Loading...
HomeMy WebLinkAboutSW4210703_Design Calculations_202111094;1*11M• ' • HYDRAULIC CALCULATIONS 441:� PROJECT: 2020-025 JUNE 2020 O` SEAL 6 �'• FNGINE.�R,••�tr � S R. GL(5 , A tzo JAMESTOWN ENGINEERING GROUP, INC. 117 EAST MAIN STREET P. 0. BOX 365 JAMESTOWN, NC 27282 (336) 886-5523 C - 0626 U- 0000 0 0 O clq (P (q T- 7 0 cl C) w N 0 a U) 0 0 0 N (14 CV) cf) T- CY) C-1) M (P CO C'q N T r 0 0 0) 0 (D U-) cl O q cd cd N C6 C� 1- w N N N Ct) CV) c1r) (Y) 0 0) (D T- Lf) Dr c6 (:i 6 cj vi 00 CO CO CO CO OR OR cq Ul) Ul) Ul) V) Lo U) 0 Lo Ul) U) to In to to to to I 00000000 n n n h h h n h 0 0 0 0 0 0 0 0 CA T- 0 M w cv co (D r- co 06 ci oi ai 0 CN co I- N 0 (D (D O " CR " CP o? M n (o 0 V: n r cl cl nnhhhhnn C� C? 19 ll� -I 0 0' V: cq O (D Iq cn CN N 0 1-- fl- Iq IT v IT 'IT cn m I- 0 1- r- 14, Lo 0 00 O V: llT Uo " 9 � OOOOMCN V) U) ICT v v IT �-NCMCO00nOr0 0 0000aoro OnrOMOclq rMCMrNrrO 0, 0 qr Lo 0 6 1p ll�CD u*) CN r- IT NV o co 4 C.� U-) N co co otowovov,;r to N cl rCO cl to 4 c6 c6 6 Lo N m N w m I, N 14: Cy CV cq CR CO OR OD co CO CC! 0 0 Lo Lo . 0 . Lo Lo Lo to to to to to to to to OOOOOaOO rl! h p"i n n n rl.! t` 0 CD 0 Cp 0 CD C) 0 1- 0 cn to Un 14: CD N r M* 0 IT q to co h o OD M to CN U? � 00 r O 0 0 0 q C` *1 co co CD co cn o? cp Uo U? cl " q V7 CO 00 00 U) (D V cn v m m m co m cn nnnnnnnh IT 19 9 OP o? T CN N CN C4 C4 CN CN N 0 m N 0 v m CD co 9 q 0� T7 OR 0) 00 ( 0 cn m cn cn m co "t cl 1n Lq CO 0 to Cq N C) 0) co Lo U') v v Iq v cn m nnhnnnnh CV q to 9 h o? CP CN N N CN N N N CN SWALE NO. AREA I 10 C Q 10 BOTTOM WIDTH LT SS RT SS LINING SLOPE MATERIAL n DEPTH VEL SHEAR STRESS WP A 1-3 0.90 6.9 0.65 4.1 1.0 3 :1 3 :11 2.5% EXCEL R-1 0.066 0.47 2.17 1 0.73 4.0 1 1.9 1-3 0.90 6.9 0.65 4.1 1.0 3 : 1 3 :11 2.5% VEGETATED 0.035 0.28 3.66 0.43 2.7 1.1 1-6 0.30 6.9 0.65 1.4 1.0 3 :1 3 :11 3.2% EXCEL R-1 0.066 0.18 1.95 0.36 2.1 0.7 1-6 0.30 6.9 0.651 1.4 1.0 3 :1 3 :11 3.2% VEGETATED 0.0351 0.11 3.10 0.22 1.7 0.4 1-7 0.30 6.9 0.65 1.4 1.0 3 :1 3 :11 4.4% EXCEL R-1 0.066 0.16 2.18 0.43 2.0 0.6 1-7 0.30 6.9 0.65 1.4 1.0 3:1 3 :11 4.4% VEGETATED 0.035 0.10 3.50 0.27 1.6 0.4 1-8 0.60 6.9 0.66 2.7 1.0 3 : 1 3 :11 3.5% EXCEL R-1 0.066 0.29 2.33 1 0.63 2.8 1 1.2 1-8 0.60 6.9 0.65 2.7 1.0 3 :1 3 :11 3.6% VEGETATED 0.035 0.18 3.85 0.39 2.1 0.7 1-9 0.40 6.9 0.65 1.8 1.0 3 : 1 3 : 11 2.3% EXCEL R-1 0.066 0.25 1.82 0.36 2.6 1.0 1-9 0.40 6.9 0.651 1.8 1.0 3 :1 3 :11 2.3% VEGETATED 0.0351 0.16 2.98 0.22 2.0 0.6 1-10A 0.68 6.9 0.651 3.1 1.0 3 :1 3 : 11 2.1% IEXCEL R-1 0.066 0.40 1.93 0.52 3.5 1.6 1-10A 0.68 6.9 0.651 3.1 1.0 3 :1 3 :11 2.1% VEGETATED 0.035 0.24 3.24 0.31 2.5 1.0 1-1013 0.67 6.9 0.65 3.0 1.0 3 : 1 3 : 1 2.1% EXCEL R-1 0.066 0.40 1.93 1 0.52 3.5 1.6 1-10B 0.67 6.9 0.65 3.0 1.0 3 :1 3 11 2.1% VEGETATED 0.035 0.24 3.24 0.31 2.5 1.0 2-1 1.11 6.9 0.65 5.0 1.0 3 :1 3 :11 4.1% EXCEL S-2 0.066 0.46 2.77 1.18 3.9 1.8 2-1 1.11 6.9 0.65 5.0 1.0 3 :1 3 :1 4.1% VEGETATED 0.0351 0.28 4.71 0.72 2.8 1.1 2-2 0.55 6.9 0.65 2.5 1.0 3 : 1 3 : 1 4.1% EXCEL R-1 0.066 0.26 2.44 0.65 2.6 1.0 2-2 0.55 1 6.9 0.651 2.5 1.0 3 :1 3 :1 4.1% VEGETATED 0.035 0.16 3.97 0.40 2.0 0.6 2-4 0.30 1 6.9 0.65 1.4 1.0 3 : 1 3 : 1 4.1% EXCEL R-1 0.066 0.16 2.13 0.41 2.0 0.6 2-4 0.30 6.9 0.65 1.4 1.0 3:1 3:1 4.1% VEGETATED 0.035 0.10 3.38 0.26 1.6 0.4 2-5 1.40 6.9 0.65 6.3 1.0 3 : 1 3 : 11 3.0% EXCEL S-2 0.066 0.64 2.49 1.20 5.0 2.6 2-5 1.40 6.9 0.65 6.3 1.0 3 :1 3 :11 3.0% IVEGETATED 0.035 0.37 4.29 0.69 3.3 1.5 2-6 0.20 6.9 0.65 0.9 1.0 3 : 1 3 : 1 2.3% EXCEL R-1 0.066 0.15 1.54 0.21 1.9 1 0.6 2-6 0.20 6.9 0.65 0.9 1.0 3 : 1 3 :1 2.3% VEGETATED 0.035 0.09 2.42 0.13 1.6 0.4 2-7 0.50 6.9 0.65 2.3 1.0 3 : 1 3 : 1 1.5% EXCEL R-1 0.066 0.35 1.59 0.33 3.2 1.4 2-7 0.50 6.9 0.65 2.3 1.0 3 :1 3 :1 1.5% VEGETATED 0.035 0.21 2.64 0.20 2.3 0.8 2-8 0.40 6.9 0.65 1.8 1.0 3 : 1 3 : 1 1.5% EXCEL R-1 0.0661 0.29 1.52 0.27 2.8 1.2 2-8 0.40 6.9 0.65 1.8 1.0 3 : 1 3 :1 1.5% IVEGETATED 0.035 0.18 2.52 0.17 2.1 0.7 2-9A 0.47 1 6.9 0.651 2.1 1.0 3 : 1 3 : 1 2.0% EXCEL R-1 0.066 0.30 1.77 1 0.37 2.9 1 1.2 2-9A 0.47 16.9 0.651 2.1 1.0 3 :1 3 :1 2.0% VEGETATED 0.035 0.18 2.91 0.22 2.1 0.7 2-913 0.50 6.9 0.65 2.3 1.0 3 : 1 3 :1 2.0% EXCEL R-1 0.066 0.32 1.80 0.40 3.0 1.3 2-96 0.50 6.9 0.65 2.3 1.0 3 :1 3 :1 2.0% VEGETATED 0.035 0.19 2.96 0.24 2.2 0.8 COS 1 10.3 6.9 0.63 45.1 6.0 13 :1 3 :1 1.0% EXCEL R-1 0.0661 2.22 2.25 1.39 20.0 20.0 COS 1 10.3 6.9 0.63 45.1 6.0 13 :1 3 :1 1.0% VEGETATED 0.0351 1.37 3.79 0.86 14.6 12.3 COS 2 4.9 6.9 0.65 22.1 6.0 3 :1 3 :11 1.0% EXCEL R-1 0.0661 1.26 1 1.96 0.79 14.0 1 11.3 COS 2 4.9 6.9 0,651 22.1 6.0 3 :1 3 :1 1.0% VEGETATED 0.0351 0.78 1 3.17 0.49 10.9 7.0 A 0.5 6.9 0.65 2.3 1.0 3 : 1 3 : 1 3.7% EXCEL R-1 0.066 0.25 2.30 0.57 2.5 1.0 A 0.5 6.9 0.65 2.3 1.0 3 :1 3 : 1 3.7% VEGETATED 0.035 0.15 3.73 0.35 1.9 0.6 B 0.9 6.9 0.65 4.1 1.0 3 : 1 3: 1 4.2% EXCEL S-2 0.066 0.38 2.70 1.00 3A 1.5 B 0.9 6.9 0.65 4.1 1.0 3 :1 3 :1 4.2% VEGETATED 0.035 0.23 4.51 0.59 2.4 0.9 TYP 0.3 6.9 0.65 1.4 1.0 3 :1 3 : 1 2.0°!o EXCEL R-1 0.066 0.21 1.62 0.26 2.3 0.8 TYP 0.3 6.9 0.65 1.4 1.0 3 :1 3:1 2.0°!o VEGETATED 1 0.0351 0.13 2.61 1 0.16 1.$ 1 0.5 LINER MAX. SHEAR MAX. VELOCITY EXCEL R-1 1.6 PSF 5.5 FPS EXCEL S-2 2.0 PSF 7.0 FPS EXCEL PP5-8 1.5 PSF 6.0 FPS EXCEL PP5-10 2.3 PSF 7.0 FPS EXCEL PP5-12 2.7 PSF 8.0 FPS VEG. VELOCITY 5.5 FPS 7.0 FPS 10 FPS 12 FPS 15 FPS Q C> 00 �T N N 00 V) 6 ci r4 r4 r4 rq r, C� �o r" 10 < CA r.4 z x x 'Mi I I r4 C> I I I 0 04-1 Tr (21 00 (D o 00 V) 00 C) W, r4 m 'o m in cn o 0, 00 eq Ln .v N z x x z cn uj< 4n cnl I I I I I I I IRr I I I I I < CD rq 20 �\� z z uj LU � u C) w 0 j j � lil 41- W ce < < Cd 5 (z z WJ N > " 1:3 0 0- < <Q FA < V) uj n 2 2 w U< LQ 7- Lu w LLI -j ce C) �- o -j z a < P 1 -E3 :5 coy - r U. uj w - -. R 4 5 a �2 � 0 -j 0 w u U- cc > /Jo. i Calculate Skimmer Size Basin Volume in Cubic Feet 20,700 Cu.Ft Skimmer Size 3.0 Inch Days to Drain* 3 Days Orifice Radius 1.3 Inch[es] Orifice Diameter 2.5 Inch[es] 1-in Ne assume 3 days to drain Estimate Volume of Basin Length width Top of water surface in feet Feet VOLUME 0 Cu. Ft. Bottom dimensions in feet Feet Depth In feet Feet 16I Calculate Skimmer Size Basin Volume in Cubic Feet 16,000 Cu.Ft Skimmer Size 2.5 Inch Days to Drain* 3 Days Orifice Radius 1.2 Inch[es] Orifice Diameter 2.3 Inch[es] 'in NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet IFeet VOLUME 0 Cu. Ft. Bottom dimensions in feet I Feet Depth in feet Feet Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: TALLY POINTE Comment: FES 1-11 Solve For Actual Depth Given Input Data: Diameter.......... Slope............. Manning's n....... Discharge......... Computed Results: Depth ............. Velocity.......... Flow Area......... Critical Depth.... Percent Full...... Full Capacity..... QMAX @.99D........ Froude Number..... 2.50 ft 0.0400 ft/ft 0.013 42.00 cfs 1.27 ft 16.81 fps 2.50 sf 2.17 ft 50.70 % 82.03 cfs 88.24 cfs 2.96 (flow is Supercritical) Open Channel Flow Module, Version 2.01 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 �o4c �Js � = 'Z W - 0� �J V ` -3 CA C L DcSS ',, 5 i-D,J � Circular Channel Analysis & Design Solved with Manning's Equation Open Channel - Uniform flow Worksheet Name: TALLY POINTE Comment: FES 2-10 Solve For Actual Depth Given Input Data: Diameter.......... Slope ............. Manning's n....... Discharge......... Computed Results: Depth. ........... Velocity.......... Flow Area......... Critical Depth.... Percent Full...... Full Capacity..... QMAX @.94D........ Froude Number..... 2.00 ft 0.0300 ft/ft 0.013 20.00 cfs 1.01 ft 12.54 fps 1.60 sf 1.61 ft 50.61 % 39.18 cfs 42.15 cfs 2.47 (flow is Supercritical) Open Channel Flow Module, Version 2.01 (c) 1990 Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708 n (, L Ay5 1, 9t"'UJ G Appendices .- NEW YORK DOT DISSiPATOR MI?,THOE) FOR USE IN DEFINED CHANNELS (Source: "Bank and channel lining procedures", New York Department Of Transportadon, Division of Design and Construction, 1971.) Note: To use the following chart you must know: (1) Q full capacity (2) Qto (3) V full (4) Vto where Q = discharge in cfs and V = Velocity in F1'S. ESTIMATION OF STONE SIZE AND DrMENSI:ONS FOR CULVERT APRONS Step 1) Compute now velocity Vo at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do=Ao, where A.= cross sectional area of flow at outlet. For multiple culverts, use Do=1.25xDo of single culvert, Step 3) For apron grades of 10% or steeper, use recommendations For next -higher zone. (Zones 1 through 6). Iq ,0 5 0 Figure 8.06.b.1 e Rev. 12N3 8.06.5 n 8.06,E kISTONE APRON MATERIAL LEND �,F 6 RC]N TO PROTECT CULVERT Li TO PREVENT SCOUR ROLE USE L2 ALWAYS L2 FILLING (FINE) CL. A 3 x Do 4 x Do 2 STONE FILLING (LIGHT) CL, 8 3 x Do 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 4 x Do 6 x Do 4 STONE FILLING (HEAVY) CL. 1 4 x Do 8 x Do 5 STONE FILLING (HEAVY) CL, 2 5 x Do 10 x Do 6 STONE FILLING (HEAVY) CL. 2 6 x )o ^ 10 x Do — 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, t3TILLING BASIN OR LARGER SIZE STONE), Fig. 8.06,b.2 Width = 3 times pipe dia, (min.) DETERMINATION OF STONE SIXES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1) Use figure 8,06,b,3 to determine maximum stone size (e.g, for 12 Fps=20" or 550 lbs, Step 2) Use figure 8,06.b,4 to determine acceptable size range for stone (for 12 FPS it is 125.500 lbs, for 75% of stone, and the maximum " and minimum range in weight should be 25-500 lbs.) Note: In determining channel velocities for stone linings and revettnent, use the following coefficients of roughness: Diameter Mannin's Min, thickness (inches) "n" of bni�n, (inches) Fine 3 0,031 9 12 Light 6 0,035 X2 18 ----Medium 13 0,040 3 8 24 --�Iieavy 23 0.044 30 36 4---- (Channels) (Dissapators) Rev.:2-n