HomeMy WebLinkAboutStart of Study_Cumb 245 STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J.ERIC BOYETTE
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DIVISION 6
PO BOX 1150
FAYETTEVILLE, NC 28302
Telephone: (910) 364-0600
Fax: (910) 437-2577
Customer Service: 1-877-368-4968
Website: www.ncdot.gov
Location:
558 GILLESPIE STREET
FAYETTEVILLE, NC 28301
MEMO TO: Agencies
FROM: Adam Britt
Bridge Program Engineer
Division 6
DATE: November 12, 2021
Start of Study Letter SUBJECT:
The North Carolina Department of Transportation is starting the project development,
environmental studies, and engineering studies for the replacement of Bridge 240245 in
Cumberland County.
Here is the google link: CUMB 245
County Bridge No. Description PE WBS COORDINATES
Cumberland 240245 Replace Bridge 240245
over Branson Creek on
SR 1414
BP6.R006.1 35.0504, -78.9140
The replacement of this Division 6 bridge is currently scheduled for Let in SFY 2023.
We would appreciate any information you might have that would be helpful in evaluating
potential environmental impacts of the project. If applicable, please identify any permits
or approvals that may be required by your agency. Your comments will be used in the
preparation of the environmental document.
Further, you are cordially invited to the Virtual Field Scoping Meeting TBD at a later
date. A calendar invitation with all virtual connection information will be sent to you as
well. We value your opinion as your comments will enable us to evaluate the impacts of
the proposed project and address your concerns. If you are not able to attend the meeting,
please provide written/email comments back to me by January 12th, 2022.
Your assistance is greatly appreciated. If you have any questions about this project,
please feel free to contact me at (910) 364-0696 or by email at atbritt@ncdot.gov.
Thank you,
Adam
ATB/jrh