HomeMy WebLinkAboutNCC205406_NOT Closeout Documents_20211110North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Stonegate, Section Four, Part
County: Cumberland Project: Two - 297-307 River basin: Cape Fear
Person financially responsible: H&H Constructors, Inc. — Project #: CUNME-2021-042
Brian Walker, Division Manager & Agent COC: NCC205406
Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC
1. Project Location: Glencourse Way, Carvers Creek
Pictures: No
2. Weather and soil conditions: sunny, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
10. Comments:
Title:
Date given/sent: November 10, 2021
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or
self -inspections are required. Project is in compliance and released under the SPCA. Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be
requested by the permittee via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded
as part of completing the NOT process.
Reported by: Lori Britt Others present:
Date of inspection: November 09, 2021 Time arriving on site: 1228 pM Time leaving site: 12:35 PM
cc: