HomeMy WebLinkAbout310810_Compliance Evaluation Inspection_20211110h Division of Water Resources
Facility Number L c�' I O Division of Soil and Water Conservation
O Other Agency
Type of Visit: (N Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: 0 Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
c
Date of Visit: Arrival Time: Departure Time: County:
Farm Name: 1 0 AJU(iQltc I Q Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Phone:
Title:
Onsite Representative: j I_
Certified Operator: Jaw' s
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feede:
Feeder to Finisl
Farrow to Weai
Farrow to Feed
Farrow to Finis
Gilts
Boars
Other
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current
Design Current
Capacity Pop.
Wet Poultry Capacity Pop.
11-ayer
Non-- Layer
Design Current
Dry Pmdtry Canacitv Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify D WR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
WA
IfVp:3@
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes
4No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
� No
❑ NA
❑ NE
❑ Yes
No
❑ NA
❑ NE
Page I of 3 511212020 Continued
Facilit Number: Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
❑ No
❑ NA
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): LA 5
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
®s No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
3, No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental
threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
® No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
0 No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
V] No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
K1No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
P No
❑ NA
❑ NE
❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals
(Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge
into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
V No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
n No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
[P No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
®No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
�] No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
No
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design []Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysi
❑ Rainfall ❑ Stocking []Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1"
22. Did the facility fail to install and maintain a rain gauge?
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
El Yes � No
s ❑ Waste Transfers
Rainfall Inspections
[—]Yes �3 No
❑ Yes E� No
❑ NA ❑ NE
❑ Weather Code
❑ Sludge Survey
❑ NA ❑ NE
❑ NA ❑ NE
Page 2 of 3
511212020 Continued
Facili Number: Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit?
❑ Yes
[ No
TYn
❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
No
'jam
❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes
[1] No
❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
❑ No
[)IPNA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
K71 No
❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
No
❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
CJ No
❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
T
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
❑ No
❑ NA NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
[ No
❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
No
❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
P No
❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
t�
Reviewer/Inspector Name: tit, i i 'rr" Phone:
Reviewer/Inspector Signature: Date:
Page 3 of 3 511212020