Loading...
HomeMy WebLinkAboutNCC203498_Notice of Termination_20211112Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 11/12/2021 11:57:17 AM (NOT Submittal) Approve by Morman, Alaina 11/15/2021 10:32:20 AM (NOT Request Review - NCC203498) • The task was assigned to Morman, Alaina. The due date is: November 17, 2021 5:00 PM 11/12/2021 11:57 AM NORTH CAROLINA Rrf OmFkm&tral Qualrly Certificate of NCC203498 Coverage (COC) No.* Enter the Certificate of Coverage Number 2020 Annual Fee Status 2021 Annual Fee Status PAID May be blank (if not yet billed). Information associated with this permit: Project Name Robin Solar, LLC Address O'Berry Road, Dudley, NC County Wayne Latitude 35.2648 Longitude -78.0769 Permittee Listed Pine Gate Renewables, LLC Legally Responsible Chris Dunbar Individual NC Reference No. NCG01-2020-3498 E&SC Plan ID Wayne-2020-019 Original NOI Tracking 29843 No. Date COC Issued 8/17/2020 Prior Rescission Date Date populates only if COC was already rescinded at time of submittal. Reason for Rescission/Termination Request: Reason for Project Closed -Out Termination of Sale (Another Owner/Operator obtained a new COC) Coverage* Mistake or Invalid Coverage Other Additional More information about the basis of this request, if needed. Explanation Supporting Upload Supporting Documentation if applicable. Documentation Must be PDF format Project Close-out Information: Final Close-out 10/15/2021 Inspection Approval Project Close-out 20211014 sed insp report WAYNE-2020-019 Robin Approval 165.27KB Solar.pdf Documentation Must be PDF format North Carolina General Statute 143-215.613 (1) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Jeff Huntley Title* Vice President, Construction Organization * Pine Gate Renewables, LLC Date * 11 /12/2021 Email for cdorony@blueridgepower.com Confirmation * Contact Telephone* 2486977220 NOT Certification NOT Cert Form - Robin - Signed.pdf Form Must be PDF Format Is this COC Already Ensure this COC has not been rescinded since submittal! Rescinded? Additional Email CC'd on Notification Emails (Optional) Original Permittee CC'd on Notification Emails Email cdunbar@pgrenewables.com Original Site Contact CC'd on Notificaiton Emails Email jhuntley@pgrenewables.com 530.19KB