HomeMy WebLinkAbout20201937 Ver 2_BPDP Approval Letter_20211116ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
Director
Restoration Systems, LLC
Attn: George Howard
Attn: Barrett Jenkins
NORTH CAROLINA
Environmental Quality
November 16, 2021
(via electronic mail: bienkinsPrestorationsystems.com )
Re: BPDP Approval
Dear Sirs,
The Division of Water Resources (DWR) received a draft Bank Parcel Development Package
(BPDP) for the Dead Tree Phase A Nutrient Offset Site (Site) in 2021, for review and approval under
the terms and conditions of the Dead Tree Umbrella Nutrient Offset Banking Instrument for Nutrient
Offsets (NOBI) which was received on June 28, 2021. Effective November 10, 2021, the NOBI was
made and entered into by Restoration Systems, LLC (RS) acting as the Bank Sponsor, and the DWR.
DWR reviewed the BPDP document and provided comments and recommendations. DWR received
a revised BPDP that addressed all comments and recommendations. The table below summarizes the
timeline of the BPDP:
Project Site
DWR Project
Initial Draft
Revised Draft Received
Public Notice
Name
ID #
Received
(Final Draft)
Date
Dead Tree Phase
2020-1937v2
June 28, 2021
October 19, 2021
October 26, 2021
A BPDP
The closing date for the public notice was November 10, 2021. DWR received no comments
regarding the subject BPDP documents. This document is now approved and can be found online at
the following link:
Dead Tree Phase A BPDP:
https: [/edocs.deq.nc.gov/WaterResources/DocView.aspx?id=2036678&dbid=0&repo=WaterResources
Please feel free to call me at (919) 500-0683 if you have any questions regarding this
correspondence.
Sincerely,
�DocJu�Siignedby":
y��" ��y,,
A43C72700BD543E...
Katie Merritt
401 & Buffer Permitting Branch
cc: DWR File Copy (Katie Merritt)
North Carolina Department of Environmental Quality j Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617
NORTHCAROUNA
�+ -1-1 m 1 919.707.9000