Loading...
HomeMy WebLinkAbout20201937 Ver 2_BPDP Approval Letter_20211116ROY COOPER Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Restoration Systems, LLC Attn: George Howard Attn: Barrett Jenkins NORTH CAROLINA Environmental Quality November 16, 2021 (via electronic mail: bienkinsPrestorationsystems.com ) Re: BPDP Approval Dear Sirs, The Division of Water Resources (DWR) received a draft Bank Parcel Development Package (BPDP) for the Dead Tree Phase A Nutrient Offset Site (Site) in 2021, for review and approval under the terms and conditions of the Dead Tree Umbrella Nutrient Offset Banking Instrument for Nutrient Offsets (NOBI) which was received on June 28, 2021. Effective November 10, 2021, the NOBI was made and entered into by Restoration Systems, LLC (RS) acting as the Bank Sponsor, and the DWR. DWR reviewed the BPDP document and provided comments and recommendations. DWR received a revised BPDP that addressed all comments and recommendations. The table below summarizes the timeline of the BPDP: Project Site DWR Project Initial Draft Revised Draft Received Public Notice Name ID # Received (Final Draft) Date Dead Tree Phase 2020-1937v2 June 28, 2021 October 19, 2021 October 26, 2021 A BPDP The closing date for the public notice was November 10, 2021. DWR received no comments regarding the subject BPDP documents. This document is now approved and can be found online at the following link: Dead Tree Phase A BPDP: https: [/edocs.deq.nc.gov/WaterResources/DocView.aspx?id=2036678&dbid=0&repo=WaterResources Please feel free to call me at (919) 500-0683 if you have any questions regarding this correspondence. Sincerely, �DocJu�Siignedby": y��" ��y,, A43C72700BD543E... Katie Merritt 401 & Buffer Permitting Branch cc: DWR File Copy (Katie Merritt) North Carolina Department of Environmental Quality j Division of Water Resources 512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTHCAROUNA �+ -1-1 m 1 919.707.9000