Loading...
HomeMy WebLinkAboutNC0026913_authorization to construct_19880202State of North Carolina Department of Natural- Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611, _. James G. Martin, Governor ::. ' r: R. Paul Wilms S. Thomas Rhodes, Secretary February 2, 1988;:f";°. Director Honorable John H. Miller, Mayor Town of Sparta P. 0. Box 99 Sparta, North Carolina 28675 SUBJECT: Permit No. NC0026913 Authorization to Construct Town of Sparta Wastewater Treatment Facilities EPA Project No. C370771-01 Alleghany County Dear Mayor Miller: The final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the upgrading of the existing 250,000 GPD wastewater treatment facility with no increase in treatment capacity to consist of a new manual bar screen, a new influent pump station with dual 350 GPM vertical vacuum prime pumps and a high water level alarm; conversion of the existing treatment process from contact stabilization to extended aeration; upgrade of existing clarifier including drive, lower bearing and regrouting; a new sludge pump station with dual 180 GPM vertical vacuum prime pumps, a high water level alarm, and magnetic flow meter; a 150,000 gallon aerobic digester (either a two (2) compartment tank with aeration or a single compartment tank with a removable aeration system); four (4) 420 CFM blowers with a 196 square foot pole shed, a chlorine contact chamber with "v" notch weir and recording flow meter, new conventional sludge drying beds with 1,625 square feet of surface area, site work, electrical work, yard pipe and associated appurtenances. Prior to operation of the temporary unit bypasses, the Town must advise the Winston-Salem Regional Office Supervisor when the bypass operation will start. Upon completion of construction, all bypasses, both new and existing, must be permanently piugged. Operation of the digester as a batch reactor shall not exceed two (2) weeks. Pollution Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer • Do not proceed with construction until the Authorization -to -Award package, EEO, and MBE documentation/certification have been reviewed, and you are in receipt of our approval, if Federal funding is desired for project construction. The permittee shall employ an actively State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State Certificate of • the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charge of the new facilities, it is required that this be done by the time the construction of the facilities is 50% complete. The Authorization -to -Construct is issued in accordance with Part III, Paragraph C of NPDES Permit No. NC0026913, issued September 26, 1985 and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the approved plans, specifications, and supporting documents; and are in compliance with the conditions and limitations specified in Permit No. NC0026913. The permittee shall have an acceptable sludge analysis and a sludge E.P. toxicity analysis which have been approved by the Division of Health Services, Solid Waste Management Branch prior to the disposal of any sludge from the new wastewater treatment plant. Copies of the analyses, supporting documents, and approvals shall be submitted to the Division of Environmental Management's Water Quality Section and the Winston-Salem Regional Office. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. Prior approval must be obtained from the Division of Environmental Management's Winston-Salem Regional Office for any bypassing. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. The disposing, selling or free distribution of wet, dried, composted sludge or sludge -like materials from wastewater facilities without prior review and approval by this Division is illegal. One (1) set of final approved plans and specifications is to be forwarded to you, one (1) set to the Environmental Protection Agency (EPA), and one (1) set to the Corps of Engineers. If you have any questions or need additional information, please contact Mr. Bill Hoffman, at (919) 733-6900. Sincerely, CM:vk cc: Municipal Engineering, P.A. Mr. Walter-D. Taft Mr. Arthur Mouberry COE - Charlotte EPA Mr. Bobby Blowe Ms. Brenda Chesson Mr. W. S. Hoffman Mr. Cecil Madden Mr. John Campbell EMU GPF