Loading...
HomeMy WebLinkAbout20120129 Ver 1_DCM Permit_20120330Permit Class Permit Number NE' V 53 -12 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A -118 Excavation and/or filling pursuant to NCGS 113 -229 Issued to Sunset Grill & Water Sports c/o John Kotch 184 Sea Oats Lane Southern Shores NC 27949 Authorizing development in Dare County at Currituck Sound, 1264 Duck Road, as requested in the permittee's application dated 12/7/11. includin,p the attached worknlan drawings (I), dated revised 12/14/11 This permit, issued on Mmy 15, 2012 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may De suoject to tines, imprisonment or civil action; or may cause the permit to be null and void. Dockine and Mooring Facility 1) Unless specifically altered herein, this permit authorizes the docks, piers, mooring buoys, platforms and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this expanded docking facility without permit modification. No non -water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the expanded docking facility. Any sewage discharge at the expanded docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2015 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DENR and the Chairman of the Coastal Resources Commission. Braxton M5avis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Sunset Grill & Water Sports c/o John Kotch Permit #5342 Page 2 of 4 ADDITIONAL CONDITIONS 3) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor. 4) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 6) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 8) The moorings shall be marked or colored in compliance with all appropriate U.S. Coast Guard and/or N.C. Wildlife Resources Commission requirements. The required markings shall be maintained for the life of the moorings. 9) The existing 7 mooring buoys shall be removed prior to the installation and occupancy of the permitted moorings. 10) The type of material used to create the mooring must be free of pollutants and of a design and type of material so as to not present a hazard to navigation or public safety. 11) There shall be no more than 16 mooring buoys and 6 formalized boatslips in association with this expanded docking facility. Protection of Shellfish Resources 12) This permit authorizes a maximum of 22 boat slips. At no time shall more than 22 vessels be moored or docked at this facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft. 13) No vessels greater than 24 feet in length, or vessels with cabins or heads shall use the dockage area. Sunset Grill & Water Sports c/o John Kotch Permit #53 -12 Page 3 of 4 ADDITIONAL CONDITIONS 14) An permittee shall report on a quarterly basis to the Division of Marine Fisheries, Shellfish Sanitation and Recreational Water Section (SSRWQ) the following information: a. The current number of slips b. The number of length of all boats using the facility c. The number of length of boats with cabins d. The number of boats with heads e. The number of boats with "porta- potties" NOTE: Failure to provide the required reports in a timely manner may result in a violation of this permit. 15) The construction and/or operation of the authorized facilities shall not directly result in any closure of any waters that are open to the taking of shellfish. Any such closure directly attributable to the marina facility shall require that the permittee undertake remedial actions to remedy the situation. Such actions may include, but are not limited to, a removal of any unauthorized slips or mitigative measures to reduce or eliminate the cause(s) of the closure. Easement 16) An Easement from the Department of Administration's State Property Office may be required under N.C.G.S. 146- 12(e). The permittee shall contact the State Property Office at 919 - 807 -4650 prior to the initiation of construction of any structures over state -owned submerged lands to determine if such an easement will be required. Any required easements shall be obtained, and a copy provided to the Division of Coastal Management at 400 Commerce Avenue, Morehead City, NC 28557, prior to construction of any new boat slips or other docking facilities authorized under this permit. General 17) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 18) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 19) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. Sunset Grill & Water Sports c/o John Kotch Permit #53 -13 Page 4 of 4 ADDITIONAL CONDITIONS NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264 -3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under DWQ Project No. 12 -0129. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW -2012- 00278, which was issued on 5/15/12.