Loading...
HomeMy WebLinkAbout20090164 Ver 1_Certification of Completion_20130919REPLY TO ATTENTION OF Public Works Division DEPARTMENT OF THE ARMY MILITARY SURFACE DEPLOYMENT AND DISTRIBUTION COMMAND 596"' TRANSPORTATION BRIGADE MILITARY OCEAN TERMINAL, SUNNY POINT 6280 SUNNY POINT ROAD SE SOUTHPORT, NORTH CAROLINA 28461 -7800 401 Oversight /Express Permitting Unit NC Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 -1650 11 September 2013 Subject: Certification of Completion (DWQ #09 -0164 and 10 -0573) Dear Sir or Madam; Enclosed are Certificates of Completion for the following two MOTSU projects: Railroad Reconfiguration ( #09 -0164) South Rail Holding Area Lightning Protection ( #10 -0573) Should you have any questions, please contact me at 910- 457 -8425. Sincerely, V Linda G. Rogers Environmental Manager Enclosures (2) SEP I 9 2013 Certification of Completion DWQ Project No. OR - D 1 6'4 County 3 2ukNs w i c.t G Applicant 1�i�tiu�Wocti�s�iyiSio� M1ziTg(ZY tpo' ^- Project Name: MUI-SU IZAtt_R0ACZ) 12tai- oNr= lC%k"Tior-J Date of Issuance of Wetland Permit. F- 5GrZkA R a L4 . Z 009 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Butter Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to send certificates from all of these Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Agent's Certification Date I, /11444 r , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature- Dat e q /`: 2.47/.3 If this project was designed by a Certified Professional 1, , as a duly registered Professional (i e , Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials Signature Registration No