Loading...
HomeMy WebLinkAbout20191702 Ver 1_Monitoring Report_20211108PROVIDING ENVIRONMENTAL SERVICES TO LANDOWNERS, DEVELOPERS AND INDUSTRY N r nvir::17r ,._I-,t .�f 0uEi1il:�� :r q €� 2'�2 i FIRST ANNUAL MONITORING REPORT CARDINAL GAS PIPELINE AT THE TRIBUTARY TO HAW RIVER STREAM STABILIZATION AND BUFFER RESTORATION WAYNICK ROAD ROCKINGHAM COUNTY, NORTH CAROLINA SAW-2020-00087 DWR# 20191702 October 2021 American Land Concepts, Inc. (ALC) has completed the annual monitoring for the Stream Stabilization at the above referenced property. Approximately 245 linear feet of the tributary to Haw River was stabilized to protect the integrity of the pipeline. In addition, restoration was completed to mitigate for temporary impacts to the Jordan Lake Riparian Buffer. Stream and buffer restoration was completed in late 2020. The stream stabilization consisted of the construction of grade control structures and bank armoring. Jordan Lake Riparian Buffer restoration consisted of seeding and tree/shrub plantings. ALC, inspected the stream stabilization and buffer restoration the Cardinal Pipelines at the Tributary to Haw River numerous times since the completion of the stream stabilization. No deterioration was noted during the site inspections. The grade controlling structures are functioning as designed and the structures are stable. The riparian buffer restoration plantings are thriving and the planted material have a greater than 85% survival rate. 238 B MAIN STREET REISTERSTOWN MARYLAND 21136 PHONE 410/526-2688 FAX 410/526-2970 Photographic Documentation Waynick Road Stream Stabilization and Buffer Restoration October 2021 Photo 1: View downstream at photostation 1. Photograph was taken on September 9, 2021. Photo 2: View upstream at photostation 2. Photograph was taken on September 9, 2021. Photographic Documentation Waynick Road Stream Stabilization and Buffer Restoration October 2021 Photo 3: View of drop structures from photostation 3. Drop structures are stable and no deterioration was evident during site visits. Photograph was taken on September 9, 2021. Photo 4: View of buffer restoration from photostation 3. Photograph was taken on September 9, 2021. Photographic Documentation Waynick Road Stream Stabilization and Buffer Restoration October 2021 Photo 5: View of buffer restoration looking south at photostation 4. Photograph was taken on September 9, 2021. Photo 6: View of buffer restoration looking north at photostation 4. Photograph was taken on September 9, 2021. Photographic Documentation Waynick Road Stream Stabilization and Buffer Restoration October 2021 Photo 7: View of drop structures looking upstream at photostation 5. Photograph was taken on September 9, 2021. ■■I . 1■ ■■I.O■ ■ NMI/"�■ ■■ ■■■■■ ■� I� 1■ ■ 11010■■■ 238 B MAIN STREET ■I I■■, ■ ■■,■■■■ PHONE: (410)-526-2688 north Scale 1"=50' i / IIII I ROW 'b \ \ \ \\ \\ \\ \\ \`\ i / I I I I I 1 j IIII I I I1 / ,'fit% \ \\ X.', I (IIII 11111\, \1 \� \\ 1\ \,r,r ,',\ \,'. �/ I I III 1 ► I I \ \ \\ \ \ �,,� '�..�\ �`++ \ \ �f \ \ 1 ` ' .�*. \�. •� �. Riparian 6u4r Outside of ROW" \ \ \ \ \ \ \\\\ Waynick Road Areas temporarily and Stream and Riparian Buffer Monitoring permanently seeded post construction Exhibit Area planted with woody vegetation post Cardinal Gas Pipeline construction at the Tributary to Haw River SAW-2020-00087 DWR# 20191702 Prepared For. Rockingham County, North Carolina Cardinal Operating Company. LLC 4300 NC 11WY 65 October 2021 Reidsville, North Carolina 27320