November 16, 2021
Duke Energy Progress, LLC
Attn: Keith Douthit, Plant GM
46 Duke Energy Lane
Arden, NC 28704
Subject: Permit Renewal
Application No. NC0000396
Asheville Steam Electric Power Plant
Buncombe County
Dear Applicant:
The Water Quality Permitting Section acknowledges the November 16, 2021 receipt of your permit modification
application and supporting documentation. Your application will be assigned to a permit writer within the Section's NPDES
WW permitting branch. Per G.S. 150B-3 your current permit does not expire until permit decision on the application is
made. Continuation of the current permit is contingent on timely and sufficient application for renewal of the current
permit. The permit writer will contact you if additional information is required to complete your permit renewal. Please
respond in a timely manner to requests for additional information necessary to allow a complete review of the application
and renewal of the permit.
Information regarding the status of your renewal application can be found online using the Department of Environmental
Quality's Environmental Application Tracker at:
https://deq.nc.gov/permits-regulations/permit-guidance/environmental-application-tracker
If you have any additional questions about the permit, please contact the primary reviewer of the application using the
links available within the Application Tracker.
Sincerely
Wren Th dford
Administrative Assistant
Water Quality Permitting Section
ec: WQPS Laserfiche File w/application
North Carolina Department of Environmental Quality I Division of Water Resources
Asheville Regional Office 2090 U.S.Highway 70 I Swannanoa.North Carolina 28778
n';w A^W vd 828.296.4500
�' DUKE Keith Douthit
ENERGY® Plant General Manager
Asheville Combined Cycle Station
PROGRESS
Duke Energy Progress
ASVL PLT 146 Duke Energy Lane
FedEx tracking: 775171340634 Arden,NC28704
o: 828-650-0620
File: 12520B/ENV-30-32 E 828-650-0701
keith.douthit@duke-energy.com
November 10, 2021
Dr. Sergei Chernikov, PhD
North Carolina Department of Environmental Quality
Division of Water Resources RECEIVED
1617 Mail Service Center
Raleigh, NC 27699-1617 N O V 16 2021
NCDEQIDVVRINV[)tS
Subject: Asheville Steam Electric Generating Plant
NPDES Permit NC0000396
Request to modify NPDES permit
Dear Dr. Chernikov:
The Asheville Steam Electric Generating Plant coal units retired in January of 2021 concurrent to the
natural gas combined cycle station completing commissioning. Decommissioning of the retired generation
units are well underway. Excavation of the 1964 ash basin is proceeding wetland is projected to be
completed by the date required by the Mountain Energy Act.
The final basin closure processes will require additions to and physical modifications of outfal1101.
We do not anticipate the chemical characteristics of the typical releases from the modified outfall
101 to be different from the current discharge.
As part of the final excavation and closure of the 1964 ash basin,Duke Energy will be installing
underdrains to collect and direct groundwater within the footprint of the 1964 basin. A conceptual
drawing identifying the location and extent of the underdrain system and its outlet pathway to
outfall 101 is attached to the correspondence.
Further,post-excavation stormwater flows will naturally drain to and be a component of outfall 101.
These stormwater flows will consist of water from the former basin footprint and construction
stormwater during the forthcoming construction project. The facility will be required to`notch"the
1964 ash basin dam such that it will not impound water. Flow volumes will be attenuated as
required by local ordinance.
We are respectfully requesting the description of outfall 101 in our NPDES permit application to be
amended as follows:
"Following excavation of the 1964 ash basin,outfal1101 flows will consist of flows from
existing toe drains, groundwaterremovedvia underdrains installed in the footprint of the 1964
ash basin and storm-water runoff."
Dr.Sergei Chemikov
NCDEQ Division of Water Resources
November 10,2021
Duke Energy requests that the NPDES permit be modified to include this updated description of
outfall 101. A check in the amount of$1,030 is included for the modification fee. Should you
have questions or need additional information please contact Don Safrit at 919-546-6146.
Sincerely,
Keith Douthit
Asheville Plant Manager
Attachments:
A- Flow diagram
B - Conceptual post closure diagram
cc: Landon Davidson, DEQ, Asheville Regional Office - FedEx tracking 775171212080
Teresa Williams, Duke Energy
Cynthia Winston, Duke Energy
Don Safrit, Duke Energy
Shannon Langley, Duke Energy
.Dr.Sergei Chemikov
NCDEQ Division of Water Resources
November 10,2021
Asheville Steam Electric Generating Plant
NPDES Permit NC0000396
Attachment A—Flow Diagram
Post Coal plant shutdown and Ash basin closure Q3.2022 Note: All flow to LRB removed,
French Broad
River Intake LRB removed, post closure
Structure ' stormwater and groundwater to
i >
Outfall 101.
Make-up O Service
Water > Water
v
' Settling N
Zone
I E
Fire Preteotion L-ined
Q X > Retent4en
D Pend
v
n
Power v
V Blesk/Deme K Combined
Lake Industrial Storm and Simple Cycle
Julian Water X Plant
v -_
Water truck dust J EE
c reeciea
V
Oncito GG French Broad
City of Physical/Chemical X Secondary > River
Asheville Settling Basin
Public
S Outfall 001
water Contact SW and A A
Former 1964 Ash tnterc+;+; i water
1 evaporation < Pond X BB FF
Potable
and c i X Segregated clean SW(potentially)
Sanitary
Systems
W V
Dam Seepage French Broad
Public Sewer Post closure stormwater > River Attachment A—Process Flow Diagram
System (MSD) Post closure groundwater Outfall 101 Duke Energy Progress, LLC
Groundwater
men Asheville Steam Electric Plant
Buncombe County October 2021
Combined and Simple Cycle Combustion Turbine Plant
1 2 4 Ultrafiltration 8 10 16 25
Intake Backwash Strainer Service Water/Fire Service Equipment
Lake Structure > >� > and ultrafiltration --� Water Tank > Water Users > Drains Sump >
Julian skids
Existing
17 Outfall
Existing Simple Cycle Existing Simple Cycle Lake002 to
5 > Evap Cooling& i► Stormwater er Drains
Makeup and lift station
Julian
3 38 38
Unit 07/08 Raw\ Standby RO/Demin
> Water Supply > Trailers
9 12
Existing Unit 3 and 4 Simple 13 _ _ 15 V 18
A Simple Cycle _i. Cycle CTG Two-Pass Reverse Mixed-Bed Demineralized CTG NOx
Demineralized Water Water > Osmosis > Demineralizer > Water Tanks —� /
Storage Tanks Injection Injection
6
• • Atmosphere < 14 D
Simple Cycle Evaporation > 20
CTG Water I Atmosphere <
Wash V 22 19
1 >
11 21
Transfer Truck Cooling Tower& > HRSG Blowdown < HRSG
4—
> Basin Tank/Sump
• A V
OF Backwash Sump > tf I 24 I CTG Wash
(Shared) 45 I
23 24 YmY� Water Transfer Truck
Sample
A 37 38 39 Panel 19
44 I ;~ Unit 07/08El
if Cooling Tower -- �✓ Unit 7/8 TB/
43 ♦ yl Blowdown \ ~— WTB drains sump
Sludge Side-stream Filter Side-Stream 001C 4
Thickener(1 per <-- - Filters(1 per
Backwash Sump i
power block) power block) *__ Unit 5/6 TB
46 f (1 per power drain sump
block) 5 25
v 47 Unit 05/06 —Y--
Filter Press Secondary French Broad River
(Shared) _ Cooling
Tower Wastewater Sump > Settling >
001A > (Shared) A 26 Basin Outfall 001
T
ting
Existing Fuel Oil Fuel
) Transfer Truck ( Fuel Oil
Oil-Water Area
Separator Stormwater
Existing Ash pond
LRB I WTS Attachment A—Process Flow Diagram
Duke Energy Progress,LLC
Asheville Steam Electric Plant
Buncombe County. October 2021
Dr.Sergei Chernikov
NCDEQ Division of Water Resources
November 10,2021
Asheville Steam Electric Generating Plant
NPDES Permit NC0000396
Attachment B — Conceptual Post Closure Diagram
Before Asheville Plant After
Water Treatment
Outfall 001 Lined Retention Basin Underdrains
F.
•
•
WASTE BOUNDARY 1 •` 1 . `''` -¢ \`+ WASTE BOUNDARY
M ' sue �„ H w ,f7
° H _
A .` ` { I � b _1y t •
.1 ti,7f
, ik 1 \ i?I
4r �� 4
`.... ;!I ■ �. „�. t,, �:, -' —.. ii
I ,.. 1 -'441 : ,
µ
4 Former
126 t ` r 196d ASH PQND' • ,126 kk
k' : 1954 ASH POND
INS, �n�' r 4 :�'
\ \
,
\ k�
-L',
0004, Outfalt 101 1 i\ 1 Ilk L'''.' ,,="j \ ‘ N
` 0
1964 Dam Toe Drain , 1 l�
., :Awe'
\Niii, 1 AL ),,,,,,41imploP" cr .
4r
•
\ ,
N 1,./..? ‘ , . _,..._
/ IC
Dam Breach Modified Outfall 101 - Post Closure, Pre-CAP
Combined flows of underdrain, surface run-off
And existing Outfall 101 1964 toe drains
•
•
Profile view
Surface water run off
Cross section (existing condition with future pipe shown) Dam
(lowered
with
spillways)
nsta le. after a,cavation
s. ffro mm Y6"'z� d''" .t (to be cove -d)
�, �. , ,����, /
As toI ��� Wet well Toe drains
(prior to closure) NPDES
compliance
Point Outfall 101
Surface ° ater run off . Plan view
•
urface water run off
® underdrain
Final Grade
� Gravel
Gravel ❑ Excavated ash
underdrain underdrain Gravel underdrain
•
Pipe(to be plac•d) Pipe(t. be placed)
Through dam Subsurface water Throug dam
Surface watern off
Wet well
11,
Gravel underdrain to be placed in original channel at elevations
where reformation occurs, pumped by wet well to LRB until Ash Basin Closure. Notched dam Notched dam
Outfall 101