Loading...
HomeMy WebLinkAbout20161220 Ver 2_USACE Correspondence_20190916 (2) Carpenter,Kristi From:Steve Kichefski Sent:Monday, September 16, 2019 1:58 PM To:Turchy, Michael A; Hood, Donna Cc:Chapman, Amy; Braspennickx, Nicholle M CIV USARMY CESAW (US); Wyatt, Jeffrey L; Beam, Patricia; Barrett, William A; Morgan, Stephen R; Anderson, Brook E; Berry, Michelle G; Dagnino, Carla S; Carpenter, Larry S; Matthews, Monte K CIV USARMY CESAW (USA) Subject:RE: I-5000 Michael, Thank you for the update. That answers some questions about our most timely concerns regarding the reduced culvert conveyance. It seems that with the accumulated sediment levels within the culvert not being calculated CLOMAR factors (despite the reality of the sediments presence) and the CLOMAR partially based on the base flood reduction due to the Rankin Lake Road bridge removal (which has not yet happened) there is still some room for concern until construction is complete, but I appreciate having NCDOT's written response to this issue. As discussed prior to permitting and again during our August 22, 2019 meeting, the USACE expects the project to meet GP31 special condition (i), which is copied below: i. No activity may result in substantial permanent disruption of the movement of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area. The dimension, pattern, and profile of the stream above and below a pipe or culvert should not be modified by widening the stream channel or by reducing the depth of the stream in connection with the construction activity. It is acceptable to use rock vanes at culvert outlets to ensure, enhance, or maintain aquatic passage. Pre-formed scour holes are acceptable when designed for velocity reduction. The width, height, and gradient of a proposed opening should be such as to pass the average historical low flow and spring flow without adversely altering flow velocity. Spring flow should be determined from gauge data, if available. In the absence of such data, bankfull flow can be used as a comparable level. Where adjacent floodplain is available, flows exceeding bank-full should be accommodated by installing culverts at the floodplain elevation, if practicable. If multiple culverts are used, the construction of floodplain benches and/or sills to maintain base flow is required, if practicable. Meeting this condition was the intent of adding the sills and benching since the channel flow was spread across 3 box culverts, especially with the volume of sediment received by this channel from the upstream watershed. It was also thought that concentrating flow in 1 culvert barrel would help flush the deposited sediment and maintain a low flow channel or channel thalweg after the Rankin Lake Road bridge removal. Is there any reason why NCDOT believes this is incorrect or not attainable at this point? In the response provided and during the August 22, 2019 discussion, the sills are proposed to be increased from 2 to 3 feet in height in order to help attain more natural channel dimension in this area, however isn't this still level with the projected channel substrate height post Rankin Lake Road bridge removal/sediment flushing? If yes, then is the increased channel velocity discussed thru via the modeling the only thing projected to maintain the single barrel use and low flow channel dimensions? I realized you may not be able to answer this until you can answer the remaining unresolved issues and provide us with your proposed plan modifications for this area. I just want to reiterate that prior to moving forward with construction of any modifications we would like to review and comment on that response. It may even mean that the sill elevation is not needed. 1 All the questions above and really the main issue with this area prior to permitting involve the timing of the Rankin Lake Road bridge removal. The uncertainty around how the channel will respond after the bridge removal and what steps are needed to meet condition (i) mentioned above cannot be concluded until that happens. What is the bridge removal waiting for, is it the opening of bulb avenue or construction access for other project components? If it is for construction access, is there another way to access the area and did the previous construction phases limit the access to the area needed via the bridge? As a reminder, the special condition below was included with the permit verification for this project: 2) The stream channel (Highland Creek) within the project area between the I-85 culvert extension (Site 1) and the rock check dam downstream of the Rankin Lake Road Bridge (Site 3) shall be visually monitored with photo stations for at least two bankfull flow events occurring in separate calendar years to ensure channel stability post construction. Since the crucial step of the Rankin Lake Road bridge removal not happening early in the project phasing, this condition was included to make sure that this area is monitored and not just forgotten after construction. The site monitoring results are to be reported to us at least annually to help us determine if the channel adjusts as proposed by the NCDOT in order to meet permit conditions and ensure that no other channel stability issues occur as a result of the project. I welcome any other measurements NCDOT suggests to help demonstrate that the channel is adjusting as proposed, such as fixed cross-section measurement points, post construction thalweg surveys or even bank pins safely installed in the channel bed to quantify elevation change. Thinking through the monitoring and installing any fixed measurement points (at least the photo station points) would be best done prior to the bridge removal for reference. I appreciate all the modeling and other work that has gone into more thoroughly addressing our concerns with this project. I'm sure all involved would like to see this issue concluded and I trust that the remaining responses will not take another 5.5 months to answer. Let me know if you have any questions regarding my response or would like to have further discussions. Regards, Steve Kichefski Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District, Asheville Field Office 151 Patton Avenue, Suite 208 Asheville, NC 28801 (828)-271-7980 Ext. 4234 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at https://urldefense.com/v3/__http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0__;!!HYmSToo!PJ59wnJOaHN1t4R A3ytgavG-JFNjoHWYSjWFa0VZehtHUOHnZCnQRKUE3P5V1xKaeV4$ to complete the survey online. -----Original Message----- From: Turchy, Michael A \[mailto:maturchy@ncdot.gov\] Sent: Monday, September 16, 2019 12:08 AM To: Hood, Donna <donna.hood@ncdenr.gov>; Kichefski, Steven L CIV USARMY CESAW (US) <Steven.L.Kichefski@usace.army.mil> 2 Cc: Chapman, Amy <amy.chapman@ncdenr.gov>; Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil>; Wyatt, Jefffrey L <jlwyatt@ncdot.gov>; Beam, Patricia <pdbeam@ncdot.gov>; Barrett, William A <wabarrett@ncdot.gov>; Morgan, Stephen R <smorgan@ncdot.gov>; Anderson, Brook E <beanderson1@ncdot.gov>; Berry, Michelle G <mgberry@ncdot.gov>; Dagnino, Carla S <cdagnino@ncdot.gov>; Carpenter, Larry S <lcarpenter@ncdot.gov> Subject: \[Non-DoD Source\] Re: I-5000 Please find attached responses to the March/April DWR and USACE concerns. While some questions/comments are still unresolved, we attempted to provide a history, status, and/or update to document the activities that have occurred since the requests. Pursuant to the August 22 update and modeling meeting, additional coordination will continue as NCDOT is working to refine the recommendations to determine which actions are practicable and appropriate to help improve the situation at Site 1. Please let me know if you have any questions. Thanks, Michael Michael Turchy Environmental Coordination and Permitting North Carolina Department of Transportation 919 789-1102 <tel:(919)%20789-1102> mobile 919 707-6157 <tel:(919)%20707-6157> office 1598 Mail Service Center Raleigh, NC 27699-1598 1000 Birch Ridge Drive Raleigh, NC 27610 ________________________________ From: Turchy, Michael A Sent: Thursday, September 12, 2019 5:12 PM 3 To: Hood, Donna <donna.hood@ncdenr.gov>; Dagnino, Carla S <cdagnino@ncdot.gov> Cc: Chapman, Amy <amy.chapman@ncdenr.gov>; Steve Kichefski <Steven.l.kichefski@usace.army.mil>; Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil>; Wyatt, Jefffrey L <jlwyatt@ncdot.gov> Subject: RE: I-5000 Yes. The team is working on answering some of the outstanding questions from the meeting (e.g. depth to waterline, etc). However, I've requested everyone to send me what they have so I can provide a response by COB Friday. -Michael From: Hood, Donna <donna.hood@ncdenr.gov> Sent: Thursday, September 12, 2019 11:32 AM To: Dagnino, Carla S <cdagnino@ncdot.gov>; Turchy, Michael A <maturchy@ncdot.gov> Cc: Chapman, Amy <amy.chapman@ncdenr.gov>; Steve Kichefski <Steven.l.kichefski@usace.army.mil>; Braspennickx, Nicholle M CIV USARMY CESAW (US) <Nicholle.M.Braspennickx@usace.army.mil>; Wyatt, Jefffrey L <jlwyatt@ncdot.gov> Subject: I-5000 Carla and Michael, Is there going to be a written response the ACOE and NC DWR concerns for the I-5000 project? Thank You, Donna Donna Hood - Donna.Hood@ncdenr.gov <mailto:Donna.Hood@ncdenr.gov> North Carolina Dept. of Environmental Quality Division of Water Resources Transportation Permitting Branch 610 E. Center Ave. Mooresville, NC 28115 Ph: 704.663.1699 Cell: 704.682.2839 4 Fax: 704.663.6040 ________________________________ Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 5