Loading...
HomeMy WebLinkAbout20011381 Ver 1_Staff Comments_20010926State of North Carolina Department of Environment P15WAA and Natural Resources Division of Water Quality — Michael F. Easley, Governor NCDENR William G. Ross, Jr., Secretary NORTH CAROLINA DEPARTMENT OF Gregory J. Thorpe, PhD, Acting Director ENVIRONMENT AND NATURAL RESOURCE5 DIVISION OF WATER QUALITY G k September 26, 2001 , C ft� Q .i] vT�i f 4's '- MEMORANDUM TO Larry Coble Winston -Salem Regional Office FROM John Dorn RE 401 Certification Review Please review the enclosed 401 Certification application by the date listed for the project Please call me if you or your staff have any questions, or need assistance in these reviews PLEASE COMPLETE THE NEW STAFF REPORT AND RECOMMENDATION FORM 1 Parker Manufacturing 011381 Forsyth County Central Office Received 09/14/01 Clock Expires 11/13/01 Need WSRO comments by 10/26/01 The other enclosed material (if any) is for your general information and use as appropriate Enclosures -- -- - - - - -- - - - -- - I C R• Eng g, Inc, i taSSIGNED TO K Davis Fennell, PE Phoject Manager OUE 09VE i 151 Poole Road, Suite 100 , Belville, NC 28451 Tel: (910) 383 -1044 ext 113 Fax. (910) 383 -1045 Mobile. (910) 231 -5244 davisfennell @ca pefeareng.com —ca efeareng.com - p 1621 Mail Service Center Raleigh, North Carolina 27699 -1621 Telephone 919 - 733 -1786 FAX # 733 -9959 An Equal Opportunity Affirmative Action Employer 50% recycled/ 10% post consumer paper TRIAGE CHECKLIST Project Name: Project Number. County• i The attached project has been sent to you for review for the following reasons. Please consider whether a site visit is needed to determine the impacts Particular attention should focus on the below checked items. Please feel free to call the central office staff member assigned to your region if you need assistance. Stream length impacted. ! Stream determination (i.e. intermittent or perennial, or any channel present). Wetland impact and distance to blue -hne surface waters on USGS topo map. 1/ Minimization/avoidance options. I NW 14. (is access to lughground or wetlands)? Neuse buffer rules. Pond (water) fill (i.e. is the pond drained or holding water)? I _ Pond creation (i.e. m uplands, in a drained channel, or in wetlands). Please locate streams and channels (if any) so that the central office can determine. Nbumon ratios. _ Stormwater pond placed in wetlands. ! _ Ditching in wetlands. Is the applicant's proposed stream/wetland mitigation site available and viable' Applicant/consultant has a history of non - compliance (check drawings and applicauon for accuracy). Has project been split from previous work to avoid miusac n requirements? Consistent with pre-application meeungs'� — Cumulative impact concerns. OTHER. _ - - r - REC'ElilE N.c c, sic " "f EHNR Triage Check List ; OCT - 4 2001 fo Date vl%1nsio @In To ❑RRO Steve Mitchell Protect Name ❑FRO Ken Aventte DWQ Protect Number 3 ❑WaRO Deborah Sawyer County ❑WiRO Joanne Steenhuis _ ,d2GGSRO Jennifer Frye ❑ARO Mike Parker ❑MRO P e C pVE PATE From Telephone 919 733- ` b The file attached is being forwarded to you for your evaluation Please call if you need assistance [:]Stream length impacted ❑ Stream determination ❑ Wetland determination and distance to blue -line surface waters on USGW topo maps ❑ Minimization /avoidance issues ❑ Buffer Rules (Neuse, Tar- Pamdco, Catawba, Randleman) ❑ Pond fill ❑ Mitigation Ratios ❑ Ditching ❑ Are the stream and or wetland mitigation sites available and viable? ❑ Check drawings for accuracy ❑ Is the application consistent with pre - application meetings? ❑ Cumulative impact concerns Comments �AL- S ' .a