HomeMy WebLinkAbout20211648 Ver 1_Site Plan_20211112 (2)Contact Name *
Contact Email Address*
Project Owner*
Project Name *
Project County*
Owner Address:*
Is this a transportation project?*
Evan Grady
eigrady23@gmail.com
Evan and Allison Grady
Shoreline Stabilization - Lake Tillery Grady
Montgomery
Street Address
415 Sugar Loaf Rd
Address Line
City
Troy
Ibstal 1 Zip Oxte
27371
r Yes r No
Type(s) of approval sought from the DWR:
F 401 Water Quality Certification - r 401 Water Quality Certification -
Regular Express
r Individual Permit r Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
(- Yesr No
State I F rovince I region
NC
country
USA
Do you know the name of the staff member you would like to request a meeting with?
Paul Wojoski
Please give a brief project description below and include location information.*
Shoreline stabilization permit/approval is being requested for 415
Sugar Loaf Rd Troy, NC - Montgomery County - Lake Tillery.
Subdivision - Sugar Loaf Shores off River Rd. (SR1150)
Lot 29 revised - PIN #6585 10 26 9216
Lat 35.35650 Lon-80.06374
Rock/Rip Rap will be placed along shoreline in accordance with
rules/regulations after grading work is completed along the Lake
Tillery Shoreline. Rock will help stabilize erosion along the bank due
to "waves" created by boat traffic. A reputable grading contractor,
whom has completed numerous shoreline stabilization jobs on Tillery,
will be hired to compete the work.
NCHWY 24127 West towards Albemarle/Stanly Co., NC R River Rd. L
Sugar Loaf Rd. Vacant lot is first gravel drive on L at the intersection
of Sugar Loaf Rd. and Sugar Loaf Dr.
Evan
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/7/2021