HomeMy WebLinkAbout20090164 Ver 1_Certification of Completion_20130919REPLY TO
ATTENTION OF
Public Works Division
DEPARTMENT OF THE ARMY
MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND
596"' TRANSPORTATION BRIGADE
MILITARY OCEAN TERMINAL, SUNNY POINT
6280 SUNNY POINT ROAD SE
SOUTHPORT, NORTH CAROLINA 28461 -7800
401 Oversight /Express Permitting Unit
NC Division of Water Quality
1650 Mail Service Center
Raleigh, NC 27699 -1650
11 September 2013
Subject: Certification of Completion (DWQ #09 -0164 and 10 -0573)
Dear Sir or Madam;
Enclosed are Certificates of Completion for the following
two MOTSU projects:
Railroad Reconfiguration ( #09 -0164)
South Rail Holding Area Lightning Protection ( #10 -0573)
Should you have any questions, please contact me at 910-
457 -8425.
Sincerely,
V
Linda G. Rogers
Environmental Manager
Enclosures (2)
SEP I 9 2013
Certification of Completion
DWQ Project No. OR - D 1 6'4 County 3 2ukNs w i c.t G
Applicant 1�i�tiu�Wocti�s�iyiSio� M1ziTg(ZY tpo' ^-
Project Name: MUI-SU IZAtt_R0ACZ) 12tai- oNr= lC%k"Tior-J
Date of Issuance of Wetland Permit. F- 5GrZkA R a L4 . Z 009
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Butter Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send
certificates from all of these
Applicant's Certification
1, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials
Signature
Agent's Certification
Date
I, /11444 r , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials
Signature- Dat e q /`: 2.47/.3
If this project was designed by a Certified Professional
1, , as a duly registered Professional (i e , Engineer,
Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials
Signature Registration No