HomeMy WebLinkAbout20190210 Ver 2_Compliance Evaluation Inspection_20211109Wetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190210
NCDOT - NC 69 Widening (A-0011C)
Clay
NCDOT - NC 69 Widening (A-0011C)
NC DOT Division 14 - Sylva
11/8/2021
Routine
Site Inspection (DOT)
Version: 2 Status:Issued
Project Type:Road/Highway Widening
Region:Asheville
Longitude:-83° 49' 32''+35° 00'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted on November 8, 2021 by Kevin Mitchell with the Asheville Regional Office. Reid
Whitehead and Nick Adams were present during the inspection. Site is compliant with the 401 Water Quality
Certification. The following are items that need attention:
- Station L 68+00 LT - Additional groundcover is needed to meet NPDES grouncover requirements.
- Station L 201+00-202+00 - Add silt fence adjacent to JS and at toe of slope.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190210
11/8/2021
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Culvert work is still in progress at Site 15 (Station L 187+00).Comment:
page:2