HomeMy WebLinkAbout20211644 Ver 1_Site Plan_20211110 (3)N
� State of North Carolina
Department of Environment and Natural Resources
Division of Water Resources
.- a.
Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
ENVIRONMENTAL QUALITY FORM: SSGP 02-2017
a. Please approximately sketch the following information on this plan and provide
dimensions for All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
La ke
(At Full Pond/ Normal Water Level)
120'
Full Pond/ Normal Water Level 1' Below
5hareline
�7'Above
Plan View
CAM Development — Lot 5- Swift Island- 404 Plantation Way Mt Gilead NC
FORM: SSGP 02-2017 Page 1 of 3
1' Above
La ke
(At Full Pond/ Normal Water Level)
V Below
Side View
13
c
0
CAM Development Lot 5- Swift Island 404 Planation Way Mt. Gilead, NC
Lake
(At Full Pond/ Normal Water Level)
Existing Dock
/ 30Rx7ft
Full Pond/ 11ormal Hater L.vell
—ram r c i-
E AMP E
Plan View
FORM: SSGP 02-2017 Page 2 of 3
Side
L
10 ft. bank
height
View
3 ft. below full pond water level 4 ft. above full pond water level 2 ft. additional clearing
f
Existing bank
necessary
AMPLE
FORM: SSGP 02-2017 Page 3 of 3