FIRST ANNUAL MONITORING REPORT
CARDINAL GAS PIPELINE AT THE
TRIBUTARY TO HAW RIVER
STREAM STABILIZATION AND BUFFER RESTORATION
WAYNICK ROAD
ROCKINGHAM COUNTY, NORTH CAROLINA
SAW-2020-00087
DWR# 20191702
October 2021
American Land Concepts, Inc. (ALC) has completed the annual monitoring for the
Stream Stabilization at the above referenced property. Approximately 245 linear feet of
the tributary to Haw River was stabilized to protect the integrity of the pipeline. In
addition, restoration was completed to mitigate for temporary impacts to the Jordan Lake
Riparian Buffer.
Stream and buffer restoration was completed in late 2020. The stream
stabilization consisted of the construction of grade control structures and bank armoring.
Jordan Lake Riparian Buffer restoration consisted of seeding and tree/shrub plantings.
ALC, inspected the stream stabilization and buffer restoration the Cardinal
Pipelines at the Tributary to Haw River numerous times since the completion of the
stream stabilization. No deterioration was noted during the site inspections. The grade
controlling structures are functioning as designed and the structures are stable. The
riparian buffer restoration plantings are thriving and the planted material have a greater
than 85% survival rate.
238 B MAIN STREET
REISTERSTOWN MARYLAND 21136
PHONE 410/526-2688
FAX 410/526-2970
Photographic Documentation
Waynick Road Stream Stabilization and Buffer Restoration
October 2021
Photo 1: View downstream at photostation 1. Photograph was taken on
September 9, 2021.
Photo 2: View upstream at photostation 2. Photograph was taken on
September 9, 2021.
Photographic Documentation
Waynick Road Stream Stabilization and Buffer Restoration
October 2021
Photo 3: View of drop structures from photostation 3. Drop structures are
stable and no deterioration was evident during site visits. Photograph was
taken on September 9, 2021.
Photo 4: View of buffer restoration from photostation 3. Photograph
was taken on September 9, 2021.
Photographic Documentation
Waynick Road Stream Stabilization and Buffer Restoration
October 2021
Photo 5: View of buffer restoration looking south at photostation 4.
Photograph was taken on September 9, 2021.
Photo 6: View of buffer restoration looking north at photostation 4.
Photograph was taken on September 9, 2021.
Photographic Documentation
Waynick Road Stream Stabilization and Buffer Restoration
October 2021
Photo 7: View of drop structures looking upstream at photostation 5.
Photograph was taken on September 9, 2021.
■■I . 1■ ■■I.O■ ■
NMI/"�■ ■■ ■■■■■
■� I� 1■ ■ 11010■■■ 238 B MAIN STREET
■I I■■, ■ ■■,■■■■
PHONE: (410)-526-2688
north
Scale 1"=50'
i / IIII I ROW
'b \ \ \ \\ \\ \\ \\
\`\ i
/ I I I I I 1 j IIII I I I1 / ,'fit% \ \\
X.',
I (IIII 11111\, \1 \� \\ 1\ \,r,r ,',\ \,'.
�/ I I III 1 ► I I \ \ \\ \ \ �,,� '�..�\
�`++ \ \ �f \ \ 1 ` '
.�*. \�.
•� �.
Riparian 6u4r
Outside of ROW"
\ \ \ \ \ \ \\\\
Waynick Road Areas temporarily and
Stream and Riparian Buffer Monitoring permanently seeded
post construction
Exhibit
Area planted with
woody vegetation post
Cardinal Gas Pipeline construction
at the Tributary to Haw River
SAW-2020-00087
DWR# 20191702
Prepared For.
Rockingham County, North Carolina Cardinal Operating Company. LLC
4300 NC 11WY 65
October 2021 Reidsville, North Carolina 27320