Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2021-04572_Well Construction - GW1_20210429
i WELL CONSTRUCTION RECORD For Imcnial Use ONLY: This form can be used for single or nultiple wells 1.Well Contractor Information: Josh Plemmons 14.WATBRZONO s FROM TO DFSCRWnON Well Contractor Name ft ft. 4 4137 A ft ft p NC Well Contractor CertificationNumber 1S.OUTERCASING formutd-eased veh ORLINER rfa m61e AfATQtG1L Clearwater Well Drilling, Inc. Hot Springs, NC 28743 FROM I TO DIAMETER THICKft- 1,00 fL m Company Name 16. ERCASING"ORTUBIN thetmalclesed=loo )_. - FROM TO DIAMETER THICKNESS MATEBtAL Z.Well Construction Permit#: l R in. List all applicable well permits(i.e.C—%State,4arl- Injection,etc.) _ AL ft. in. 3.Well Use(check well use): .SCREEN Water Supply Well: FROM TO DtA ILTER.. SL01'SIZE I THICKNESS ._MATEtuAL :- R gricuittmal ❑MunicipaUPublic R in. ❑Geothermal(Heating(Cooting Supply) ❑Residential Water Supply(single) ELtO Olndustrial/Commercial ❑Residential Water Supply(shared) 11-GROUT< ; FROM TO MATERIAL EhIPI.A .METHOD&AMOUNr ❑Irrl t10m � � Non-Water Supply Well: R ed ft ❑Monitoring ❑Rewv�t Injection Well: R It. ❑Aquifer Recharge ❑GroundwaterRemediation 19=SANDlGRAVSLPACK ifa ltcable ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACElI EUrfitMOD R ft ❑Aquifer Test ❑StormwaterDrainage ft R OF-xperimentat Technology ❑Subsidence Control ZO:DRILLING LOG attach additionatsheetsif necessary ❑Geothermal(Closed Loop) ❑Tracer EFROMTO DESCRiITION calmhaidaeuautreck shc,etc.❑Geothermal(Heating/CoolingRedun) ❑Other(explainunder#21 Remarks) © & %Y44- fZ4.Date Well(s)Completed: Well ID# '�. ,�1So.Well Location• I w ft ft Facility/Owner Name Facility IM(ifapplieable) R % A Physical Address,city.and Zip a1:REMARKS _ County Parcel Identification No.(PIN) Sb:Latitude and Longitude in degreestminatestseconds or decimal degrees: 22.Certification: T1" �NR$eCt'0 (ifweU field,one lat/long is sufficient) 35a E'�zo N— a: -314 X S' tore of CertiS�Wen Cofactor Date 6.Is(are)the weU(s)- ermanest or ❑Temporary By sig/ting this form,I hereby cerr fy what the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or ISA NCAC'03C.0200 Wdl Construction Standards and dint a 7.Is this a repair to an existing well: ❑Yes or copy ofthis record has been provided to the well owner /f this is a repair,fill our known trell construction information nd explain the nature ofthe repair under�121 remarks section or on the back of thisform 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well &Number of wells constructed: construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction you can submit one form SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: (ft:) 24a. For All Wells: Submit this form within 30 days of completion of well For—triple wells list aB depths ifdiffereni(ammple-3(g00'aml2®100') construction to the following 10.Static water level below top of casing: (ft Division of Water Resources,Information Processing Unit, Ijuarer level is above casing use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter. (ia) 24b.For Infection Wells ONLY: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12.Well construction method: construction to the following (Le.auger rotary.cable,direct push,etc) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: r 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield(gpm) ao Method of test: �? 24c.For Water Supply&Infection Wells: Also submit one copy of this form 1within 30 days of completion of 13b.Disinfection type: Amount: well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environment and Nadaal Resources—Division of Water Resources Revised August 2013 I 1