Loading...
HomeMy WebLinkAbout20211622 Ver 1_Shoreline Stabilization_20211108Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * Owner Information: Name: * Email: * Phone Number: * Mailing Address:* kim@lyfemarine.com Please provide an email address for payment and requests for more information here. Lori Mehen/David Brooks 93usna@gmail.com (919)579-9828 (xxx)xxx-xxxx Street Address 242 Shoreline Loop Address Line 2 City Mooresville Postal / Zip Code 28117-7452 Is there an agent working on the project?* - Yes O No Agent/Consultant Information ................................................................................................... Name: * Company Affiliation: Email: * Phone Number:* Randy Jordan Lyfe Marine, Inc. randy@lyfemarine.com (704)277-8888 (xxx)xxx-xxxx State / Province / Region NC Country US Mailing Address:* Street Address 19109 W. Catawba Ave. Address Line 2 Suite 200 City Cornelius Postal / Zip Code 28031 A signed and dated copy of the Agent Authorization letter: Mehen Brooks Agent Auth.pdf 127.68Y-B Mehen_Brooks Catawba Riparian.pdf 434.6KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name: * Mehen/Brooks Shoreline State / Province / Region NC Country United States If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* Upload File Look up address Property Address Lookup: * Street Address 242 Shoreline Loop Address Line 2 City Mooresville Postal / Zip Code 28117-7452 Latitude: * 35.541042 State / Province / Region NC Country US Longitude: *-80.898758 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Mehen Brooks diagram.pdf 2.27MB Please use the diagram at the link below: https:Hedocs.deq.nc.gov/WaterResources/O/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Mehen_Brooks Photo l.pdf 6.35MB Mehen Brooks Photo 2.pdf 4.35MB 4. Location of the property (where work is to be conducted) Nearest Town: * Mooresville County: * Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* Imperial Point/ Bay View Include phase/lot number Directions to site: * 77N to Exit 35 ----> Brawley School Rd. to left onto Stutts Rd to right onto Shoreline Loop. 242 is on the right. Please include road names and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application: Residential, undeveloped Residential, undeveloped, etc. 6. Property Size .46 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Shape the bank, install geo-tech fabric, install Class "B" Rip Rap along the 123 lineal feet of shoreline for stabilization. 8. How will the work be done?* From Land From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level: (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 1107 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land- ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 123 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) Vacant lot, graded Sketch: Mehen_Brooks diagram.pdf 2.27MB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Randy Jordan Signature: Submittal Date: 11/6/2021 Initial Review Is this accepted into the review process?* Yes No Project Number:* 20211622 Version: * Select Reviewer:* Select Reviewing Office: Has payment been received?* What amount is owed?* Alan Johnson: eads\adjohnson I Mooresville Regional Office - (704) 663-1699 No Payment Needed Fee Received • Need Fee - send electronic notification • $240.00 $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO: 3 PLAN NO: PARCEL ID: 4635572213 STREET ADDRESS: 242 Shoreline Loop Mooresville, NC 28117 Please print: Property Owner: David Brooks/Lori Mehen Property Owner: The undersigned, registered property owners of the above noted property, do herebyauthorize Randy Jordan , of Lyfe Marine, Inc. (Contractor/Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owners Address (if different than property above): 3313 Old Chapel Hill Rd Durham, NC 27707 Telephone: 919-579-9828 We hereby certify the above information submitted in this application is true and accurate tothe best of our knowledge. Authorized Signature 11.05.21 Date Authorized Signature Date CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project NameJaddre...... i � County. Print Signature Contractor/agent: Randy Jorcarr Print The approval is for the purpose and design described in your application, impacts not indicated in the application is a violation of the Buffer Rule_ Site specific work should be provided in the application. 115A NCAC 02H .0506 and 15A NCAC 0213.0243(8)1 Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc_ are not allowed inthe buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. 115A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)1 5tormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting. materials. Signature (owner): Z�'aved 52e& Date: 11.05.21 Owner/Agent's Signature* Printed Name [15A NCAC 02H .0502(f)l 'Agent's signature is valid only if an authorization letter from the owner is provided. La ke (At Full Pond/Normal Water Level) Ful Norma Sr Date Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors Page 3 of 3 FORM: SSGP 10-2013 47"SW " MV og �P .: �a•� .+ �. gip. � �'.y ` . � • + , A, Ai � 'y �w` � � ,,• C iwq' + y$'�iF ll�ir�,�. � 6 i3�� '►". J'J� ��p 7yf' � '1 �1Aq,� 'OF � T C 101 i nv��ID 6 I Owner/Agent's Signature* Printed Name [15A NCAC 02H .0502(f)l 'Agent's signature is valid only if an authorization letter from the owner is provided. La ke (At Full Pond/Normal Water Level) Ful Norma Sr Date Please approximately sketch the following information on this plan, length of shoreline (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors Page 3 of 3 FORM: SSGP 10-2013