HomeMy WebLinkAbout20061919 Ver 1_Approval Letter_20070711Michael F. Easley, Governor
North Carolina De W'h'am G. Ross Jr., Secretary
partrnent of Environment and Natural Resources
Colleen Sullins, Director
Division of Water Quality
July 11, 2007
Jeffery Tarantino
8107 Seaview Drive
Chesterfield, VA 23838-5109
Subject Property: 115 Nonsuch Lane
Merritt, NC 28556
Neuse River Basin
DWQ Project # 2001919
Pamlico County
Approval of Neuse River Riparian Buffer Protection Rules Minor Variance [15A NCAC 2B .0
233 (9)(b)]
Deaz Mr. Tazantino:
You have our approval, in accordance with the conditions listed below, to im act 1147
to Zone II of the protected riparian buffers for the p square feet of impact
property as described within your application dated December 4, 2006,tiand rece ved in ~ decks on the subject
2007. This letter shall act as your Minor Variance approval as described within 1 SA NCAC 2 11 on February 1 S,
you should get any other required federal, state or local permits before you proceed with ()( )
(but not limited to) Sediment and Erosion Control and CAMA B •0233 9 b . In addition,
from the date of this letter. permits. This approval shall a pi~een five yarn
This approval is for the purpose and design that you described in your variance re uest.
project, you must notify us and you may be required to send us a new request fora rov
sold, the new owner must be given a copy of this a royal an q If you change your
complying with all conditions. This approval requires ou to pp al. If the property is
pP d plat thereby assuming responsible for
Y follow the conditions listed below.
The Additional Conditions of the Certifrcation are:
1. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or a
Rules, and any subsequent modifications, the applicant is required to return the attachedplicable Buffer
completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 943 Wash ificate of
Square Mall, Washington, NC 27889. ington
2. Diffuse Flow
All new storrnwater drainage shall be directed to vegetated areas as diffuse flow at no -
velocities prior to entering the protected riparian buffers as identified within 15A NC n erosive
No new ditching or piping of stormwater through the protected buffers is allowed AC 2B .0233(5).
orth Carolina niv~~~,,,, ,,F~:,...__ „
13 Washington Square Mall ...~~ ~uairy Internet www,ncwaterguality ore
Washington, NC 27889 Phone: 252-946-6481
FAX 252-946-9215
Equal Opportunity/Affirmative Action Employer - 50°~ Recycledll0% Post Consumer Paper
Non1 thCarolina
~aturallr~
3. Buffer Mitigation (EEP/Restoration)
You are required to mitigate for Zone II impacts to the protecto s uare feet as required under this vazilangetion
to compensate for impacts to the protected riparian buffers is 1 q
approval and 15A NCAC 2B .0242.You may make a pa~enEtEPt to meat hiss mB gat on requirement~This has
administered by the NC Ecosystem Enhancement Progr ( )
been determined by the DWQ to be a suitable method to meeensato itimait gat onurequ~rements underal SA NCAC
15A NCAC 2B .0242, this contribution will satisfy our comp rY _
2B .0233(9)(b). Until the EEP receives and cleazs your chec vaI shal occurle The,EEPhould be contacted atment
Program Office), no impacts specified in this variance appr ent into the EEP. For accounting purposes, this
(919) 715-0476 if you have any questions concerning paym _
variance approval authorizes payment into the Riparian B ~ f~ of strot ct d riparian buffers 03 04 10, 27-
ft2 of required riparian buffer mitigation for impacts to 114 p
141-3 river and subbasin:'
The DWQ will accept an alternative method of mitigatioSA(iNCAC 0 Bt.0242) to sat sfy this mit gat on n or
Enhancement) pursuant to the Buffer Mitigation Rule (1
re uirement. If you choose to pursue this option, then you are required to submit in writing a mitigaton plan to
q
the DWQ Wetlands/401 Unit/ Washington Regional Office ri az~ian buffe razes. Forr mlorelanformatoncplease
proposal to plant native species of hardwood trees with m p
contact this office. If you choose to pursue this option, no impacts shall occur to the protected buffers until the
mitigation plan is approved by the DWQ•
If ou do not accept any of the conditions of this approval, yo Dina hearinor ann aaJvuvrditten pet i nlthat conforms tot
Y
within 60 days of the date that you receive this letter. To ask g
Cha ter 150B of the North Carolina General Statutes to the Office oa a final land binding un ess you7ask forts hearing.
P
Center, Raleigh, NC 27699-6714. This approval and its con rtions
is letter coin letes the review of the Division of Water Quality under3920 f ou have any queBstions ororequ~e opies
Th p
(15A NCAC 2B .0233 (9)(b)). Please contact Chris Pullinger at 252 94 Y
of our rules or procedural materials.
Sincerely,
Al Ho ge Supervisor
Division of Water Quality
Surface Water Protection
Washington Regional Office
Enclosures: Certificate of Completion
Plat (drawing of impacts)
cc: DWQ WaRO Regional Office
DWQ Central Office, Ian McMillan
Central Files
Pamlico County Building Inspections
CAMA Morehead City
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Coleen H. Sullins, Director
Division of Water Quality
DWQ Project No.:
Applicant:
Project. Name:
Date of Issuance of 401
Water Quality Certification:
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate to the
401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, ,hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
Agent's Certification
I, ,hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to
be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized
to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state
that, to the best of my abilities, due care and diligence was used in the observation of the construction
such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other
supporting materials.
Signature Registration No.
Date
*~
NCDEf~ ~:
County:
North Carolina Division of Water Quality, 401 Wetlands Certification Unit,
1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address)
2321 Crabtree Blvd., Raleigh, NC 27604-2260 (Location)
919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enr.state.nc.us/ncwetlands/
W N N -
~ ~ ZZ ~ ~
my m . N ~ n •-
~~ ~ ~ ~
m ~ -- o
~, ~' m z
~„ ~,
A ~ ~
^~ ~ f*1 D m
:m. ~~ mO ~
3 5. ~
~~,~ Om m
^^ o ~ ~ r m
fr~.~li ~ ~ 7 ~ ~ Z
b ~J~' v0 -<
~ p "U
~~~S ~ m O
-o
~tiG' ~^ w o voi
,,r. _' ~ v
~ ~
~^ ~ ~S ~ ~
~ ~
~ ~
~ ~~ F` o
~~ ~ .A 6
<~ % ~cr~~ -~ o z
c~ ~ \ ~ XS O
/\~ \ ./ ~
`S's d ~~ ~ ~~ i° ~ ~ 40~ 2`S- Oo
~ j-. \ ~s0• ~ O
o ~. ~ti~. \
o ~~~ \ \
/ ~ o
o
/ J,
~ ~~.
~ o ~,9.
oo,°o:
r `~p~o~
2~~~
O
2 ~~~ \ ~ m
~~ ~
~ ~~ ~~ EXISTING GRAVEL
~G
F~
0
-P 00
v~
~ ~ D
„ ~ rZl
A