HomeMy WebLinkAbout20120102 Ver 1_Certification of Completion_20131011A7Li�'a
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Resources
Water Quality Programs
Pat McCrory Thomas A Reeder John E Skvarla, III
Governor Director Secretary
DWR Project No. DWQ# 12 -0102 County Person
Applicant NCDENR — NC Ecosystem Enhancement Program
Project Name. Byrds Creek Mitigation Project
401 Water Quality Certification Issued Date March 11, 2013
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
Webscape Unit, NC DWR, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 This form may be returned
to DWR by the applicant, the applicant's authorized agent, or the project engineer It is not necessary to
send certificates from all of these
Applicant's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials
Signature
Agent's Certification
Date
I, John Hutton of Wlldlands Engineering , hereby state that, to the best of my abilities,
due care and diligence was used in the observation of the construction such that the construction was
observed to be gilithinfuAstantial compliance and intent of the 401 Water Quality Certification and
Buffer Rules, thve s and specifications, and other supporting materials
Signature Date I 0 /
If this project w s designed by a Certified Professional
I, , as a duly registered Professional (I e ,
Engineer, Landscape Architect, Surveyor, etc ) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that,
to the best of my abilities, due care and diligence was used in the observation of the construction such
that the construction was observed to be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting
materials
Signature
401 & Buffer Permitting Unit
1650 Mall Service Center, Raleigh, North Carolina 27699 -1650
Location 512 N Salisbury St Raleigh, North Carolina 27604
Phone 919 -807 -63001 FAX 919 -807 -6494
Internet www ncwaterguality org
An Equal Opportunity 1 Affirmative Action Employer
Date
OCT >i ; 21013
�b