HomeMy WebLinkAboutNCC216223_ESC Approval Submitted_20211112ROYCOOPER
Governor
ELIZABETH BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
November 3, 2021
LETTER OF APPROVAL
Davidson Land Development, LLC
ATTN: James Christopher Reid, Manager
5930 E. Old Highway 64
Lexington, NC 27292
RE: Project Name: Windcrest Acres Subdivision Section 3
Acres Approved: 15.5
Project ID: RANDO-2022-001
County: Randolph
City: Asheboro
Address: Windcrest Road
River Basin: Cape Fear
Stream Classification: C
Submitted By: Summey Engineering Associates, PLLC
Date Received by LQS: October 27, 2021
Plan Type: Revised
Dear Mr. Reid:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval
must be posted at the job site. This plan shall expire three (3) years following the date of
approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC
4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
processed, you will receive the COC via email. As the Financially Responsible Party shown on
the FRO form submitted for this project, you MUST obtain the COC prior to commencement of
any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please
direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
Letter of Approval
Davidson Land Development, LLC
November 3, 2021
Page 2 of 2
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it would be helpful if
you notify this office of the proposed starting date for this project. Your cooperation is
appreciated.
Siinc�ere�ly,, bb
Levi Hiatt
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCG01 Fact Sheet
cc: Summey Engineering Associates, PLLC
ATTN: Christian Vestal
PO Box 968
Asheboro, NC 27204