Loading...
HomeMy WebLinkAbout20190178 Ver 1_Compliance Evaluation Inspection_20211109Wetland Inspection Report Inspection Type: Reason for Inspection: Inspection Date: Site Owner Name: Latitude: County: Project Name: Project Num: Location: SW Plan Location: 20190178 NCDOT - Replace Bridge 29 on SR 1475 Macon NCDOT - Replace Bridge 29 on SR 1475 NC DOT Division 14 - Sylva 11/8/2021 Routine Site Inspection (DOT) Version: 1 Status:Issued Project Type:Replace bridge with bridge Region:Asheville Longitude:-83° 36' 55''+35° 13' 16'' Inspection Contact Person:Title:Phone: On-Site Representative(s): Secondary Inspector(s): Primary Inspector:Phone:Robert K Mitchell Facility Compliance Status:Compliant Not Compliant Question Areas: Program Areas:401 (includes isolated/non-404) Permit (401 WQC) Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on November 8, 2021. Derek Scruggs was present during the inspection. The following are items that need attention: - Station L 10+50 - Exposed soil needs to be stabilized on rip rap and downstream of rip rap. (Minor amount) - Station L 14+00 R - Temporary bridge is under construction. Spoils adjacent to JS need to be removed and stabilized at the end of the work day. This was discussed with the inspector. NPDES records are up to date. Site is compliant with the 401 Water Quality Certification. Inspection Summary: page:1 Inspection Date: Site Number: Inspection Type: Owner: Reason for Visit: 20190178 11/8/2021 Blazer, Keith Site Inspection (DOT)Routine Permit (401 WQC)Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Site 2 Station L 10+50 - Aluminum arch culvert and rip rap have been installed.Comment: page:2