Loading...
HomeMy WebLinkAbout310365_Compliance Evaluation Inspection_20211110(25 Division of Water Resources Facility Number FTJ - FZ(,n O Division of Soil and Water Conservation O Other Agency Type of Visit: 0 Compliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: FrVTOML7 Arrival Time: j() •60t� Departure Time: i,470 n, County: Farm Name: ` I �/ � ICA b W v% Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Onsite Representative: Certified Operator: 39t' ` C ]fkn &n rl t I Back-up Operator: Location of Farm: Swine Wean to I Wean to I Feederto Farrow to Farrow to Other Latitude: �I tLYAn Region:' V go Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -La er Design Current Dry Poultry Capacity Poo. La ers -La ers lets ke s !on ke Puultser Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify D W R) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Page I of 3 loo �dRe Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes IM No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No []Yes LP, ❑ Yes No ❑NA ❑NE ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE ❑NA ❑NE 511212020 Continued Facilit Number: Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [ No a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Structure 1 Structure 2 1 an Structure 3 Structure 4 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) ❑ NA ❑ NE ❑ NA ❑ NE Structure 5 Structure 6 ❑ Yes M No ❑ NA ❑ NE 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes M No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes `7" No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes F] No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes E/,No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. Rb Yes ❑ No ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) [�% PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge F❑r into Bare Soil Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes k] No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes P No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [4 No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes Iallo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ``P' No T ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [� No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes &P No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design [:]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ® No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? [:]Yes EP No ❑ Yes 14No ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑ NA ❑ NE ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: (o r Date of Inspection: 1 l 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ® No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a PDA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ®,No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No Z NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ Yes P No ❑ NA ❑ NE ❑ Yes '� No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA J�JNE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �] No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ® No ❑ NA ❑ NE Reviewer/Inspector Name: a 0A "e f- 2y ar, Phone: Reviewer/Inspector Signature: Date: �Vho/m Page 3 of 3 511212020