed to be armored through the buffer all the way to the stream
banks. [15A NCAC 02B .0714(9)]
6. Please provide a copy of the Stormwater Management Plan for this project. [15A NCAC 02H
.0506(b)(1)]
7. Public Hearing - The Director has determined that it is in the public's interest to hold a public
hearing to received comment and additional information on the proposed project. This hearing
must be held prior to taking final action on your application. The Division is in the process of
scheduling the public hearing and will forward the details by separate letter. [15A NCAC 02H
.0503(f)].
Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested
information for the proper consideration of the application. Please respond in writing within 30
calendar days of receipt of this letter by sending one (1) copy of all of the above requested information
to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by
submitting all of the above requested information through this
link: https://edocs.deq.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on
the link is referenced above).
If all of the requested information is not received within 30 calendar days of receipt of this letter, the
Division will be unable to approve the application and it will be denied as incomplete. The denial of this
project will necessitate reapplication to the Division for approval, including a complete application
package and the appropriate fee.
Please be aware that you have no authorization under the Section 401 of the Clean Water Act or the
Neuse River Buffer Protection Rules for this activity and any work done within waters of the state of the
regulated riparian buffers may be a violation of North Carolina General Statutes and Administrative
Code.
DocuSign Envelope ID: FCC1B1E6-78CC-4198-809C-7DBE2276DA95
Westpoint
DWR# 20210224
Request for Additional Information
Page 3of3
Please contact Colleen Cohn at 919-791-4258 or Colleen.Cohn@ncdenr.gov if you have any questions or
concerns.
Electronic cc:
Camden Brunick, S&EC
April Norton, Raleigh Field Office, USACE
DWR 401 & Buffer Permitting Branch file
Sincerely,
,—DocuSigned by:
-949D91 BA53EF4E0...
Paul Wojoski, Supervisor
401 & Buffer Permitting Branch
Filename: 20210224_Westpoint_Durham_addinfo