Loading...
HomeMy WebLinkAbout20211648 Ver 1_Site Plan_20211112 (2)Contact Name * Contact Email Address* Project Owner* Project Name * Project County* Owner Address:* Is this a transportation project?* Evan Grady eigrady23@gmail.com Evan and Allison Grady Shoreline Stabilization - Lake Tillery Grady Montgomery Street Address 415 Sugar Loaf Rd Address Line City Troy Ibstal 1 Zip Oxte 27371 r Yes r No Type(s) of approval sought from the DWR: F 401 Water Quality Certification - r 401 Water Quality Certification - Regular Express r Individual Permit r Modification W Shoreline Stabilization Does this project have an existing project ID#?* (- Yesr No State I F rovince I region NC country USA Do you know the name of the staff member you would like to request a meeting with? Paul Wojoski Please give a brief project description below and include location information.* Shoreline stabilization permit/approval is being requested for 415 Sugar Loaf Rd Troy, NC - Montgomery County - Lake Tillery. Subdivision - Sugar Loaf Shores off River Rd. (SR1150) Lot 29 revised - PIN #6585 10 26 9216 Lat 35.35650 Lon-80.06374 Rock/Rip Rap will be placed along shoreline in accordance with rules/regulations after grading work is completed along the Lake Tillery Shoreline. Rock will help stabilize erosion along the bank due to "waves" created by boat traffic. A reputable grading contractor, whom has completed numerous shoreline stabilization jobs on Tillery, will be hired to compete the work. NCHWY 24127 West towards Albemarle/Stanly Co., NC R River Rd. L Sugar Loaf Rd. Vacant lot is first gravel drive on L at the intersection of Sugar Loaf Rd. and Sugar Loaf Dr. Evan By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/7/2021