Loading...
HomeMy WebLinkAbout20210692 Ver 1_Site Plan_202111103. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: n±= ha, Nearest Town: Hi czo nj- Lake/ river/ ocean adjacent to property: M Y7/1 Property size (acres): rt 6 % 2cmS - Subdivision name or site address (include phase/lot number): T„I_ .� r - 'rill V) Wtb 5f-l7r QJ E 9Z►21IJG 2O&Dl Directions to site - please include road names and numbers, landmarks, etc.: I�il�lcd d�i��c�-ioF�� i✓x.I�d Latitude (in decimal degrees) 35. SJ9� 27 l L-i• G Z Longitude (decimal degrees) o� 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): -e-J -h Tl Lo1- VA �nc;sFin� o l.f 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary):y j - J .1 7. Will work be conducted from land? ❑ From water? 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent im acts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 316 7 51 V / V?r'-P Pt ImA,,,*- i- i ng,-a u Temporary impacts in square feet: 9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land -ward Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet: Temporary impacts (temporary clearing, construction corridor) in square feet: -} tihn ar i w.f r c { 10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 0 511 S I 11. Signatu Owne A nt's Signature' (15A NCAC 02H .0502(f)) Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 02-2017 Page 2 of 4 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation La ke (At Full Pond/ Normal Water Level) f AltiL Full Pond/ f L ism I Lake (At wnPnnd/N—alWater i-eq Existing Dock /30hxlft 3ftx ISO ft Below full pond/ NWL Full Pond/ Normal Water Level .x� ... s r" l Shoreline Riprap t AI full pond/ NWL I ft. x 150 ff. additional clearing If necessary 4 .ek 3 t Plan View FORM: SSGP 02-2017 Page 3 of 4 NO Ne��sSw�`� 3 Evll pordf NWI� c Lak (At Full Pond/ Norm I Water L s � { Fut1 Pa^b�NWL-- Side View U 2 ft. additional clearing 3 ft. below full pond water level 4 ft. above full pond water level *if necessary 10 ft. bank height ,Side View FORM: SSGP 02-2017 Page 4 of 4