Loading...
HomeMy WebLinkAbout20110496 Ver 1_Certification of Completion_20131112NCAWQ Project No.: � � � � � (� A�plicant: 1�1C,[) dT -- piv�Si o County: �(�h�2Y Projecf Name: S� 1 2$ —cE tr, Date of Issuance of 4q1 Watez• Quality Certification: � Ui Yt� !] , 2a j j �� Certi�cate oi Co►x�pletio�� Upon co�npletion oiall wark appro�ed witltin i11e 401 Water Quality Ce�-tification ar applicabie B�iffer Rules, and any subsequent modifications, tl�e a�plicant is rec�ui�•ed to return this certificate to the 4Q1 Transportatian Permittin� Unit, North Carolina Division of WaCe�� Qualiry, 1650 Mai] Seivice Center, Ttaleigll, NC, 27b99-1650. This fo�•m inay be returned to NCDWQ by the applicant, the app[icant's authorized agent, or the project engineer. It is not necessary tn senc[ certificates froin all of tl�ese. �,�pliccurt's Certifrcatiolr I, , hereby state that, to the best of �ny aUilities, due eare and dili�ence was used in the observatian of th� construction such that ihe construction was observed ta be buiit witliin substantial co�nptiance and intent of the 401 Waker Quality Certificatian and Buffer Rules, the approved plans and specifications, and other supporting materials. 5ignature: Date: �Jg=efrt's Certrficrrtioir I, ��es� es� �o�. � , hereUy state tl�at, to the best of �ny abi[ities, due care a�ld di[i�ence was used in the obser�ation af t ie consta�uction such iiiat the constructian was obseE•ved to be built withi�l suE�stai�tial co�nplia��ce and intent oftfae 441 Water Quality Certifcation and Buffer Rules, tlie approved plans and specifiications, and othe�- sup�o�tinb materia[s. Signature: ��i�,��l� (�(/ � Date: II r$�Zd 13 .�. ��rgi�teer's Certifrccrtiarr Partial Fina] 1, , as a ciuly re�iste�•ed P�•ofessional Engineer in the State of NortE� Carolina, having b�ei� authorized to oUserve (periodically, weekly, full ti�ne} tEle construction of the proj�ct,for the Pei�nittee hereby state tEiat, to the best af my abilities, due care and diligence was used in the obs�rvation of the construction sucl� tl�at tl�e coa�struction was observed to 6e liuilt within substantiai compliance and ii�t�nt of the 4�1 Water Qualiry Cez-ti�ication and Buffer Rules, the approved plans and specifications, and other suppartin; materials. Si;nature Itegistrstion No. DaCe