Loading...
HomeMy WebLinkAbout20080213 Ver 2_Stormwater Info_2013110708 -04-1 3 V 2 BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS 6310 CHAPEL HILL ROAD, SUITE 250, RALEIGH, NC 27607 919/851 -4422 ■ FAX 919/851 -8968 BNK@BNKinc.com STORMWATER CALCULATIONS POWERHOUSE CHURCH OF JESUS CHRIST 3411 PINE KNOLL DRIVE RALEIGH, NORTH CAROLINA 029993 �4 PREPARED BY DANNY L. HOWELL, JR., PE BASS, NIXON & KENNEDY, INC. AUGUST 26, 2013 REVISED: SEPTEMBER 25, 2013 NOV - 7 2C;3 r 10 Year Design Storm Inlet No. Up Inlet No. U Inlet No. Dn Drainage Area ac Total Area ac Runoff Coeff iSys inmr Total Flow cfs Rim U Invert U Invert Dn Pipe Len ft Pipe Dia in Material Pipe Slo f/. BMP Outlet 2 FES 1 4.69 4.69 0.69 7.24 23.42 248.00 239.40 239.00 75.84 12 RCP 0.53 C14 EW 3 0.19 3.49 0.80 6.08 17.15 265.62 252.00 248.50 39.52 24 RCP 8.86 CI5 C14 0.25 0.79 0.80 6.98 4.60 264.40 260.10 259.10 134.00 15 RCP 0.75 C16 C15 0.54 0.54 0.85 7.24 3.32 267.00 263.10 260.20 150.25 15 RCP 1.93 C17 C14 0.29 2.51 0.80 6.23 12.51 267.50 257.90 256.60 183.70 24 RCP 0.71 CI8 C17 0.58 1.09 0.80 6.79 5.92 267.50 260.20 258.00 24.00 18 RCP 9.17 MH /JB 9 C18 0.00 0.39 0.80 7.12 2.22 267.25 261.30 260.70 75.61 15 RCP 0.79 Cl 10 MH /JB 9 0.39 0.39 0.80 7.24 2.26 265.80 261.80 261.40 45.55 15 RCP 0.88 Cl 11 CI8 0.12 0.12 0.80 7.24 0.69 268.70 265.20 264.00 56.54 15 RCP 2.12 Cl 12 C17 0.23 1.13 0.80 6.33 5.72 268.80 258.70 258.00 95.50 18 RCP 0.73 Cl 13 Cl 12 0.15 0.90 0.80 6.35 4.57 269.00 259.00 258.80 19.54 15 RCP 1.02 C114 Cl 13 0.20 0.75 0.80 6.52 3.91 267.35 260.40 259.10 152.33 15 RCP 0.85 Cl 15 Cl 14 0.17 0.17 0.80 7.24 0.98 267.35 263.90 263.60 40.00 15 RCP 0.75 Cl 16 C114 0.28 0.38 0.80 6.85 2.08 265.43 261.60 260.50 144.49 15 RCP 0.76 Cl 17 Cl 16 0.10 0.10 0.80 7.24 0.58 265.43 262.00 261.70 40.00 15 RCP 0.75 EW 19 EW 18 13.83 13.83 0.65 7.24 65.07 254.00 248.00 244.86 114.73 48 RCP 2.74 MH/JB 21 FES 20 0.20 0.20 0.80 7.24 1.16 264.75 257.20 256.00 32.23 15 RCP 3.72 10 -Year Hydraulic Grade Line Information Inlet No. Up Inlet No. Dn HGL U ft HGL Dn ft Vel Dn BMP Outlet 2 FES 1 241.12 240.62 6.96 C14 EW 3 253.47 249.97 6.93 C15 CI4 260.97 259.96 5.12 CI6 C15 263.83 261.56 2.71 CI7 C14 259.15 257.85 6.04 CI8 C17 261.13 259.15 4.06 MH/JB 9 C18 261.90 261.30 3.84 Cl 10 MH/JB 9 262.40 262.00 3.87 Cl 11 CI8 265.53 264.33 2.64 Cl 12 CI7 259.61 259.15 3.93 Cl 13 Cl 12 259.86 259.66 5.11 Cl 14 Cl 13 261.19 259.89 4.77 Cl 15 Cl 14 264.30 264.00 2.94 Cl 16 Cl 14 262.18 261.19 2.99 Cl 17 Cl 16 262.30 262.18 1.34 EW 19 EW 18 250.39 247.25 8.31 MH/JB 21 FES 20 257.63 256.43 3.09 Powerhouse Church of Jesus Christ STORM SCHEDULE 9/24/2013 Structure d, ft Velocity Length ft Width ft Depth in I Type d5o FES 1 1.00 7.0 6 3 22 1 Class'B' EW 18 4.00 8.3 24 12 22 Class'B' 6" -13" FES 21 1.25 3.1 5 4 9 Class'A' 3" - 6' Powerhouse Church of Jesus Christ Rip -Rap Aprons 9/2411013 Line Profile (Line 1) - 4 -3 288.00 263 vl0 25 5.D0 2.00 248.00 243.10 0 Line 1 -4,3 Bev Cft) 5 10 15 20 25 30 35 40 2s8.0n 263.00 258M Z.s�3.M 248.DO 243.0 45 50 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfS) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) MIS) WS) (ft) (ft) 1 17.15 248.50 252.00 1.47 1.47 1.47 249.97 253.47j 253.47 6.93 6.95 4.50 11.62 Project File: No. Lines: 17 Run Date: 8/23/2013 Swrm sew= Line Profile (Line 13) - 5-4 Page 1 of I Storm Sewers F4- , It 'III -IF3 NINE m son Invert Bevation 7 Depth of Flow Hydraulic Grade Line MMMEM, mom MOMOMMOMMOMMMM Jim, mg 0 0 RunDate: M12013 1 Storm Sewers Line Profile (Line 14) - 6-5 Page I of 1 A-1 I 'Bi mW NO �NJe man EPWFll —m� I N Invert Elevation Depth of Flow Hydraulic Grade Line mmmmmmmm I ProjectFile: RunDate: 8/23/2013 SWrrn Sewers Line Profile (Line 11) - 9 -8 Page, of 1 11 C BEIM WEN Invert Elevation Depth of Flow Hydraulic Grade Une ./ 1 1 1 .1 1 .1 1 .1 1 •1 •1 mm Project File: No. Unes: 17 I Run Date: 8/23/2013 Line Profile (Line 12) -10 -9 Page 1 of 1 Line 12 - M Elev (ft) 208.40 268.00 206.00 M.00 264.00 264.00 2 -00 264.00 202.00 280.00 1 1 -- Lin - - -- - 208.00 258.00 0 5 10 15 20 25 30 35 40 45 50 55 00 Reach (ft) Line # Q (cfs) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn MIS) Up ON Dn (ft) Up (ft) 12 2.26 261.40 261.80 0.60 0.60 0.60 262.00 262.40 262.40 3.87 3.87 4.15 2.75 Project File: No. Lines: 17 Run Date: 8/23/2013 Storm sewers i L Line Profile (Line 4) -11 -8 Page 1 of 1 1 OEM_ :, Up gill •w 1. rr rr - �� r rr r r r r � 'r r � •r ■.� r Invert - 1 • Depth of • w Hydraulic Grade Line - • • - 1 .• � 11 1 I 1 1 .• Run Date: 8/2-3/2013 Stmm Sewers Line Profile (Line 3) - 8 -7 Page 1 of 1 11 IM I in 1 f 1 ! Invert Elevation Depth of Flow Hydraulic Grade Une mom MMOMMMOMMMOMMM Line Profile (Line 2) - 7-,4 Page 1 of 1 FEE===�ir_ii �CC�EECCCCIC�B BpBT� ®�. 8 =•..C..rC�.��IC��.. m ��•�����������r���a��■��i����sa C C CCC C CC CC C B CCC C� CB Mr II I r �1 1 .1 :1 •1 /r 1 Invert Elevation i Depth of Flow Hydraulic Grade Line . ./ •1 • I- I 1 • 11 Project File: WRO-17-716 Run Date: 8/2312013 Swim Sewers Line Profile (Line 5) -12 -7 Page 1 of 1 Swim Sew= _n�'= memo _ mom r r r r Y r r J .r •J r :r •J •r fit r Invert Elevation Depth of Flow Hydraulic Grade Line mmmm MOMMOM MWOMMOOMMOMMOM • • Lines: 1 Swim Sew= Line Profile (Line 6) -13 -12 Page 1 of 1 Line 6 - 13-12 Bev (ft) 274.00 — 274.00 270.00 266.00 270.x0 266.00 262.00 262.00 RTM 258.00 .p0 Line .7 _ - - - -- -- — -- 254.00 254.00 0 5 10 15 20 25 30 Reach (ft) Line # Q (cfs) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 6 4.57 258.80 259.00 0.86 0.86 0.86 259.66 259.86 259.86 5.11 5.11 8.75 8.75 File: 7No. --TProject Lines: 17 Run Date: 8/23/2013 Storm sewers Line Profile (Line 7) -14 -13 Page 1 of 1 Storm Sewers NUNN�mm� m sit ffm =�1WMm-JFmm FM ME MEE Invert - ation Depth of • Hydraulic _.- Line - • - No. Unes: 17 Run Date: 8/23/2013 Storm Sewers Line Profile (Line 8) -15 -14 Page 1 of 1 Stem Sewers X F FIffilIll LINE; �A ,kt li M F - f Invert Elevation Depth of Flow Hydraulic Grade Une 1. 1 • 1 I� 1 1 1 I� 1 X 1 1 1 1 / I ' • - - • - ® I Stem Sewers Line Profile (Line 9) -16 -14 Page 1 of 1 Storm Sewers , F i pit Nilson M MINIM _r.���M r ■ _ mom M M_ Invert Elevation Depth of Flow Hydraulic Grade Une 1: .1 I .I � .• � 1 .1 Storm Sewers Line Profile (Line 10) -17 -16 Page 1 of 1 Line 10 -17 -16 Bev (ft) 268.00 268.DD rZ— —_ 266.00 266.00 264.00 2614.00 262.00 260.00 252-00 260.00 258.00 258.D0 0 5 10 15 20 25 30 35 40 45 50 Reach (ft) Line # Q (cfs) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn fts) Up (ft/s) Dn (ft) Up (ft) 10 0.58 261.70 262.00 0.48 0.30 0.30 262.18 262.30 j 262.30 1.34 2.50 2.48 2.18 Project File: No. Lines: 17 Run Date: 8/23/2013 Stmm Sewers Line Profile (Line 16) -19 -18 Page I of I Stum sewers Line 16 -19-18 ev (ft) 255.00 255.00 252-00 249.00 249.D0 246.00 246.00 243.00 243.D0 240.00 240.00 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) MIS) (ft1s) (ft) (ft) 16 65.07 244.86 248.00 2.39 2.39 2.39 247.25 250.39 250.39 8.31 8.32 1.14 2.00 Project File: I No. Lines: 17 Run Date: 8/23/2013 Stum sewers Line Profile (Line 15) - 21 -20 Page 1 of 1 Lithe 15 -21-20 Fjev (ft) 269.00 269-00 255.00 ___ _ _ _ 265.00 _ _ _ _ — - - -- — - — 261.00 - -- _ 261.00 257.00 257.00 _ 253.00 253.00 - - 249.00 ^ — 249.00 0 5 10 15 20 25 30 35 40 45 Reach (t) Line # Q (cfS) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/S) Up (ft1s) Dn (ft) Up (ft) 15 1.16 256.00 257.20 0.43 0.43 0.43 256.43 257.63 257.63 3.09 3.09 0.20 6.30 Project File: No. Lines: 17 Run Date: 8/23/2013 St= sew= Culvert Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. 100 -Year - Pine Knoll Drive Culvert Invert Elev Dn (ft) = 244.86 Calculations Pipe Length (ft) = 114.73 Qmin (cfs) Slope ( %) = 2.74 Qmax (cfs) Invert Elev Up (ft) = 248.00 Tailwater Elev (ft) Rise (in) = 48.0 Shape = Cir Highlighted Span (in) = 48.0 Qtotal (cfs) No. Barrels, = 1 Qpipe (cfs) n -Value = 0.012 Qovertop (cfs) Inlet Edge = Projecting Veloc Dn (ft/s) Coeff. K,M,c,Y,k = 0.0045, 2, 0.0317, 0.69, 0.5 Veloc Up (ft/s) HGL Dn (ft) Embankment HGL Up (ft) Top Elevation (ft) = 265.50 Hw Elev (ft) Top Width (ft) = 60.00 Hw /D (ft) Crest Width (ft) = 230.00 Flow Regime sew (e) 100.Yew -Pine Moll Ddve Culvert Tuesday, Sep 24 2013 = 87.74 = 87.74 = (dc +D) /2 = 87.74 = 87.74 = 0.00 = 7.66 = 9.16 = 248.29 = 250.85 -62.37 = 1.09 = Inlet Control Hr Depth (n) 2060 cif Given HGL Embank 1600 120 Boo 4.00 0.00 4.00 - .600 160 Reach W ie�iee ■vioiii cif Given HGL Embank 1600 120 Boo 4.00 0.00 4.00 - .600 160 Reach W NITROGEN EXPORT powavhouon Church off Jasmo ChAvtr Revised: September 25, 2013 Nitrogen Apportioning Calculations Powerhouse Church of Jesus Christ Total Site: (incl. R/W to Existing BOC /EOP) Existing Impervious Surface: Existing Open Space: New Impervious: (incl. new road widening in R/W) Proposed Impervious Surface: Proposed Undisturbed Open Space: Proposed Managed Open Space: 6.50 ac (6.06 ac On -Site + 0.43 ac R1W) 0.26 ac 6.24 ac 2.48 ac (2.3 ac On -Site + 0.43 so RAN) 2.74 ac 0.00 ac 3.76 ac (1) (2) (3) (4) (5) Type of Land Cover site TN Export TN Export TN Export Area Coeff. by Land Use From Site Acres Ibslac r Ibs r Ibelac r Apportioned permanently preserved undisturbed open s ace (forest, unmown meadow 0.00 0.6 0.00 Apportioned permanently preserved managed open s ace rasa landscaping, etc.) 3.40 1.2 4.08 Impervious surfaces (roads, parking lots, driveways, roofs paved store a areas etc. 2.48 21.2 52.53 Total Associated with New Development 5.88 56.62 Average for Site 9.63 Upper Limit for Buydown: Lower Limit for Buydown: 10.00 Ibs/ac/yr 3.60 Ibs /actyr Treatment and buydown required based on Total TN Export (above) Treatment Provided Through Wet Detention Basin: 14.95 Ibs/yr (59.82 lbstyr • 25 %) TN Export After Treatment (if treatment proposed): 41.66 Ibs/yr (56.62 Ibstyr -14.95 Ibs/yr) OR: 7.08 Ibs /ac/yr (41.66 Ibs/yr / 5.88 ac) TN Offset by Buydown: 3.48 Ibs/ac/yr (7.08 Ibs/aclyr - 3.6 Ibs/ac/yr) Area Associated with New Development: 5.88 ac (0 ac + 3.4 ac + 2.48 ac) NCEEP Payment: Private Institution Payment: $ 17,423.80 @ $28.3511b " 30 yr' 3.48 Ibs/ac/yr (7.08 Ibs/ac/yr - 3.6 lbs /ac/yr) • 5.88 ac $ 6,148.98 @ $10.00/Ib • 30 yr' 3.48 Ibs/ac/yr (7.08 Ibs /ac/yr - 3.6 Ibs/ac/yr)' 5.88 ac TREATMENT REQUIRED TO LOWER NITROGEN EXPORT Treatment Method: Wet Detention Basin Removal of Treatment: 25% TVPF nF 1 eunnnvon nRAIwrOP Tn TOCATMCUT. (1) (2 ) (3) (4) (5) Type of Land Cover site TN Export TN Export TN Export Area Coeff. by Land Use From Site Acres Ibsla r Ibs r Ibs /ac r Permanently preserved undisturbed open space forest unmown meadow 0.00 0.6 0.00 Permanently preserved managed open space real landeca in etc. 1.51 1.2 1.81 Impervious surfaces (roads, parking lots, driveways, roofs aved store a areas etc. 2.74 21.2 58.01 Total 4.24 59.82 Powerhouse Church of Jesus Christ TN Export (As Proposed) 9/23/2013 DETENTION CALCULATIONS PRE -POST AND DETENTION SUMMARY 2 AND 10 -YEAR PRE -POST DETAILED CALCULATIONS WETPOND ATTENUATION CALCULATIONS powov ouso chuvch ®ff joouo, chft4 Revised: September 25, 2013 Powerhouse Church of Jesus Christ - P01 #1- TR -55 Method Powerhouse Church of Jesus Christ - POI #1 RALEIGH, NORTH CAROLINA Stormwater Attenuation Reauirements Usina TR -55 Methodoloav The following calculations summarize the pre - development and post - development discharge calculations for the 2 -year and 10 -year, 24 -hr storms using the TR -55 Methodology. HydroCAD computer software was used for performing the analysis. The following summarizes the findings of the analysis: PRE - DEVELOPED STORMWATER RUNOFF CALCULATIONS Pre - Developed Calculations: Drainage Area CN DA *CN Wooded Area 81,661 79 6,451,219 Grassed Area ( <50 %) 88,949 89 7,916,461 Impervious Area 4,802 98 470,596 Water Surface 23,233 98 2,276,834 Total 198,645 17,115,110 Drainage Area = 198,645 sf Composite CN = 86 Q2 Pre- Developed = 17.47 cfs Q10 Pre - Developed = 29.66 cfs POST - DEVELOPED STORMWATER RUNOFF CALCULATIONS Post - Developed Calculations: Drainage Area CN DA *CN Wooded Area 54,058 79 4,270,582 Grassed Area ( >75 %) 7,467 80 597,360 Impervious Area 3,415 98 334,670 Water Surface 23,233 98 2,276,834 Total 88,173 7,479,446 Drainage Area = 88,173 sf Composite CN = 85 Q2 Post - Developed = 7.50 cfs Q10 Post - Developed = 12.90 cfs Attenuation Required 2-Year Storm (02) = None 10 -Year Storm (Q10) = None No attenuation required since the post - development discharge does not exceed the pre - developed discharge for the Q2 and Q10. 1 9/24/2013 Powerhouse Church of Jesus Christ - P01 #2 - TR -55 Method 9/20/2013 Powerhouse Church of Jesus Christ - POI #2 RALEIGH, NORTH CAROLINA Stormwater Attenuation Reauirements Usina TR -55 Methodoloav The following calculations summarize the pre - development and post - development discharge calculations for the 2 -year and 10 -year, 24 -hr storms using the TR -55 Methodology. HydroCAD computer software was used for performing the analysis. The following summarizes the findings of the analysis: PRE - DEVELOPED STORMWATER RUNOFF CALCULATIONS Pre - Developed Calculations: Drainage Area CN DA *CN Wooded Area 50,535 79 3,992,265 Grassed Area ( <50 %) 27,259 89 2,426,051 Impervious Area 6,453 98 632,394 Total 84,247 8,280 7,050,710 Drainage Area = 84,247 sf Composite CN = 84 Q2 Pre - Developed = 6.91 cfs Q10 Pre - Developed = 12.06 cfs POST - DEVELOPED STORMWATER RUNOFF CALCULATIONS Post - Developed Calculations: Drainage Area CN DA *CN Wooded Area 15,389 79 1,215,731 Grassed Area ( >75 %) 70,693 80 5,655,440 Impervious Area 100,357 98 9,834,986 Water Surface 8,280 98 811,440 Total 194,719 17,517,597 Drainage Area = 194,719 sf Composite CN = 90 02 Post - Developed 19.36 CfS 010 Post - Developed = 31.29 cfs Attenuation Required 2 -Year Storm (Q2) = 6.91 cfs 10 -Year Storm (Q10) = 19.23 cfs STORMWATER DETENTION FACILITY DESIGN SUMMARY 1 Powerhouse Church of Jesus Christ - POI #2 - TR -55 Method 9/20/2013 Stormwater attenuation will be provided by Wetpond #1. The following summarizes information of the design of the wetponds as well as the attenuation provided using HydroCAD computer software: Summary of Area Drainino to Wetpond 1 Drainage Drainage Area = 184,879 sf Composite CN = 92 Area CN DA "CN Wooded Area 0 79 0 Grassed Area ( >75 %) 65,688 80 5,255,040 Impervious Area 119,191 98 11,680,718 Total 184,879 9.76 16,935,758 Drainage Area = 184,879 sf Composite CN = 92 The proposed attenuation provided by the wetpond provides enough stormwater attenuation so that the 02 and Q10 post - developed discharge does not exceed the pre - developed discharge. 2 Rational Method Storm Event cfs Description Q2 Storm 010 Storm Pre /R-40 Discharge 6.91 12.06 Post Discharge 19.36 31.29 Attenuation Required 6.91 19.23 Discharge Into BMP 18.85 29.82 Discharge Out of BMP 9.76 10.18 Attenuation Provided 9.09 19.64 The proposed attenuation provided by the wetpond provides enough stormwater attenuation so that the 02 and Q10 post - developed discharge does not exceed the pre - developed discharge. 2 (is) PRE - Discharge 1 2S POST- Discharge1 i PRE - Discharge2 IDI POST - Discharge2 S4 Reach on \--- i \ \CIVILSERVER\civil r\2012- 03jobs11213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Prepared by BASS, NIXON & KENNEDY, INC. Page 2 HydroCAD® 8.00 s/n 004300 © 2006 HydroCAD Software Solutions LLC 9/20/2013 5:15:52 PM Project Notes POWERHOUSE CHURCH OF JESUS CHRIST Danny L. Howell, Jr., PE These calculations will determine both the pre - developed and the post - developed outflows from this property. The methodology used will be the TR -55 method for runoff estimation, using the 2 and 10 year storms as the test storms. Per City of Raleigh codes, this site is allowed a 10% increase in both events without having to provide any detention measures. Investigation into the types of soils on this site (USDA Wake County Soils Survey) indicates that they are all Type D, therefore Curve Numbers corresponding with Type D soils are used in this study. Since the property is small, the TR -55 minimum time of concentration of 6 minutes is used for the calculations. Finally, the drainage area is assumed to be the property area. \1 CIVILSERVER \civil_r12012- 03jobs\1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Type// 24 -hr 2 -YR Rainfall = 3.60" Prepared by BASS, NIXON & KENNEDY, INC. Page 3 HydroCAD® 8.00 s/n 004300 0 2006 HvdroCAD Software Solutions LLC 9/20/2013 5:15:52 PM Subcatchment IS: PRE - Discharge 1 Runoff = 17.47 cfs @ 11.97 hrs, Volume= 0.831 af, Depth= 2.19" Runoff by SCS TR -20 method, UH =SCS, Time Span= 1.00-30.00 hrs, dt= 0.02 hrs Type II 24 -hr 2 -YR Rainfall= 3.60" Area (sf) CN Description 81,661 79 Woods, Fair, HSG D 4,802 98 Paved parking & roofs 88,949 89 <50% Grass cover, Poor, HSG D 23,233 98 Water Surface 198,645 86 Weighted Average 170,610 Pervious Area 28,035 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR66 Minimum Subcatchment IS: PRE - Discharge 1 Hydrograph 19 - r-- i-- r- �-- r- r- �-- r-T- ti-- r- �-- r- r- �-- r- r-- �-- r- 7-- r-r- ti-- r- r- -i- -r -� -- - T- - - - r-•t- -,- - r- -i - -r - r- -- - 1--'-- r- 1-- r- T- 1-- r- i-- r- r- 1--r- T- -r - -r-I 18 i 17.17 ers -r-- i-- r- -�-- r-r-- i - -r -T - �-- r- r- �-- r-r-7-- �- .y - -r- - - w -.r-r- - -�/- -- - r-- ,-- r-- - '-- r-- -r -T -- --- ,-- r-1-- r - --- -r r 18 i i' i i i � i i i i i i i i i i i i i i i i - r- ,-- r- �- -r -r- t- -r -T -- - -- r-r-� - -r-�- i- -r- -- �Riiilr i11,6160�� -- 15 - r-- ,-- r- �-- r-r-�- -r -r -� - �-- r- r- �-- r- T- �-- r-1--r- r-1-- r-T- -i- -r -1 -- 1a -T- ; -- -; - ; -- - ;- -� -T -; - ;---- r- ;-- �R�l�flf Metiz;198j645rS# - 13 i i i i i i i i 1 1 1 1 1 i i 12 err - i - -I --i - - -' -i - - -r -T- i - �- -�- -i -- ,jf1T1r_v�- ,1 ��ff'feOT8,7Ta _ - r - - - -r- - -r -r- - -r-T -1 -�- -�- -r- -- r- ?'- RIRIa#fbopW419110 i 1 - ----r- -- 1-'r-4-_r -r-1 -l--i-'r---r- T"-,--r1--�-_T- r- T--,- -r-1 -- E -r--,--r-1 --r -r--,---7- - �- -,--r-�--r-7- -,--r-7--i -r- , * r1 8 i i i i i i i i i i i i i i i i i - T--,-- r- 1-- r- r--,- -r-T =- - -- ,--r-1- -r-T- 1--r-1- -,--T-1--r- - -- - _��� _ ---- -- - - -- --- --- ----- - - - - -- - - r-- i - - ,-- r r- 1-- r-- r-- r- I-- r- r- 1- -r- r- -r -T -- ------ - - - - -- ---------------- - - - - -- - q- r-- �-- r- i - - r- r - n- -r -r - 1-- r-i-- �-- r- 1-- r- r-- �- -r -i -- 3 _ �_� 1 1 ' -� - �- -' -- — - - - -� _� i i i i --- - - - --- -- --- - - - --- - 2 i - T-- ,-- r- I-- r-r--,--r-T- -r - T - -,- -r - I- -,--r - t--r - T- -, --r- i -- I I 0 1 2 3 4 5 8 7 8 9 10 11 12 13 14 15 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Three (hours) \\ CIVILSERVER \civil_r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Type// 24 -hr 2 -YR Rainfall= 3.60" Prepared by BASS, NIXON & KENNEDY, INC. Page 4 HydroCADS 8.00 s/n 004300 © 2006 HydroCAD Software Solutions LLC 9/2012013 5:15:52 PM Subcatchment 2S: POST- Dischargel Runoff = 7.50 cfs @ 11.97 hrs, Volume= 0.355 af, Depth= 2.10" Runoff by SCS TR -20 method, UH =SCS, Time Span= 1.00-30.00 hrs, dt= 0.02 hrs Type II 24 -hr 2 -YR Rainfall =3.60" Area (sf) CN Description 54,058 79 Woods, Fair, HSG D 7,467 80 >75% Grass cover, Good, HSG D 3,415 98 Street 23,233 98 Water 88,173 85 Weighted Average 61,525 Pervious Area 26,648 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR55 Minimum Subcatchment 2S: POST- Dischargel Hydrograph 1 I 1 1 1 1 1 I 1 1 1 1 1 1 1 I I I I I_ I_ 1 I I I I I I ----------------------------------------- - - - - -- -------- - - - - -- I 1 1 1 1 1 1 I 1 I I I I 1 1 I 1 1 I I I I 1 I I I I' 1 ■ RUrloff 8 I 1 1 1 1 I 1 I I I 1 1 I I 1 1 I I I I I I I I I I I 1 1 1 1 t 1 I 1 ].� d� I 1 I 1 I 1 1 I I 1 I 1 1 1 I I I 1 1 1 1 1 I I I I I 1 I I I 1 I I PI 41-y �I �� y Y - ^I-- L-- 1-- I ^ -� -J - J-- 1- _L- 1__I_ -L -1 -- fix/ rQ jr�/��'L�, Tj l�l �,�,�`[ 1 7 1 1 1 1 I 1 I 1 I I 1 I I 1 1 1 I I 1 - t-- 1- -r- �-- r-r- �-- I - -r-i - i- �-- r- 7-- I- -r- �-- r- r- �-- r- r- '1-- r-�- -1- -r- Rdnbff Ar6a^88j173:sf I 1 I I 1 1 I I I 1 1 1 1 I 1 1 I 1 I 1 I 1 1 1 1 1 I- I I I 1 1 I I 11 II�*1 ^� I 1J A L _ .1 _ 1_ _ L -4 - - I_ _ L _ .1 ^ -4:- _ L _ 1 _ I - - 4 - � I iot bi pjhJ 4 1-01 - I I 1 I I 1 1 1 I I 1 1 I I 1 I I 1 I I 1 I I I I 1 4 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 t 1 I 1 I x.1.1 i 1 ,1 cr6.01 nI ! l - T-- ,-- r- �-- ,- -r- �- -,- -r- -- r-- I-- r- T--,-- r- -�-- ,-- r-- ,-- r-- T-- ,--- -� - -r-Gi 3 1 1 1 1 1 t t I 1 1 I I I I 1 I 1 1 1 I I I 1 1 I 1 1 1 I 1 I I 1 1 1 1 I I I 1 1 I 1 1 I I I I I I I -1- �--L-J- -- L-J ^-I--L- -J--I-- L-1--I-- LI1 -J I I I 1 --.L --L-L' �- -1--J- �--L- i 1 I 1 1 I 1 1 I 1 1 1 1 1 I 1 I 1 1 1 I 1 2 1 1 1 1 I 1 1 1 1 1 1 1 1 1 I I 1 1 1 I I 1 1 I 1 I 1 I 1 1 1 1 I 1 I 1 1 1 I 1 I 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 1 I 1 I 1 1 1 1 I I 1 1 1 I 1 1 1 1 t 1 - t - -1- - 1•' - '1 ^ -I^ - Y - '1 - - I- - t - -'1 - -I ^ ^ f � t � _I _ _ r _ Y _ _ t- - t - -1 _ - F� _ t _ _I _ _ r ^ '1 _ _I_ _ r - 1 t 1 I 1 I 1 1 I 1 I 1 1 I 1 1 I 1 1 1 1 1 1 I I 1 1 1 2 3 4 5 8 7 8 8 10 11 12 13 14 15 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Time (hours) \\ CIVILSERVER \civil_r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Type ll 24 -hr 10 -YR Rainfall =5.38" Prepared by BASS, NIXON & KENNEDY, INC. Page 7 HydroCAD® 8.00 s/n 004300 ® 2006 HydroCAD Software Solutions LLC 9120-0013 5:15:52 PM Subcatchment IS: PRE - Discharge 1 Runoff = 29.66 cfs @ 11.97 hrs, Volume= 1.453 af, Depth= 3.82" Runoff by SCS TR -20 method, UH =SCS, Time Span= 1.00-30.00 hrs, dt= 0.02 hrs Type II 24 -hr 10 -YR Rainfall = 5.38" Area (sf) CN Description 81,661 79 Woods, Fair, HSG D 4,802 98 Paved parking 8 roofs 88,949 89 <50% Grass cover, Poor, HSG D 23,233 98 Water Surface 198,645 86 Weighted Average 170,610 Pervious Area 28,035 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR55 Minimum Subcatchment IS: PRE - Discharge 1 Hydrograph -1-1 _ _J_ _ L --J--: _ _ L _ J _ _ L . 1 - J - . 1-,- _ _ L _ J 1 I I I 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 1 ■ RunoH 32 - 1- -I--L- �-- 1- -L- -1 -_L_1 _j '-- L-J- -L- 1-J- -L- 1-- '-- L- J_-L-1- '- _L -� -- I I 1 I 1 1 1 1 I 29,99 do 1 I I 1 1 I I I 1 I I 1 I 1 I 1 1 30 1 I 1 t 1 I I I I 1 I I I I 1 1 1 1 -; - -, - -; 1\ CIVILSERVER \civil_r12012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Type// 24-hr 10 -YR Rainfall = 5.38" Prepared by BASS, NIXON & KENNEDY, INC. Page 8 HydroCAD® 8.00 s/n 004300 0 2006 HydroCAD Software Solutions LLC 9/20/2013 5:15:52 PM Subcatchment 2S: POST- Discharge1 Runoff = 12.90 cfs @ 11.97 hrs, Volume= 0.628 af, Depth= 3.72" Runoff by SCS TR -20 method, UH =SCS, Time Span= 1.00-30.00 hrs, dt= 0.02 hrs Type 1124 -hr 10 -YR Rainfall = 5.38" Area (sf) CN Description 54,058 79 Woods, Fair, HSG D 7,467 80 >75% Grass cover, Good, HSG D 3,415 98 Street 23,233 98 Water 88,173 85 Weighted Average 61,525 Pervious Area 26,648 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR66 Minimum Subcatchment 2S: POST- Discharge1 Hydrograph 14 I 1 1 1 1 I I 1 4 I 1 I I 1 t 1 I I I 1 I 1 I 1 1 1 -7--t- -('-�--� -�'--t--j - 12.90d� - �--1- -r- i-- �- 1-- 1-- r- �-- 1-- r-- 1-- �'- 7--t- -T -'j- 13 1 1 I I 1 I I I I 1 I 1 1 1 1 I I 1 I I - -; -; - -; - -; - ; - ; - -; - -; -j- -I I -; - ;-TY601;2 I -�ar;a X - 12 - rI -- 1-- rI - -1 - -r -t- - r -t --1 ' 1 I 1 1 I I 1 11 I 1 I I I I I 1 1 I 1 1 1 1 I 1 I I I I 1 I I 1 I I 1 - r- -1--r- t - -r - r -Aria= U&173r 10 I 1 I I 1 1 I 1 1 1 I 1 1 I 1 9 80njD alu "Im�e068f 1 1 I I 1 I 1 I I� 1 la bF \.2,'- •� 8 1 1 I 1 1 I 1 1 1 1 1 1 1 1 1 1 I �u' ri 7 I 1 1 1 1 1 1 1 1 I 1 1 1 1 I I I 1 1 /�1 �I1 I I _J__1__1_J__L _1_J TC,-V. Vl lli I 8 1 1 1 1 1 t 1 1 1 1 1 1 I I 1 I I 1 1 1 1 1 1 1 1 I 1- J _ _I- _ I. - -1 _ -1..- 1 - -1 � 1 I I 1 1 1 1 1 1 1 I 1 1 I 1 I I 1 1 I 1 I ■V�,�Y1 5 1 I I 1 I 1 1 1 1 1 1 1 I I 1 1 I 1 1 1 1 1 1 1 I - r-- 1-- r- ti-- 1-- r-- 1 - -r -t- -'1--I--}--7--r-Y--1--r-1--t--t-ti--r-r--I--}--1- 1 I 1 4 - - �--� -J- �--L-- -1 - -5- --- -L- - -� -1--- L- 1- -1 --�- �-- �-1- - -L -S- I 1 I 1 1 I I I I I 1 1 1 I I I 1 I 1 1 I I I I I 1 3 1 1 I 1 1 I I 1 1 I 1 1 I 1 1 I 1 I 1 I 1 I I t 1 I I 1 I 1 I 1 I I 1 1 1 1 1 1 I I 1 1 1 I 1 1 I t 1 I 2 I 1 I I 1 1 1 1 1 I 1 1 I 1 1 1 1 I 1 1 1 I 1 1 I I - r--t- -r- y-- r- r- -1--r-t- -t--r-r--1--r-t--1--r-ti--1--t-ti--r-r--I--r-y- ' I I I I 1 I I 1 1 1 1 I I 1 I 1 1 I 1 1 1 1 I I 1 11 12 13 14 15 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Time (hours) ■ Runoff \ \CIVILSERVER \civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Type 1124 -hr 2 -YR Rainfall = 3.60" Prepared by BASS, NIXON & KENNEDY, INC. Page 5 HydroCAD® 8.00 s/n 004300 ® 2006 HydroCAD Software Solutions LLC 9/20/2013 5:15:52 PM Subcatchment 3S: PRE - Discharge2 Runoff = 6.91 cfs @ 11.97 hrs, Volume= 0.326 af, Depth= 2.02" Runoff by SCS TR -20 method, UH =SCS, Time Span= 1.00-30.00 hrs, dt= 0.02 hrs Type it 24 -hr 2 -YR Rainfall= 3.60" Area (sf) CN Description 50,535 79 Woods, Fair, HSG D 6,453 98 Paved parking & roofs 27,259 89 <50% Grass cover, Poor, HSG D 84,247 84 Weighted Average 77,794 Pervious Area 6,453 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR66 Minimum Subcatchment 3S: PRE - Discharge2 Hydrograph I I I I 1 1 I I 1 1 I 1 1 1 1 I I I 1 1 1 1 1 I 1 I I I I 1 I I I 1 ■ RunoH --I L-1- J---L- 1- --I- -L- - -L-1- J- -1- -J - --L- 1 1 I 1 1 1 I I 1 I I I 1 1 1 1 I I_ - 1 I I -;- , , - ; - -, - -; - ; - -f, V ain� fillp=3: 0.- 1 1 1 1 1 1 I 1 1 I 1 I 1 I 1 I I I I 1 1 I 1 1 I 1 - ;-- :_R-UmbffAr4a* ^84j247_:-sf_ 1 1 I 1 1 I 1 1 1 1 1 1 1 1 I I Rgnoff Vojuj ne40:326; at 1 I 1 I 1 I I I 1 1 I I 1 1 1 I 1 1 I 1 1 I 1 I I 1 1 I i I -4J -- 1_ 1 i , I I I 1 �+r , I I I - I r 1 r f 1 (-- 1 I 7 I I I I 1 I I I 1 1 1 I I I 1 1 I 1 I 1 1 1 1 I I I I I 1 CN =84' I 1 1 I I I I I I I I I I I 1 1 I 1 1 I I I I I 1 1 1 I I I I 1 1 I 1 1 1 I I I I 1 1 1 1 I 1 1 I 1 1 1 I I I I I t 1 1 1 I 1 i I I I I 1 1 I I I I I 1 I I 1 1 I 1 I 1 1 1 1 I 1 1 1 I 1 1 1 1 1 1 1 I I 1 I 1 I 1 I 1 I 1 I 1 I I 1 I 1 I 1 I I 1 I I 1 I I 1 1 I I 1 I 1 I I 10 11 12 13 14 15 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Time (hours) I 1 1 1 1 1 I I 1 I I 1 1 I I I I I 1 1 1 1 1 1 1 1 I C I 1 1 1 1 1 I I I I I I I I 1 1 I I 1 1 1 1 1 I I 1 1 8 1 1 1 1 I 1 I I 1 1 I I 1 1 I I I 1 1 I 1 1 1 1 I 1 I I I 1 I I 1 1 1 1 g 1 1 I 1 1 I I I 1 1 1 t 1 1 1 I 1 I I I I I I I 1 1 I y ;- -1 1 -- 1-- L - - -1- v 4 1 1 1 1 1 1 1 1 1 1 I I I 1 1 1 I 1 I I I 1 I I I 1 1 1 1 I 1 1 3 1 I I I 1 I I I I 1 I 1 I I I 1 1 I I I I I I 1 I I I I I 1 1 1 1 1 1 1 , 2 I I I 1 1 1 I 1 1 I 1 1 1 1 1 1 1 1 I I 1 I 1 1 1 1 1 I I I 1 I 1 I I I , ----- --- -- - - --- 1 I 1 I I I 1 1 I I I 1 1 1 1 1 1 1 I I I I I I 1 1 I 1 Hydrograph I I I I 1 1 I I 1 1 I 1 1 1 1 I I I 1 1 1 1 1 I 1 I I I I 1 I I I 1 ■ RunoH --I L-1- J---L- 1- --I- -L- - -L-1- J- -1- -J - --L- 1 1 I 1 1 1 I I 1 I I I 1 1 1 1 I I_ - 1 I I -;- , , - ; - -, - -; - ; - -f, V ain� fillp=3: 0.- 1 1 1 1 1 1 I 1 1 I 1 I 1 I 1 I I I I 1 1 I 1 1 I 1 - ;-- :_R-UmbffAr4a* ^84j247_:-sf_ 1 1 I 1 1 I 1 1 1 1 1 1 1 1 I I Rgnoff Vojuj ne40:326; at 1 I 1 I 1 I I I 1 1 I I 1 1 1 I 1 1 I 1 1 I 1 I I 1 1 I i I -4J -- 1_ 1 i , I I I 1 �+r , I I I - I r 1 r f 1 (-- 1 I 7 I I I I 1 I I I 1 1 1 I I I 1 1 I 1 I 1 1 1 1 I I I I I 1 CN =84' I 1 1 I I I I I I I I I I I 1 1 I 1 1 I I I I I 1 1 1 I I I I 1 1 I 1 1 1 I I I I 1 1 1 1 I 1 1 I 1 1 1 I I I I I t 1 1 1 I 1 i I I I I 1 1 I I I I I 1 I I 1 1 I 1 I 1 1 1 1 I 1 1 1 I 1 1 1 1 1 1 1 I I 1 I 1 I 1 I 1 I 1 I 1 I I 1 I 1 I 1 I I 1 I I 1 I I 1 1 I I 1 I 1 I I 10 11 12 13 14 15 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Time (hours) \\ CIVILSERVER \civil_r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Type 11 24 -hr 2 -YR Rainfall= 3.60" Prepared by BASS, NIXON & KENNEDY, INC. Page 6 HydroCAD ®8 00 s/n 004300 © 2006 HydroCAD Software Solutions LLC 9120/2013 5:15:52 PM Subcatchment 4S: POST - Discharge2 Runoff = 19.36 cfs @ 11.97 hrs, Volume= 0.947 af, Depth= 2.54" Runoff by SCS TR -20 method, UH =SCS, Time Span= 1.00-30.00 hrs, dt= 0.02 hrs Type II 24 -hr 2 -YR Rainfall= 3.60" Area (sf) CN Description 15,389 79 Woods, Fair, HSG D 70,693 80 >75% Grass cover, Good, HSG D 100,357 98 Paved parking & roofs 8,280 98 Water 194,719 90 Weighted Average 86,082 Pervious Area 108,637 Impervious Area Tc Length Slope Velocity Capacity Description 6.0 Direct Entry, TR55 Minimum Subcatchment 4S: POST - Discharge2 Hydrograph _+-_I--1'-I--1--1'--I--1--4--1_-1- --i -_I__t--4-_1--_t--1--}-y-_I__}-y-_1--t_N--t-- 1 1 1 I 1 I 1 1 1 1 1 I 1 1 1 I 1 1 I I _I I 1 I 1 I I 1 ■ RunoN 20 21 T ' 1 1 1 I 1 -� - ' - -' - -! 19 �9 dt -' --' - -' -- -- -I -- - �_ i _ 1 I 1__L _ I I I I ------ - -- - -- - - - - -- -- I 1 1 1 I I 1 I 1 t 1 I I �1---- -/- - -- 17 - T- -1 - -r -1- r- f- 1- -r -T -7 I 1 1 1 1 1 1 18 - T- '1 "r- l "I""1 -1 "1- -T -1 -- l T T- -'-- i - -L --'- i - -'-- '- -I- --' - ' -'- '-- '- --' - -i ff-dff A 15 � I 1 1 1 1 I I 1 1 1 I 1 1 1 1 1 I 14 _1_J__L_J__1__L_J__L_1_J _JL_J_ J of J__ L }� 4pW4#4!'- 12 - r- -1- -r- -- 1-- r-- 1- -r -T -� - - -r-r- -- r_,__Runotf-b 11 1 1 I 1 I I 1 - r-- 1-- r- -1--r- r-- ,- -r-T -� - �-- I-- r- �-- �- -r-- I-- r- 7- -r -r - r - r- - I- -r - i -- 10 -. L__I__L_J- J__L- J__1-_1_J J__I__1_ I I 1 1 1 1 1 I 1 1 I I I 1 1 1 I 1 1 I 1 I rri -- 9 _1__I__L_J__I__ L__I__ L_ 1_ _J__I__L_J__L _1_J__L_1__1__L _J__L _ L__I__ L_-1 1 I 1 1 1 1 1 1 1 1 I I 1 1 1 I I 1 1 1 1 1 I ��,I- 1 7 - T-- 1-- r- 'I-- I-- r--I�-r-Y- -'1--I-"f---1--r-Y--1--r-y--I_-t--I--t--7--I--t-ti-- ' 1 I I I I 1 1 I 1 1 I I 1 1 I 1 1 1 1 1 1 I I I 1 1 $ _1__I__L_J__I__L__I__L._1_ _J__1__L_J__L _1_J__L_J__I__1_J__L_L_J__1 _J__ 1 I 1 1 I 1 I 1 1 I 1 1 I 1 I 1 1 1 1 I 1 1 1 I 1 I 4 _ 1 _ _I _ _ L _ J _ _I_ _ L __j_ _ L _ 1 _ __j _ -1-- 1 _ J _ -1 _.L _ I_ _ L 1 I 1 1 I 1 I 1 1 I I 1 I 1 I 1 I 1 1 1 I 1 I I 1 1 2 � -T-- I-- ►'- �- -I-- f--1- -r -T- --I--T-I--r-T-I--T-1--I-"T-1--r-T--I--r-7-- 1 1 1 1 1 I I I i 9 10 11 12 13 14 15 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Time (hours) \\ CIVILSERVER \civii_r\2012- 03jobs\1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Type// 24 -hr 10-YR Rainfall = 5.38" Prepared by BASS, NIXON & KENNEDY, INC. Page 9 HydroCAD® 8.00 s/n 004300 4 2006 HydroCAD Software Solutions LLC 9/20/2013 5:15:52 PM Subcatchment 3S: PRE - Discharge2 Runoff = 12.06 cfs @ 11.97 hrs, Volume= 0.583 af, Depth= 3.62" Runoff by SCS TR -20 method, UH =SCS, Time Span= 1.00-30.00 hrs, dt= 0.02 hrs Type II 24 -hr 10 -YR Rainfall =5.38" Area (sf) CN Description 50,535 79 Woods, Fair, HSG D 6,453 98 Paved parking & roofs 27,259 89 <50% Grass cover. Poor, HSG D 84,247 84 Weighted Average 77,794 Pervious Area 6,453 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR55 Minimum Subcatchment 3S: PRE - Discharge2 Hydrograph 14 18 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Time (hours) - 1 L _ J - _I_ _ L --J- - L- - 1 _ -J- _ L -J _ _ I _ _ 1 _ J - - L - J - J _ _ L _ J _ _ 1_ _ L - J _ _ L _ 1 _ -I- - L _ J I I I I I I 1 I 1 1 I I 1 ■ Runoff 13 1 1 1 1 1 I 1 1 I 1 I 1 1 1 1 I I 1 1 1 1 1 1 1 1 1 - '�--1- -1'-'1- -1- -� - -1- -1'-'1. 12.08 d� -' 1-- 1_- i" "',--1- 4-'1--,*--4--1- '�'- �--F'- 4---1--4--4 ,2 1-- 1-- -r -T -1 I - '1- �T� -r - 11 r- T-- 1- -T- - -r-1- - -r- -_f _T_1 11�� %1�r* I� I R1 1 I _1I_- -1-_T- - -r_T__ R �`HIItfal�&3811 ,� 1 1 1 1 I I 1 I I 1 I 1 1 1 1 I I I 1 1 1 1 1 r1- I I I 1 I 1 I I 1 1 1 1 11 1 1//��11y 1 1 I 1 I 1 I -r --r - r-I--r- r- -1--r-T-n - ,1--r-r- 1--r- R -Unbff Ar 6a*84=iT7Y s# - 9 1 1 I I 1 1 1 1 1 1 1 I 1 1 I I I I I I 1 1 1 I 1 1 1 1 I I 1 1 I 1 1 1 1 - T-- ,-- r- ,-- ,-- r-- , - -r -T- ; 1 1 I I_ 1 1 1 1 1 1 1 1 1 - ,-- ,- -r - -�- Arco Yafull &OT5$�Ta - B I I 1 1 1 1 I I 1 1 I 1 I I 1 1 1 1 I 1 1 1 1 1 I I 1 1 I 1 I I 1 I 7 I 1 1 1 I I 1 I I 1 I 1 I I I 1 o�epFhf2�r- :Run-- 8 i - 1_J_- L- J- J__L_J-- 1--1-J I I I 1 I 1 1 I I 1 -J--1--1'J--L-J-J--L-J1--L--1"L-L--1--1-J-- 1 I I I 1 I 1 I I I I � ./fir' rh Ih LL 1 1 1 1 1 1 1 I 1 I _1__I -_L_ J __1__ L_J__L_ 1- 1 1 1 I 1 1 1 1 1 1 1 Icr .0 - J__ I__ L- J-- L_ J_J- _L_J- _I__1_J__L_1- _I__1_J__ 5 I 1 1 I I 1 I I I 1 I I 1 1 1 I I 1 1 1 1 1 ■VV__ 77VVKK4 4 1 1 1 1 I 1 1 1 1 1 1 1 1 1 I 1 I 1 1 1 1 I 1 I I 1 - 3 1 1 1 1 I 1 1 I I 1 1 1 I 1 1 1 I 1 1 I I 1 I 1 1 I 1 1 I 1 1 I 1 1 1 I 1 I I I 1 I I I 1 I 1 I I 1 1 I - r-- 1-- r-- 1- -r-r-- 1 --r-Y- -ti-- I-- r- r- r- Y-- t--r-�-'I-- r-- L--r-t--I--r-�-- .j I 1 1 1 1 1 1 1 1 1 I 1 I I 1 1 I 1 1 1 1 I I I 1 I 4 1 1 I 1 1 1 1 1 1 - T- -1-- f- '1_- 1_- r - -1__r _T_ 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 I I 1 1 1 1 1 I I 1 I ' 7-_ I__ r_ 1__ r_ T_n_- r_T__I__T_1__r_T__I__T_l_- 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 14 18 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Time (hours) \\CIVILSERVER \civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - PRE -POST Type 1124 -hr 10-YR Rainfall = 5.38" Prepared by BASS, NIXON & KENNEDY, INC. Page 10 HydroCAD® 8.00 s/n 004300 © 2006 HydroCAD Software Solutions LLC 9/20/2013 5:15:52 PM Subcatchment 4S: POST - Discharge2 Runoff = 31.29 cfs @ 11.97 hrs, Volume= 1.581 af, Depth= 4.24" Runoff by SCS TR -20 method, UH =SCS, Time Span= 1.00-30.00 hrs, dt= 0.02 hrs Type II 24-hr 10-YR Rainfall= 5.38" Area (sf) CN Description 15,389 79 Woods, Fair, HSG D 70,693 80 >75% Grass cover, Good, HSG D 100,357 98 Paved parking & roofs 8,280 98 Water 194,719 90 Weighted Average 86,082 1 1 1 1 1 1 1 1 1 I - - -- 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 Pervious Area 108,637 28 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR66 Minimum Subcatchment 4S: POST - Discharge2 Hydrograph 34 - r-- 1-- r- i-- 1-- r- -1-- 1-- 1--1 --r -'1--I - -r- i--r-7-"1--r-9--I--r-"1--r-r--1--r-1-- I I I 1 1 I 1 I 1 I 1 I 1 1 I I 1 I I I I 1 1 1 I 1 I I ■Runoff 32 1 1 I I I I i 1 1 �t28 eh I 1 I I I I 1 1 1 I I 1 I I I I I 1 1 1 1 1 1 1 1 1 I -- I I 1 1 1 I 1V- e11112� r11 30 1 1 1 1 1 1 1 1 1 I - - -- 1 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 I 1 1 I 1 1 I Y -- - - -- - - -- -- I 1 1 1 T 1- I T � r - -, r r- - - -r -7 1 1 I I 1 1 I I 1 1� 28 - T' -1 "1 1-- r-r - -I''i 'T- RI��M��l.-�ii "1'-1''T -'1-'I -T'1' -r -� "i 1 � e�-- 26. 24 I I I I I 1 I I I 1 ' 1 I I 1 I 1 I 1 1 1 I I 1 I 1 I I off;A�e�l=�'1�4�7fiTO— -i -- -- -;- - -�- - -� -i - - - -- - � - -Rlir 22. -J1 --Nnoff �'VI 1u1 1 1$ 4lj 5$1L 1 - 20 _ 1 I I_ r 1 - -� - I I 1 1 1 1 1 - -, - -; ;-- ,-- ;-- ,RGi1b��jS1th1 =4�' -- 18 1 1 I 1 1 1 1 1 1 1 1 1 1 1 I 1 1 3 - T-- 1-- r- 7-- r- r-- I- -r -1 -9 ' -1 - -1 -f- 1- -r-1-1--r-T-- 1 - -T -1 - r- T-- I- -r -1 -- ° 18 I 1 I 1 I I 1 1 1 I I 1 1 1 I 1 I 1 1 I I A- /y • 1.� TCi�V.V 14 12 I 1 1 1 I 1 1 1 1 L _ J _ _I_ _ L _ J _ _ L _ 1 - I I 1 1 1 1 I I I 1 I I I I 1 -1 _ _ 1 _ _ L _ J _ _'L _ 1 _ -I'-- L _ 1- _ I_ -1. _ J _ _ L _ Y\ lV_ _ - - - - J - '- - t -j- -1- - - - - , - -1- - - I 1 - ' - - L - - - I- - 1 I I 1 I L - - - -, 10 1 1 I I I 1 I 1 I I I I 1 1 1 1 1 1 1 1 1 1 I I I I - T-- ,-- r- 1-- ,-- r-- , - -� -T- ---,-- T---- T--- r- 1-- r- T---- T- -I - -T- , -- 8 I 1 1 I I 1 I I 1 1 1 1 1 1 1 I 1 1 1 I 1 1 1 I 1 I 8 1 1 1 1 I 1 I 1 1 I 1 I 1 1 1 1 1 t 1 1 1 1 1 1 1 - 4- -1- -1'- '+-- 1-- 1"- -I--1 - -�- -4 - 1-- L- A--'1- -4-1- -+'- '1-- 1- - +- �-- 1"- +--1-- +-'1 -- 4 I 1 1 1 1 1 I 1 1 -� - - -� - - --L- �- -I- -�_ I 1 1 1 I 1 I 1 1 I I 1 1 I t 1 I !_!L-- -1 - -�- �--L- �- -1- -L- �- -� -1-- -L -� -- 1 1 1 1 1 1 I 1 1 1 1 I I 1 1 I 1 1 I I 1 1 I I 1 2 3 4 5 8 7 8 9 10 11, 12 13 14 15 18 17 18 19 20 21 22 23 24 25 28 27 28 29 30 Time (hours) 1S TO BASIN Su4 Reach on Link 90% TSS WETPOND \ \CIVILSERVER \civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Prepared by BASS, NIXON & KENNEDY, INC. Page 2 HvdroCAD ®8 00 s/n 004300 ® 2006 HvdroCAD Software Solutions LLC 9/20/2013 5:27:10 PM Project Notes POWERHOUSE CHURCH OF JESUS CHRIST Danny L. Howell, Jr., P.E. These calculations will determine the amount of attenuation provided by the proposed wetpond. The methodology used will be the TR -55 method for runoff estimation. Investigation into the types of soils on this site (USDA Wake County Soils Survey) indicates that they are Waker (WkE) for the drainage area, therefore Curve Numbers corresponding with Type D soils are used in this study. The TR -55 minimum time of concentration of 6 mins was used for calculations. Routing information has been provided for the 2, 10 and 100 -year design storms. i \ \CIVILSERVER \civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type 1124 -hr 2 -YR Rainfall = 3.60" Prepared by BASS, NIXON & KENNEDY, INC. Page 3 HydroCAD ®8 00 On 004300 ® 2006 HydroCAD Software Solutions LLC 9/20/2013 5:27:10 PM Subcatchment 1S: TO BASIN Runoff = 18.85 cis @ 11.96 hrs, Volume= 0.906 af, Depth> 2.56" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 2 -YR Rainfall= 3.60" Area (sf) CN Description 65,688 80 >75% Grass cover, Good, HSG D 119,191 98 Paved parking & roofs 184,879 92 Weighted Average 65,688 Pervious Area 119,191 Impervious Area Tc Length Slope Velocity Capacity Description M Direct Entry, TR66 MIN Subcatchment 1S: TO BASIN Hydrograph - - -- --- -I - - -- - - -- - -- - - -- - -- -- - - -- --- - - -- -- - - - - -- -- - - - - -- 21 I I 1 1 1 I I I I 1 I 1 I I --- �---- r---- 1---- r---- 1---- �---- r---- I---- r---- r--- �---- r--- �--- -T - - -- ■Runo1( 20 , - -- - --- --- I 1__ -- 1 1 1 I I I 1 I 1 1 1---- T --- -I � 1B.65CU -- -- ---- 19 -- -�-- - -L - -- - -1 - -- - - -J -- - -- -L - -- V - - -- I 1 1 1 I 1 I I jipo - - -- - -- 1a--- +---- +---- I---- +---- I- - - -J -- ---- I--- --- - -- -- 17 I 1 I 1 1 1 I I 1�IIr.V1V„-- 1 I 1 1 1 1 1 1 I 15 ' --- ;-- - -T - -- ---- T---- ,- - - -; -- - -- ;- RtinoffArba= 184;U -S�9 - �1! 1 1 I Act. s 13 - -- ---- j--- -I---- '---- -I - - -- -- ---- II��IIpo �V-o(- -- ii6;9LV!a-1 -- I I 1 1 1 1 I 12 _ _ J _ _ _ _ L _ _ _ -1 _ _ _ _ 1 _ _ _ _ 1_ _ _ _ J _ I ------ _ L _ _ _ _ L - J 1 I 1 1 1 I I I 1 I I 1 I 10 LL I 1 1 1 I I 1 I 1 1 ■ IV- -- - - - 9 --- 1---- r---- 1--- -r-- -- r - - -1- ---- 1---- r- --- r- --�---- r - - -� - - -- 7 ---- 1---- �'- --- 1---- �'---- 1 -- --J- --- �- - - - IT 1---- J-- -- I---- J-1 --- �' -- -- I I 1 1 I I I --- 1 I 1 1 8 ' ---J----L--_!--- -1--_- I----J- --- -I--_- L----L ---J-_--L'---J----1---- i 1 I 1 I I 1 1 I I I 1 1 1 Jr---- +---- 1__ - --�_ _--_ 1----+- --- I---- '�- ___I..--- J--- - + - - -- i 1 1 1 I 1 1 1 1 1 I 1 1 I 4 - --'1- --- �'---- 1-- -- +---- I - - - -J- --- 1---- +---- 1-- -- '1---- �"---- --- '� - - -- � 1 1 1 1 1 I I I 1 I I I I 3 - --ti-- --r---- r---r-- --r ---�- --- 1---- r---- r--- ti---- r-- -�--- -r- - -- ' 1 1 1 1 I 1 1 1 1 1 I I 1 1 ' MP 7 8 8 10 11 12 13 14 1s 18 17 18 Time (hours) \\ CIVILSERVER \civil_r\2012- 03jobs\1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type// 24-hr 2 -YR Rainfall--3.60" Prepared by BASS, NIXON & KENNEDY, INC. Page 4 HydroCADO 8.00 s/n 004300 © 2006 HydroCAD Software Solutions LLC 9/20/2013 5:27:10 PM Pond 1 P: 90% TSS WETPOND [82] Warning: Early inflow requires earlier time span Inflow Area = 4.244 ac, Inflow Depth > 2.56" Inflow = 18.85 cfs @ 11.96 hrs, Volume= Outflow = 9.76 cfs @ 12.06 hrs, Volume= Primary = 9.76 cfs @ 12.06 hrs, Volume= Secondary = 0.00 cfs @ 5.00 hrs, Volume= for 2 -YR event 0.906 of 0.671 af, Atten= 48 %, Lag= 5.9 min 0.671 of 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 248.59'@ 12.06 hrs Surf.Area= 11,731 sf Storage= 16,795 cf Plug -Flow detention time= 110.5 min calculated for 0.671 of (74% of inflow) Center -of -Mass det. time= 48.7 min ( 804.7 - 756.0 ) Volume Invert Avail.Storaae Storage Description #1 247.00' 34,378 cf Stage /Storage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 247.00 8,280 0 0 247.50 10,310 4,648 4,648 248.00 11,010 5,330 9,978 249.00 12,240 11,625 21,603 250.00 13,310 12,775 34,378 Device Routina Invert Outlet Devices #1 Primary 239.40' 12.0" x 75.8' long Culvert RCP, groove end projecting, Ke= 0.200 Outlet Invert= 239.00' S= 0.0053? Cc= 0.900 n= 0.013 #2 Device 1 248.00' 48.0" Horiz. Standpipe Limited to weir flow C=0.600 #3 Device 1 247.00' 1.5" Vert. Orifice C= 0.600 #4 Secondary 249.35' 45.0' long Sharp - Crested Rectangular Weir 2 End Contraction(s) mary OutFlow Max =9.76 cfs @ 12.06 hrs HW= 248.58' (Free Discharge) i ri =Culvert (Barrel Controls 9.76 cfs @ 12.42 fps) '-2_Standpipe (Passes < 18.04 cfs potential flow) -3 =Orifice (Passes < 0.07 cfs potential flow) Jecondary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 247.00' (Free Discharge) _r �= Sharp - Crested Rectangular Weir ( Controls 0.00 cfs) \ \CIVILSERVER \civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type // 24 -hr 2 -YR Rainfall= 3.60" Prepared by BASS, NIXON & KENNEDY, INC. Page 5 HydroCAD ®8 00 On 004300 ® 2006 HydroCAD Software Solutions LLC 9/20/2013 5:27:10 PM Pond 1 P: 90% TSS WETPOND Hydrograph - -- - -- - -- - -- ------ -- - - -- F - -- . - -- - -- ------------ t - -- 4 - - 1 - - -, -- , ------;---;---;---------- - ,---- ,---- ,---- ,---- ,--- -, - - -- ■Inflow '� - -- --- ---- +--- +- - -� - -- �eeea. -- +- - -+ - -- - -- +---- 1------ - -� - -- 13Oudiow ' --- r-- -r--- r--- T--- T - - -T- - -- - - ---1 - -� -- �nfC�W��a� a4 -4c Primary 21 ' , ___L___L___1___1___1___1_ 1 1 1 I 1 ___ J __ ■ -- 1 1 I 1 I I I ■Seconds ♦',' , 1 ' • ,- , 1 1 1 I I I 1 e'1-'W-��� -Qr�II 19 ,' ----- -�-- -; - - -7 -- T- --1- - -- , fA, ��VV 1 I -'- --- 18 �' ,' ♦,','♦ L_. _L___1___1___4 - - -1_ �_�_1j____I____I____1____�___ m "' 17 , ♦ ---r--- r--- T - - -T - - -T_ _T- -d- - -- -----Stott %b=16 18 - L--- 1--- 1 ---1- ---J ^--J---J--- �--- �-- --1----1-- -- ,' ,♦ 1 I I 1 1 1 I I I 1 I I I ' 1 1 I 1 1 I 1 I 1 I 14 13 ♦'''' ___L ___L___1 ___1___1__ -� -___I_-_-1_-_-I--- �iiijjjj 12 -- -r- --r--- r-- -r - - -t 9.78 do ' -- I- - -ti- - ti- -- -�--- -1-- -- r- --r --- ,' ' ' ' .' ' ♦',' - --� --- L- - -L- ^ -L --L- 1 1 1 I I 1 -- --- 1 I 1 1 I -- --------------------- I 1 1 I 1 1 1 ♦ ♦',' , 1 1 1 I 1 1 1 1 1 1 I I 9 B ♦ ,' ___L__- L--- 1___1_.._1 __J___J___J__-- I____I____L _ -_� -__ ',� ♦',� 1 I 1 1 I I_ 1 I 1 1 I 8 , ♦ ♦, I 1 1 1 I _ 1 I I 1 I 1 1 5J ,� ♦ ♦ , ___L --- L --- 1 ♦' 4 ' 3 2 ' 0.0o ds 0 5 8 7 8 8 10 11 12 13 14 15 18 17 18 19 20 Time (hours) \\ CIVILSERVER \civil_r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type// 24-hr 10 -YR Rainfall = 5.38" Prepared by BASS, NIXON & KENNEDY, INC. Page 6 HydroCAD® 8.00 s/n 004300 © 2006 HydroCAD Software Solutions LLC 9/20/2013 5:27 :10 PM Subcatchment 1S: TO BASIN Runoff = 29.82 cfs @ 11.96 hrs, Volume= 1.478 af, Depth> 4.18" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 10 -YR Rainfall = 5.38" Area (sf) CN Description 65,688 80 >75% Grass cover, Good, HSG D 119,191 98 Paved parking & roofs 184,879 92 Weighted Average 65,688 Pervious Area 119,191 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR55 MIN Subcatchment 1S: TO BASIN Hydmgraph 1 12 13 14 15 18 17 18 18 Time (hours) J____L____I___._1____L 1 1 1 1 1 1 i 1 I I 1 1 I I ■Runoff 32 t 1 I 1 I I I I 1 I 1 I 1 29 do 3 ' ( 1 1 1 I 1 I 1 I '10 1 - -- ; - - - -; ---- ; - - - -; - - - -; - -- ; -- ---- ; - - - -; - Type I -Z r;-YR-- 28 ' --- J--- -1--- �---- 1- --- 1- -'-J -- ------- 1- - - -1 -- • -� 28 -- - - - - -; _ainfalt'rv8'r- ------------ ------ - - - - -- - - - - - -- 24 ' 1 I I 1 1 1 _ 7\tiJnoff Arta-784i8TfI;s1'- - - - 1- •1 22 i 1 I 1 1 1 1 I 1 I I I - __IRulO r /tffolal 1 I I 1 I I I 1 v!1 � I �II aT 20 y4M,a I I I 1 1 18 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ; - -- ;- --- _; - - - -; -Runoff D"th�4.1i8 " --- "1-- '- �'---- 1-- --�'---- 1--' -- �- - -- 1- - - - +- -- 18 1 1 I 1 I 1 I 1 I I 1 1 1 __J____L____I____1____I____J_ I____L____L___J__ -�= -0-m1n -- 14 1 I y 1 I I I I 1 1 1 1 I 1 I 1 12 -------------- 1 1 I I 1 I 1 I 1 1 1 D N :F, M - -- ---- r---- r--- t---- r - - -I- -- - r--- r----- ---- I-- - -r - -- --- -t - - -- 10 1 1 1 I 1 1 1 I 1 I 1 1 1 1 1 1 1 I 1 I 1 1 1 1 1 1 1 1 6 I I 1 1 1 I I I 1 1 1 1 1 4 I 1 1 1 I 1 I I I 1 1 I 1 1 1 I 1 I I I I 1 1 1 1 12 13 14 15 18 17 18 18 Time (hours) \ \CIVILSERVER \civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type// 24 -hr 10-YR Rainfall = 5.38" Prepared by BASS, NIXON & KENNEDY, INC. Page 7 HvdroCAD® 8.00 s/n 004300 0 2006 HydroCAD Software Solutions LLC 9/20/2013 5:27 :10 PM Pond 113: 90% TSS WETPOND [82] Warning: Early inflow requires earlier time span Inflow Area = 4.244 ac, Inflow Depth > 4.18" for 10 -YR event Inflow = 29.82 cfs @ 11.96 hrs, Volume= 1.478 of Outflow = 10.18 cfs @ 12.10 hrs, Volume= 1.241 af, Atten= 66 %, Lag= 8.1 min Primary = 10.18 cfs @ 12.10 hrs, Volume= 1.241 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 249.34' @ 12.10 hrs Surf.Area= 12,605 sf Storage= 25,956 cf Plug -Flow detention time= 93.9 min calculated for 1.241 of (84% of inflow) Center -of -Mass det. time= 45.8 min ( 792.3 - 746.5 ) Volume Invert Avail.Storage Storage Description #1 247.00' 34,378 cf Stage /Storage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic -feet) 247.00 8,280 0 0 247.50 10,310 4,648 4,648 248.00 11,010 5,330 9,978 249.00 12,240 11,625 21,603 250.00 13,310 12,775 34,378 Device Routing Invert Outlet Devices #1 Primary 239.40' 12.0" x 75.8' long Culvert RCP, groove end projecting, Ke= 0.200 Outlet Invert= 239.00' S= 0.00537 Cc= 0.900 n= 0.013 #2 Device 1 248.00' 48.0" Horiz. Standpipe Limited to weir flow C=0.600 #3 Device 1 247.00' 1.5" Vert. Orifice C= 0.600 #4 Secondary 249.35' 45.0' long Sharp- Crested Rectangular Weir 2 End Contractions) rimary Outflow Max =10.18 cfs @ 12.10 hrs HW= 249.34' (Free Discharge) T3=0rifice Culvert (Barrel Controls 10.18 cfs @ 12.96 fps) 2-=Standpipe (Passes < 63.71 cfs potential flow) (Passes < 0.09 cfs potential flow) $econdary OutFlow Max =0.00 cfs @ 5.00 hrs HW= 247.00' (Free Discharge) T-4= Sharp - Crested Rectangular Weir ( Controls 0.00 cfs) I \ \CIVILSERVER \civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type// 24-hr 10-YR Rainfall = 5.38" Prepared by BASS, NIXON & KENNEDY, INC. Page 8 HydroCAD® 8.00 s/n 004300 © 2006 HydroCAD Software Solutions LLC 9/2012013 5:27:10 PM Pond 1 P: 90% TSS WETPOND Hydrograph ■ Inflow ie'ei CU I I 11./� I 1 1 I [3 Outflow - e� rea= 4 ac A of tt W-A 4.24 ■ Primary 32 . . ,' ' ' ' ' I 1 1 I I 1 ___L___L___1___1___1___J_ 1 1 I I .J_ ._Leak�e,�g,,4r�__ ■ S000nd 30 28 ,' �i �, �i I 1 1 I 1 I I 1 1 1 1 1 1 I I I 11�I��_I/-�_I____ 1 S`ti raga =45. I .5V (�7/ 28 ' i - - -�- --x---1---1---1 -- -1- I 1 1 I 1 1 -- --1--- -V -- 1 1 I I 1 I I ,' ' ' ' ' .---L --- --- J- - -� - -- 1-------J----'-------- � 1 I i I 1 22 ,' ' ,' I 1 1 1 I 1 I 1 1 1 1 I I -------------------------------- I 1 I I 1 1 I .. 20 ' '' ' • - - -� - --L -- - � 1 1 --------------------------- ,' ,, '' ! ! ! ------ --- - - - - -- v 18 ,• • ,• - - -! - - - 1 --- T---T --- 1 I - - -! 1 - 18 i' . ,' ,' , 1 1-- -1- ---- -� - - -' 1 I I 1 I I - - - -- 1 - - - -1 -I -- ' ' Gale Ort - - - -- -- - - -- - - - - - - - - -- 1 I 1 1 I 1 1 LL 1 I I I 1 Users 12 ' . --- r - - - r - - - T --- T - -- T - - + -- '1--- 1---1----,--- -I' i---i - -- 10 .' .' - -- -- 1 - I I 1 1 1 I I g ' 1 1 I I --- r--- r- -- r-- - r - - - T - 1 1 - - -�- I -1----1----r---r--- 8 ' 4 0.00 eb 0 5 6 T 8 8 10 11 12 13 14 15 18 17 18 18 20 Time (hours) \\ CIVILSERVER \civil_r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type 1124 -hr 100-YR Rainfall= 8.00" Prepared by BASS, NIXON & KENNEDY, INC. Page 9 HydroCAD® 8.00 s/n 004300 0 2006 HydroCAD Software Solutions LLC 9/2012013 5:27:10 PM Subcatchment IS: TO BASIN Runoff = 45.75 cfs @ 11.96 hrs, Volume= 2.325 af, Depth> 6.57" Runoff by SCS TR -20 method, UH =SCS, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Type II 24 -hr 100 -YR Rainfall = 8.00" Area (sf) CN Description 65,688 80 >75% Grass cover, Good, HSG D 119,191 98 Paved parking & roofs 184,879 92 Weighted Average 65,688 Pervious Area 119,191 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, TR66 MIN Subcatchment 1S: TO BASIN 5 6 7 8 9 10 11 12 13 14 15 Time (houm) Hydrograph 50 ' ---''---- 1----'---- 1----'----- 4---- L----'----'---- 1----'�---- 1'- -- "'---- 1- ---- ORUI101( 1 1 1 i 1 1 I 1 1 1 I I I 48 --- �---- r- --- r--- r- - --r--' �8.76cfs ---- r--- r---- r- -- �--- -r--- A--- -t - - -- 46 1 _ _ _ _ _ _ 1 _ _ L Q_ _ -' vvMM 1 1 1 1 1 1 I - -- 1 ii I 124- t _111004-90M-_ 42 i I 1 _1 L I 1 I 1 I JI __ a.. 40 - ------ r-- - - ,- - - - r - - - - I- - - - --- -1---- 1---- '-- --4 ---- '- - - -�-- ----1--pp--'----'----4----1,----4----'L---- 38' - -- ---- T---- r- --T---- i- - - -; -- - -- i- 7�tinof Arba= 184'879Is# - 34 - __J____L____I____1____I____J__ ____I____ 1____L___J____L___J____ 1__ -_ 32 1 1 I I 1 1 1 1 11 1-- -- r -- - -r- - r-- - -r - -- 1 -- ---- 1 I -R-Uh0 1�V0jqT0!! ;43LJia - --J---- L-- --'---- L--- -1- ---J -- -- -'---- _ ..30 28 ___�____T.___ �_— __r ---- ,_ —_— �_ i___— r'RQnaDpthi "_- p G. _______ 24 1 I 1 1 1 1 I 1 I 1 I 1 1 --- ti- --- r---- I---- r---- r - - --+- - - -- I---- r---- r -- -, -- ---J----L----'----L ----'----J- ----'- ---L----'--- �--- l�� L. -mIB -- 22 1 1 I 1 I I 1 1 I I 1 1 20 - -- t- __- r- _-- r--- r-- - -r- -- I- ---- 1---- r- ---r - -- �1►�a A i 18 --- J- -- -L-- -- --- L- - - -1 -- —�— ----- --�---- 1---- J ----�— .1 - 18 1 I I 1 1 1 I I I I 1 1 I ---- 1---- }---- 1--- - +---- I - - - -i- ---- 1---- +------- '�---- I'--- '�--- - + - --- 14 --- J-- - - = --- - - -- --- -' - --- j- - -- J- - -- '- --- -I - - -- ---- '---- ' - - - -.1 I 1 I 1 I 1 1 I 1 11 I I 12 --- I-- -- T---- I---- r- ---1----r ---- 1--- -7- ---11 - --•t- ------ 1--- -7 ---- , 10 - - - - - -- - - - - - -- --- -1 - - -- I - -- - - - - I - - - - �---- - - - -� - - - - - -- - - -- -- J--- -1--- �-- -- 1----I---J — - --- L----L- --�- --- �--- J- ---1---- 6 , 1 1 I 1 1 1 1 1 1 1 1 1 4 - - - + - - -- 5 6 7 8 9 10 11 12 13 14 15 Time (houm) \1CIVILSERVER\civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type 1124 -hr 100 -YR Rainfall = 8.00" Prepared by BASS, NIXON & KENNEDY, INC. Page 10 HydroCAD ®8 00 s/n 004300 © 2006 HydroCAD Software Solutions LLC 9/20/2013 5:27:10 PM Pond 1 P: 90% TSS WETPOND [82] Warning: Early inflow requires earlier time span Inflow Area = 4.244 ac, Inflow Depth > 6.57" for 100 -YR event Inflow = 45.75 cfs @ 11.96 hrs, Volume= 2.325 of Outflow = 40.94 cfs @ 12.02 hrs, Volume= 2.083 af, Atten =11%, Lag= 3.3 min Primary = 10.38 cfs @ 12.02 hrs, Volume= 1.780 of Secondary = 30.56 cfs @ 12.02 hrs, Volume= 0.304 of Routing by Stor -Ind method, Time Span= 5.00 -20.00 hrs, dt= 0.05 hrs Peak Elev= 249.71'@ 12.02 hrs Surf.Area= 12,996 sf Storage= 30,623 cf Plug -Flow detention time= 74.7 min calculated for 2.076 of (89% of inflow) Center -of -Mass det. time= 39.2 min ( 778.7 - 739.5 ) Volume Invert Avail.Storage Storage Description #1 247.00' 34,378 cf Stage /Storage Data (Prismatic) Listed below Elevation Surf.Area Inc.Store Cum.Store (feet) (sq -ft) (cubic -feet) (cubic-feet) 247.00 8,280 0 0 247.50 10,310 4,648 4,648 248.00 11,010 5,330 9,978 249.00 12,240 11,625 21,603 250.00 13,310 12,775 34,378 Device Routing Invert_ Outlet Devices_ #1 Primary 239.40' 120" x 75.8' long Culvert RCP, groove end projecting, Ke= 0.200 Outlet Invert= 239.00' S=0.00537 Cc= 0.900 n=0.013 #2 Device 1 248.00' 48.0" Horiz. Standpipe Limited to weir flow C= 0.600 #3 Device 1 247.00' 1.5" Vert. Orifice C= 0.600 #4 Secondary 249.35' 45.0' long Sharp- Crested Rectangular Weir 2 End Contraction(s) primary OutFlow Max =10.36 cfs @ 12.02 hrs HW= 249.67' (Free Discharge) r Culvert (Barrel Controls 10.36 cfs @ 13.19 fps) 2= Standpipe (Passes < 78.30 cfs potential flow) 3 Oriflce (Passes < 0.10 cfs potential flow) econdary OutFlow Max =27.32 cfs @ 12.02 hrs HW= 249.68' (Free Discharge) Sharp- Crested Rectangular Weir (Weir Controls 27.32 cfs @ 1.87 fps) I \1CIVILSERVER \civil r\2012- 03jobs \1213000R - Powerhouse Church\ Powerhouse Church of Jesus Christ PCoJC - WETPOND ROUTING Type 1124 -hr 100 -YR Rainfall =&00" Prepared by BASS, NIXON & KENNEDY, INC. Page 11 HydroCAD® 8.00 s/n 004300 m 2006 HydroCAD Software Solutions LLC 9/20/2013 5:27:10 PM Pond 1 P: 90% TSS WETPOND Hydrograph ■ Inflow 1 I I I 1 1 1 43.75 de ®OuHlow _ Inflow;Araa= x4.244 ac ■Sll� 50 - 1 --- 4--- 1--- 4--- 1 - - -1- --- 4- - -4 - -- a---- I---- '---- '-- - -I - -- 45 - - -L --- --- - - - - - - - �w_wde ; Peak Elev_=249.7;1' -- ------ - - - - -- - -- 1 I 1 1 I 1 I 1 I 1 I I 1 ' Stoeagle= 30,623 d 1 1 1 1 1 1 1 40 ' ' • 1 I 1 I I 1 I I I 1 1 I I 35 ' - - -1 - - -I - -- }--- }-- -4 - - -4 - -- - - -A - -- -- -1----1----1--- -1 - - -- // I 1 1 1 3066 efe 1 1 1 I 1 1 1 I I 1 1 I 1 1 I I 1 I 1 I t 1 I I 1 1 I 1 I I I I 30 /.---L ; - - -� - - -; - - -i - -- i ; ---- ,------- ,---- ,---- ,- - - -� - - -� - -- 3 25 , I I I 1 I 1 1 I 1 I I I I 20 LL /' 1 1 1 I 1 I 1 1 I 1 I I I / 15 -- -L --- L- -- 1- - -1 - -- -- �------ - -� - -- -�- �-- ' / 1 1 1 I 1 1 1 1 I I I 10 8 9 10 11 12 13 14 15 18 17 18 18 Time (hours) Water Quality Retention Calculations Project Name: Powerhouse Determine Surface Area Required for Permanent Pool: Drainage Area: 4.24 ac Impervious Area: 2.74 ac Percent Impervious: Permanent Pool Elevation: Volume: Surface Area: Hydraulic Depth: SAIDA Required: SAIDA Provided: 64.5% 247.00 (1 /2 way up vegetated shelf) 34,928 of 8,280 sf 5.45 ft (Option 2 Calculation BMP Manual) 2.96% 4.48°/6 Forebay Volume Check: Forebay Volume at Crest of Berm: 4,108 cf Permanent Pool Volume: 34,928 cf Forebay Volume % of Perm. Volume: 11.76% Calculate the Volume Required to Treat the First Flush: Rainfall to Treat: 1 in i i Runoff Coefficient (R„) = 0.05 + 0.009•(% Impervious) Runoff Coefficient (R„ ): 0.63 in/in Runoff Volume (V) = Rainfall' (R„) • (Drainage Area) Runoff Volume (V): 9,710 cf Calculate the Depth Reaulred for the Temporary Pool: Temporary Pool Volume (Required): 9,710 cf Total Volume (Perm. + Temp.): 44,637 cf Temporary Pool Elevation between: 247.50 and 248.00 Temporary Pool Elevation: 247.97 Temporary Pool Depth: 0.97 measured from Permanent Pool Elevation Determine the Orifice Size for 2-6 Dav Drawdown of Temporary Pool: Orifice Invert Elevation: 247.00 Temporary Pool Elevation: 247.97 Orifice Diameter: 1.60 in Use the orifice equation to determine flow and drawdown time: t Orifice Equation: Q = CA(2ghf 6 Volume to Draw Down: 9,710 cf Flow for 2 -Day Drawdown: 0.06 cis Flow for 5 -Day Drawdown: 0.02 cis C: 0.60 g: 32.20 ft/s2 A: 0.01 sf Number of Increments for Orifice Flow. 10 Increments Depth of Temp. Pool from Top of Orifice: 0.85 it Incremental Orifice Flow Drawdown Calculations For TeMD Pool above top of orifice E uations 111 -13 Malcom : Index: Avg Driving Head ft Q (from Orifice E Drawdown Time s Drawdown Time (Days) 0 0.8274 0.0537 15 748.95 0.1823 1 0.7424 0.0509 16 625.97 0.1924 2 0.6574 0.0479 17 667.98 0.2045 3 0.5724 0.0447 18 934.19 0.2191 4 0.4874 0.0413 20 518.54 0.2375 5 0.4024 0.0375 22 581.36 0.2614 6 0.3175 0.0333 25 424.93 0.2943 7 0.2325 0.0285 29 711.04 0.3439 8 0.1475 0.0227 37 301.67 0.4317 91 0.06251 0.01481 57 301.46 0.6632 Total I I I 3.0303 For Temo Pool below too of orifice (Eauations III -13. Malcom): Index: Avg Driving Head (ft) Q (Malcom 111 -13 ) Drawdown Time (s Drawdown Time (Days) 0 0.1250 0.0148 42071.20 0.4869 1 0.0625 0.0052 118995.33 1.3773 Total 1.8642 Drawdown Time: 4.89 days (OK - Drawdown is between 2 and b days) OVERALL BASIN VOLUME ELEV AREA (sfl AVERAGE AREA VOLUME (cf) ACC. VOLUME (cf) STORAGES STAGE (ft) Z AREA (ac) ELEV ELEV STEP (ft) AZ 239.50 2,770 0 0 0 0 0.064 239.50 0.5 240.00 3,050 2,910 1,455 1,455 0.5 0.070 240.00 1 241.00 3,470 3,260 3,260 4,715 1.5 0.080 241.00 1 242.00 3,930 3,700 3,700 8,415 2.5 0.090 242.00 1 243.00 4,410 4,170 4,170 12,585 3.5 0.101 243.00 1 244.00 4,910 4,660 4,660 17,245 4.5 0.113 244.00 1 245.00 SAM 5,175 5,175 22,420 5.5 0.125 245.00 1 246.00 5,990 5,715 5,715 28,135 6.5 0.138 246.00 0.5 246.50 6,450 6,220 3,110 31,245 7 0.148 246.50 0.5 247.00 8,280 7,365 3,683 34,928 7.5 0.190 247.00 0.5 247.50 10,310 9,295 4,648 39,575 8 0.237 247.50 0.5 248.00 11,010 10,660 5,330 44,905 8.5 0.253 248.00 1 249.00 12,240 11,625 11,625 56,530 1 9.5 0.281 249.00 1 250.00 13,310 12,775 12,775 69,305 1 10.5 0.306 250.00 1 1 69,305 1 FOREBAY VOLUME CALCULATION ELEV AREA (sfl AVERAGE AREA VOLUME (cfl VOLUME (cf) STORAGES STAGE (ft) Z AREA (ac) ELEV ELEV STEP (ft) AZ 240.00 120 0 0 0 0 0.003 240.00 1 241.00 230 175 175 175 1 0.005 241.00 1 242.00 340 285 285 460 2 0.008 242.00 1 243.00 480 410 410 870 3 0.011 243.00 1 244.00 630 555 555 1,425 4 0.014 244.00 1 245.00 790 710 710 2,135 5 0.018 245.00 1 246.00 970 880 880 3,015 6 0.022 246.00 0.5 246.50 1,090 1,030 515 3,530 6.5 0.025 246.50 0.5 247.00 1,220 1,155 578 4,108 7 0.028 247.00 1 1 4,108 1 { Table 10 -3 Surface Area to Drainage Area Ratio for Permanent Pool Sizing to achieve 90% TSS Pollutant Removal Efficiency in the Mountain and Piedmont Regions Source: NC DENR Stormwater Best Management Practices, July 2007 Edition (Updated) Routine: 60.0% Permanent Pool De th feet 70.0% % Impervious 3.0 3.5 4.0 4.5 5.0 5.5 6.0 % Impervious 10% 0.90 0.80 0.80 0.70 0.60 0.60 0.50 10% 20% 1.50 1.30 1.10 1.00 1.00 0.90 0.90 20% 30% 1.90 1.80 1.70 1.50 1.40 1.40 1.30 30% 40% 2.50 2.30 2.00 1.90 1.80 1.70 1.60 40% 50% 3.00 2.80 2.50 2.30 2.00 1.90 1.90 50% 60% 3.50 3.20 2.80 2.70 2.50 2.40 2.20 60% 70% 4.00 3.70 3.30 3.10 2.80 2.70 2.50 70% 80% 4.50 4.10 3.80 3.10 3.30 3.00 2.80 80% 90% 5.00 4.50 4.00 3.80 3.50 3.30 3.00 90% Source: NC DENR Stormwater Best Management Practices, July 2007 Edition (Updated) Routine: 60.0% 70.0% 60.0% 70.0% 64.5 °k 64.5% SA/DA @ Hyd Depth @ Hyd Depth @ Hyd Depth @ Hyd Depth @ Hyd Depth @ Hyd Depth @ Hyd Depth Hyd. Depth % Imperv. 5.00 5.00 6.00 6.00 5.00 6.00 5.45 5.45 64.5% 2.8 3.3 2.7 3.1 3.02 2.88 2.96% Average Depth Calculation Project (dame: Powerhouse Permanent Pool Elevation: Surface Area at Perm. Pool: Volume at Perm. Pool: Elevation of Bottom of Shelf: Elevation of Top of Shelf: Surface Area at Top Shelf. Surface Area at Bottom Shelf: Area at Bottom of Pond: Depth (from bottom of shelf to pond bottom): Hydraulic Depth: 247.00 (1/2 way up vegetated shelf) 8,280 sf 34,928 cf 246.50 247.50 6,450 10,310 2,770 7.00 5.45 ft (Option 2 Calculation BMP Manual) MAPS DRAINAGE AREA MAPS USGS MAP WAKE COUNTY SOILS MAP pows1r oun.0 Church of jasua chirlst Revised: September 25, 2013 I: : XV I. �I I _ www. w•wa�rvuu•w ' (q \ / 1 1 1 1./ 1 I 1 _ � xonbowaxa fxaroxaue \ w�aesc@�ors � aro nmxm�ore'"� aPlfJfIG1 — m m ill ,d= zi it % lip WE W V d ¢ plraPRAtLWN Aoc .�w.w..,rwr.raa:...,vnr,�.•.A W tMMaMRfAl,aN arAYltf! vunx ummu BTOa1NVAlO1 §1 3 O ! O = d vuuaaxo _ Fvm IL (j u�ra w x sut 1 i 814' CITY OF RALEIGH PROJECT NO. )0(-XX -)O( ' —w _vt i�� l •^ _v rvt... +rrsa :�.. -+v_ _: _ . :v� © © ©0 u IiAO���YLLtb:d I IIm © 'W�0 o1 1LQlMC4b ® E E-a r ✓, " I {I —1 I I tl ' I IF ': �- ��?�r 'K•` 111 \ \����� 1� ! usny� \ 1 U g � «�g8e�3f�e�ifz r1 It t i }; \1' I ; �M�07cYBt10Ll CIW1tA W lCOd �O�B- OC�Ll4mRNDYP•uq�anYMM • tl000C1E11t�EWC+ F�Ny4CW11 3 1 ! y I I I � � � - -- — - - - - - -- — �\ � — - -_ � t r� ❑ _ -` ice\ - -_;��' ���� _r^�`�`�: = --vim == �'•,f�;7' _ - � _ .� 1 � lM1l r I \�1 Pi C ACI � es (1 1 li Ill 4.2 a -� - - - - - 1 1�i11 6 3 ii i i I � \l l\ 11 il• J I N ic N110 us , ' �� xulc numlamuellan oemmwreraew�000rmarrce Clale' wlnlnuAc1mMv aucaoarf. Gtl•OV Mtno)I. Ym s .. - — m ._ ... r $ mue9B aYEaRIa OFlEnBm1118 wV0T m.1YUlD8IYm Y„fl ermrxn>Iwa - - — CITY OF RALEIGH PROJECT NO. 8 PJB 13 Convrinh11C11997 ManIerh Inn 78° 36' 0.00" Vy 178-35- 0.00" Vy )0.00" VY o A .:. /, tN — I� n { ,,,p i r r� .J . 1. ar �s - y� . „ 1 r to Tn t� � • ��t _- � r Itu7n • I ,�jt s° • ' M 1 o O ) ' —F � r� .'` -•�.� _ Jpp `•� �_ Vim. 1 O to Cl) C3 ag elic ecli alio ��, - J `� y - M g •. -_ ° �°. <_ ' �I -- •` , .9�.... / ' n�`d p• . vice Q �� r � N ... ,� .. t • , SCALE 1:24000 0 1 MILES 0 1000 YARDS 0 1 IOLOMETER j nar 78° 36' 0.00" V 78° 35' 0.00" 78° 34' 0.00" Name: RALEIGH EAST Location: 0350 49'39.87" N 078° 35' 18,13" W NAD 27 Date: 8/25/2013 Caption: POWERHOUSE CHURCH OF JESUS CHRIST Scale: 1 inch equals 2000 feet Convrinh11C11997 ManIerh Inn 40 WAKE C011NTV NnRTH CARnI1NA -- CIJFPT N116AnFW na 49 N (20 C.- BASS, NIXON & KENNEDY, INC., CONSULTING ENGINEERS 6310 CHAPEL HILL ROAD, SUITE 2509 RALEIGH, NC 27607 PHONE 919.851 A4221800.354.1879 ■ FAX 919.851.8968 Powerhouse Church of Jesus Christ BMP Operation and Malntenance Manual 3411 Pine Knoll Drive Raleigh, North Carolina Responsible Party: Landmark Construction & Development, Inc. 230 Capcom Avenue, Suite 100 Wake Forest, NC 27587 (919) 556 -5155 Prepared by: Danny L. Howell, Jr., PE October 1, 2013 PROJECT SUMMARY The existing 278,620 -sf (6.40 -ac) project site is currently vacant, and is located at 3411 Pine Knoll Drive, Raleigh, North Carolina. SITE I Email Danny.Howell @BNKinc.com Page 1 of 8 Web www.BNKinc.com Powerhouse Church of Jesus Christ (BNK No. 03- 12130) October 1. 2013 A 20,530 -sf church is proposed with associated parking, sidewalks and drive, totaling 100,357 -sf of proposed impervious area. The project also includes the connection of a 41' b -b street section of Pine Knoll Drive, including the addition of a 5-ft wide concrete sidewalk. `7_, a i -, M � T, o.d [l� Initially, a portion of the site currently drains from to an existing pond in the northwest comer of the property, and the rest of the site drains to the southwest comer of the property. A wetpond is proposed to both detain the 2 and 10-yr, 24-hr design storms as well as reduce the nitrogen export from the site. The wetpond also provides 90% TSS removal from the runoff associated with the project. The wetpond has a drainage area of 184,879 -sf, of which 119,191 -sf is impervious area. Email Danny.Howell @BNKinc.com Page 2 of 8 Web www.BNKinc.com Powerhouse Church of Jesus Christ (BNK No. 03- 12130) October 1. 2013 TRASH RACK WITH 2x3 ACCESS K%TCH CENTERED ON STEPS. PLASTIC P 49 APPRO&EOUAL) VALVE STEM AND WHEEL MOUNTED ON SIDE OF MANHOLE PER MANUFACTURER 49.00 2' FAIRCLOTN SIOMMER OR ATTACHED DURING M&UCTION. SON ° GATE VALVE OPEN DURING CONSTRUCTION 8' LATE VALVE 75.84 LF 12' RCP • O.S37i 239. PROVIDE ANTE —SEEP b 239.50 CMLA7S AT EA JOINT 12CONCRE�IE� IMPERMEABLE CLAY LINER TO BE �� ON OUTLET PIPE � WE PON�/FOREBAY� DEEP OUTLET STRUCTURE #2 DETAIL 8 wAsHm sTDNE NOT TO SCALE METHODOLOGY The methodology used to determine the pre and post - developed outflows from this project was the TR -55 method for runoff estimation, using the 2 and 10 -year design storms. The TR -55 minimum Tc, 6-minutes, was used for the calculation of the pre and post - development outflows. Investigation into the types of soils on this project site, per the USDA Wake County Soils Survey, indicates that they are Type D soils, and therefore the corresponding SCS Curve Numbers were used in this study. Email Danny.Howell @BNKinc.com Page 3 of 8 Web www.BNKinc.com Powerhouse Church of Jesus Christ (BNK No. 03- 12130) October 1, 2013 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): does ® does not incorporate a vegetated filter at the outle. This system (check one): does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than lA inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMW element: Potential problem: How I will remediate the probleur. The entire BMP Trash debris is present. Remove the trash debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one -time fertilizer application. rVege'tation is too short or too Maintain vegetation at a height of a roximately six inches. Email Danny.Howell @BNKinc.com Page 4 of 8 Web www.BNKinc.com Powerhouse Church of Jesus Christ (BNK No. 03- 12130) October 1. 2013 WET POND INSPECTION CHECKLIST Date: Time: (Project Name): Powerhouse Church of Jesus Christ Wet Detention Pond # 1 Raleigh, NC SPILLWAYS — DRAINS — OUTLETS Check/Circle Condition Noted Observations Action — Repair Action — Monitor Action — Investigative Principal Spillway Type: Trash Racks/Debris/ Rust/Deterioration Cracks/Detedoration Joint Deterioration Improper Alignment Cracks/Deterioration Seepage/Piping Undercutting Erosion Debris Pond Drain /Other Outlets Gates/Velves Type: Operability Rip Rap General Comments, Sketches & Field Measurements Email Danny.Howell @BNKinc.com Page 5 of 8 Web www.BNKinc.com Powerhouse Church of Jesus Christ (BNK No. 03- 12130) October 1, 2013 PEROODIC INSPECTION, OPERATION & MAINTENANCE RECORDS (Project Name): Powerhouse Church of Jesus Christ Wet Detention Pond # 1 Raleigh, NC Date Time Rain Pool Weather General Recorded By Level Conditions Observations or Comments Datie Maintenanoe Comments Recorded By Performed Date Equipment Comments Recorded Operated By Email Danny.Howell @BNKinc.com Page 7 of 8 Web www.BNKinc.com Powerhouse Church of Jesus Christ (BNK No. 03- 12130) October 1, 2013 ESTIMATED BMP CONSTRUCTION COST ** BMP Structures $19,164.00 BMP Grading/Stabilization $19,444.00 TOTAL BMP CONSTRUCTION COST $38,608.00 * 24% OF BMP CONSTRUCTION COST S 9265.92 * This amount due to the City of Raleigh prior to the issuance of building permits ** BMP structures includes RCP outlet pipe and structure, valve stem & wheel, trash rack, rip-rap apron Email Danny.Howell @BNKinc.com Page 8 of 8 Web www.BNKinc.com Soil & Environmental Consultants, PA 11010 Raves Up Road • RaldA Nor& CwMn 27614 • Ftiona (919) 846.5900 • Fax: (919) 8464467 www.880=.OM September 20, 2013 Job # 9715.S1 Landmark Construction and Development Attn: Mike Marguerat 231 Capcom Ave. Suite 100 Wake Forest, NC 27587 Re: Detailed storm water soils evaluation for the proposed storm water wet pond at 3411 Pine Knoll Drive, Raleigh, NC. Dear Mr. Marguerat: Soil & Environmental Consultants, PA (S &EC) performed a detailed soil evaluation within the targeted area of the potential storm water wet pond on the site mentioned above. The purpose of this evaluation was to provide additional information for the proper design of the proposed storm water wet pond, used as a BMP to treat the on -site storm water. As indicated on the attached map, soil morphological profile descriptions were performed at the specified locations to determine depth to seasonal high water table (SHWT). The following is a brief report of the methods utilized in this evaluation and the results obtained. Soll/Site Evaluation Methodoloev The site evaluation was performed by advancing hand auger borings to sufficient depths to estimate seasonal high water table. S&EC navigated to the storm water device location with a GPS receiver to describe soil morphological conditions at the boring locations using standard techniques outlined in the "Field Book for Describing and Sampling Soils" published by the Natural Resources Conservation Service (NRCS, 2002). SoiUSite Conditions This site is located in the Piedmont Acid Crystalline geological area consisting of metamorphic rock parent materials. Field investigation revealed that the borings were similar to the Helena soil series (Fine, mixed, semiactive thermic aquic Hapludult). Soil borings were advanced approximately 10' from top of ground. S&EC encountered seasonal high water table conditions at approximate elevation 244.75'. Soil & Environmental Consultants, PA is pleased to be of service in this matter and we look forward to assisting in the successful completion of the project. If requested, S &EC can meet on -site with NC -DWQ to discuss our findings and recommendations. Please feel fine to call with any questions or comments. Sincerely, Soil & Environmental Consultants, PA Ricky Pontello NC Licensed Soil Scientist #1232