HomeMy WebLinkAbout20211654 Ver 1_Shoreline Stabilization_20211115 f4 c 0 �� ( i ( J`f
K '.ti��
ROY COOPER y '` I,�l d
..
Governor t
CIE'»�-
MICHAEL S.REGAN * .......
Secretary 4rww�
S.DANIEL SMITH NORTH CAROLINA
Director Environmental Quality State of North Carolina
Department of Environment Quality
Division of Water Resources
It
D Nc 15A NCAC 02H.0500—Water Quality Certification,Shoreline Stabilization
p ,y� fumes FORM: SSGP 09-2020
Shoreline Stabilization Application Form
Three copies of the application (including attachments)and the application fee should be sent to:
If sending via US Postal Service If sending via delivery service (UPS, FedEx, etc.)
Paul Wojoski Paul Wojoski
DWR—401& Buffer Permitting Branch DWR—401& Buffer Permitting Branch
1617 Mail Service Center 512 N. Salisbury Street
Raleigh, NC 27699-1617 Raleigh, NC 27604
NOTE: Before submitting this form, please ensure you have submitted the Pre-Filing Meeting Request
Form as we will not be able to accept your application without this important first step.The Pre-Filing
Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a)which states "At least 30
days prior to submitting a certification request,the project proponent shall request a pre-filing
meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all
certification requests must include documentation that a pre-filing meeting request was submitted to
the certifying authority at least 30 days prior to submitting the certification request. Click here to read
more information on when this form is needed prior to application submission or here to view the
form.
Attach documentation of Pre-Filing Meetingaa Request to this application.
Date of Pre-filing Meeting Request: "1 /A / 01 b, I (required) RECEWED
DWR ID# Version (if applicable)
NOV 1 5 2021
401&BUFF A pESOURCE3
A. Applicant Information [15A NCAC 02H .0502(a)] F ,IR-f,NQ
1. Owner Information Name: iricI_' tk 6 SDWSIa
Mailing Address: Ma. E44 1A Iliddv-Li T rt I
Saitiul. / iqc f a$?7g
Telephone Number: ,Sap a?b--Y74'1 Fax Number:
e
E-mail Address: '9i1),SCv_ S ?II4.10'_ i i,CCM
D --._ North Cm Qua I rc
�J/yl 512 North Salisbury
arolinaDepart Streetent 11617of MailEnvironmental Service Centerlity I RaleighDivision,Northof CarolinaWaterResou 27699es -1617
+af , 919.707.9000
2. Agent/Contact Person Information
A signed and dated copy of the Agent Authorization letter must be attached if the Agent has
signed this application form. (A form can be downloaded here:
http://www.saw.usace.army.mil/Portals/59/dots/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ
ATION FORM.pdf)
Name:
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
B. Project Information [15A NCAC 02H .0502(a) &(b)]
1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with
respect to local landmarks such as towns, rivers, and roads.
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, buildings, retaining wails, docks, impervious surfaces, rip rap, excavation
or dredging below Full Pond/ Normal Water Level elevations, and construction access
corridors. You may use the diagram provided at the end of this application form.
3. Attach a photograph of the shoreline/buffer proposed to be stabilized. (Include a scale of
some sort-a yard stick, shovel handle, etc.)
4. Location of the property(where work is to be conducted)
County: IYk ))0 \ Nearest Town: Nt 6 d6
Lake/river/ocean adjacent to property: 1-4 �ixieS
Property size (acres): I + 09.10 A Subdivision name or site address (include phase/lot number): cL(YISQ -- PDL4 l b* (3
3(aS e1 Tree War , Jtbo) IOC
Directions to site-please include road names and numbers, landmarks, etc.: f v'n ip,(4-
--}ik it tip E fintiWa lECF 4f toz-4-- -�)(x) ;al G turn
Latitude (in decimal degrees) 36,"751 aaa Longitude(decimal degrees) 81 "(4 i '174.
5. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc.): IN dew,le feck
6. Describe proposed work(include discussion as to how hardening of shoreline has been
avoided, or why it is necessary): Mrpy, <'O' d•F Skort_lMi netds =Relit y'vciC. NUJ -fp
e ve ero 5 n ar S�'WY�e �1 Sony- ttfe4S )MAN— et Wad betv] ai .trta-4 t
At vet ve inr Avol ,3S`� shcyc I41I buzve s A�s. .-j 5"-fp(efris4_
5,14141 USL c rt&re inn a4 tatp r rv�k4+ _��"' 1,
of
�0
FORM:SSGP 09 20 ' cif" sG1^C 0 AG'l h vo kc e/ro5 r3� WJ&
rG'��1,N1r(rl.� wk.i �T
.l ®(A LoraA I1er6 4ys ocit_
16, - 6", o 14ittlimis ed, rto(h. R-/-- Ste?
Frat
�01 aykway C cidc iS * '?/90z, $r Tee it/
A ,lL ( 0 � e. C4, You cR,n iNaccS INS ' U
1? At 14 (sue a ) ,
a� � - (tiro
7. Will work be conducted from land? I] From water? [Xj Wjtgft bad hkS
big& “3144tirckue,
8. Total amount of impacts br -- th- - __' , l akeei Normal Water ,vi,i
Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet:
Temporary impacts in square feet:
dirt- eff-pAz vt — us n1 6.4 ik4t.
9. Total amount of impacts above the normal pool lake level/Normal Water Level and 50 feet
land-ward
Permanent impacts (including back fill, excavation, rip rap, retaining walls,etc.) in square feet:
Temporary impacts (temporary clearing, construction corridor) in square feet:
v 'f ��o at ;vi w41\. Lose --sr nt yi'!sy id
ASS wads0
10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50
feet landward to be impacted (number of trees,for instance):
�Ji14LLt ;\\AAizA > + I
Sum 1 raS b2 r � � -der- e,x4ss'
11. Signature C6,pPyox (a.\ Q,i,.t d1drif�; yrf lc, ► � t LeCVUer
J I J J Q&-iivi Gt,
By signing below, I, as the project proponent, certify to the following: wpo-vz -C7 b''—
Ce
• The project proponent hereby certifies that all information contained herein is true, s
accurate, and complete to the best of my knowledge and belief -)-e
• The project proponent hereby requests that the certifying authority review and take action 4 _'
on this CWA 401 certification request within the applicable reasonable period of time
c() gm-am/441a_ l 0 a'L
Owner/Agent's Signature* [15A NCAC 02H .0502(f)] D to
*Agent's signature is valid only if an authorization letter from the owner is provided.
12. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks,etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level
elevation
FORM:SSGP 09-2020 Page 3 of 6
ill ..„
Ai s_jke Jamres
• lot 3 Sunset
Point
. a I
P;
t:—; Big League Camp 9 (22,)
1.5J ,= C
Nebo
',Kai
fr.,? ,
•
is
.A,X
' 1539 {{-
3 1 514 tC,
5,6 ; ,a West Rock9 ��
II-Marion 9
,.
:lgh-School
Dove's Morning
Fresh Market y
m Johnson Camping
F Center-A Camping.. 13
N
's i _ ,R -- '�' Existing path sI- W�'�
�� e' RE. �\ ; , ,, ;�- _ � _ __ propose making it meander(lighter green) s .
'�/ 4� i -- _ ; _ =_T ���,. =, — -�_ ----� so not so steep-no tiLee removal or extra
�. ;: J ,— . J !fir_ �_:._ disturbance,just adct ng mulch
/` ,f / -444 . i ''------ i
' , i/ram _9/' '/ /1i4f—�•— —
(1•3 - ..,
\ :
;1VLL PATH & HANDRAIL-
` -I I/X/'1 1lli
j'--._.__ --_ ` ;'1 } 1,`I I B2r1/1 f;
/"� --1 l ! l (�• W1%III1 ! 1 k
i/ 1 I i I 1I1111 \` ttr - -
- ---" — , -- 1 1 F 1 l L l 1
'.-�' \ 1 1 4 1 1111\\1 t 1 1,1t
' - - . —_.__ 1 \ 1 i 1 V1\
Niz6fy ,.�...__1 I I I 1 1 11\,
, ``a•µ 1 1 I
n'c`^i- 9,offs'
B r �3s,-.4j,���.�I , I I 't ' 1 I I 1,1 1 \•\
ee� .. �� \d<o aay ti� 1 \
��.
`bt
/ • o\. mulch trail to platform/dock area,no added
/ -. disturbance, -ollow natural path
/ 0,
m \
��.
/ 00. ,. �� 4.___L
I �. �'4. Replanting of small native trees and shrubs will allccur in this area when work is done inducing
I o0 a may a� Her. dock(separate perm t file d by
A -< _ °,a�oa 3 ��Og Lake James Outdoors).
ab cry
Ioa^ 36j, iv°4 4jiDN
— ,AIR+ .�l �\
A v S %� �/
1,.
•
Picture showing area of shore where field rock and sand will be added- rock from neighbor's rock for appox. 30',then
sand for approx. 35'to where dog is standing,then field rock for remainder of shore.Trees that are damaged by beaver
will be removed only with county permission:
^• 1'�+�' E ^.y4 l.e..�.L �, fir I '` 2 y..� i
,
re
. _ ...._.*rir 4, , ' 4, . j, .., _ -c ---,,,,, 4
- '1 . A_' 'a`•`".., "'
k w ,,, a'" +i.'. '
v 7,. ` ' • .
4.
r•r .sue .✓ k ' �� Y pi
lv d ,4
ti
** ., -* TO
V'
r,,
A picture showing where field rock will be added:
`,, ,
*.
\. it ".'i c. '-` '
Pr 11 ram, I y . A. -..,. .tlt......-e^�
i 'V
F "
I I I � •
I Ft
7 1
I J �` ey
ri
- . ��:,
t
y, .. A. ..
-,..
to t } 4 �
, -�,
Il
y I '@ i ` '41 1 ♦hr. •
f. V .4 ♦ -mot_
` +F
R 4 `'.
gwsst
,)
Approx.2'most
places,3'in approx.3'
couple of areas 0.
where undercut
approx.3'undercut,
needs to be sculpted
prior to rock being added
hal
water level
Sand t
•� 4'x 50' rock (4'x 30')
rock rock (3'x 50') sculpted+rock
ff (3'x 30') Sand (4'x 30')
/Weeds/small (10'x 35') ~---Weeds/small ----- - —Shrubs,grass,
' brush trimmed 2' brush trimmed 2' etc.left as is
off rock off rock
Future Dock
LOT 13
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
Enr4nnmenrol Quality
Contact Name* Kristina Brosowsky
Contact Email Address* brosowskyk@gmail.com
Project Owner* Kristina and John Brosowsky
Project Name* Brosowsky
Project County* McDowell
Owner Address:* Street Address
392 High Hickory Trail
Address Line 2
aty State/Froeince/Region
Swannanoa NC
Fbstal/Zlp Code Country
28778 usa
Is this a transportation project?* ( Yes (' No
Type(s)of approval sought from the DWR:
r 401 Water Quality Certification- r 401 Water Quality Certification-
Regular Express
r Individual Permit r Modification
P Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes 6, No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information.*
Project is at 365 Big Tree Way,Nebo,NC,28761.It is on Lot 13 at
Sunset Point on Lake James.We want to add 80'field stone starting
at east property line and ending just past where a dock will go to
stabilize shore,and add 35'of sand for a beach area along shoreline
and on shore to prevent soil erosion/washing,then add 30'feet field
stone from sand to west property line abutting up against neighbor's
field stone.Approx 30'of shore on the east side is undercut and
would need to be sculpted prior to stabilization.
By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature*
ittaLuit D ai>t r
Submittal Date 8/21/2021