HomeMy WebLinkAbout20071841 Ver 7_More Info Received_20211102Strickland, Bev
From: Cahoon, Steve <Steve.Cahoon@duke-energy.com>
Sent: Tuesday, November 2, 2021 8:13 AM
To: Homewood, Sue
Subject: RE: [EXTERNAL] Asheville Airport
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Hey Sue,
Sorry I was out on vacation yesterday, just seeing your email, can you write something in the permit that
requires a post construction SW permit review with DEMLR, after talking with Jim Farkus, we'll either need a
permit or we can show DEMLR that post construction SW controls are either equal to or better than current
controls, in which case they will issue us a letter sting post construction SW permit is not needed.
We are currently working with the airport to assess the current SW controls to be able to go back to Jim
Farkus with a proposed path forward.
Steve
From: Homewood, Sue <sue.homewood@ncdenr.gov>
Sent: Monday, November 1, 2021 8:31 AM
To: Cahoon, Steve <Steve.Cahoon@duke-energy.com>
Subject: [EXTERNAL] Asheville Airport
*** CAUTION! EXTERNAL SENDER *** STOP. ASSESS. VERIFY!! Were you expecting this email? Are grammar
and spelling correct? Does the content make sense? Can you verify the sender? If suspicious report it, then do
not click links, open attachments or enter your ID or password.
Hi Steve,
I really need to get this permit out the door this week so I was looking back at the file. I thought maybe I could just write
a condition which states that you cannot conduct the work until another DEQ agency has approved the sizing and design
of the post construction/post cap stormwater measures but unfortunately, I have communication from DWM in the file
where they clearly say that they don't do this so I'm back to square one. See this snippet from an email exchange with
them.
i
"Are you at all looking at the design► and/or sizing of those stormwater basins as part of your 11
Stormwater basin design and sizing is not under the purview of Solid Waste.
Please let us know if we can be of further assistance.
Regards,
Sarah
Sarah Rice
Environmental Program Consultant
Division of Waste Management — Solid Waste Section
North Carolina Department of Environmental Quality
919-707-8287 (phone and fax)
Sarah.Rice@ncdenr.gov
I can't issue the 401 unless I can document that another agency is taking responsibility for the review of the post
construction sizing of the SCMs, otherwise we'd have to do the review as part of the 401. I know you said the last time
you talked to Jim F. in stormwater he was going to work with DWM to figure this out. Is there anything more? I don't
want to have to deny this application for lack of information but my clock is running out quickly and I don't feel I can
even write a conditional approval at this time.
Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
336 776 9693 office
336 813 1863 mobile
Sue.Homewood@ncdenr.gov
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
2
"Are you at all looking at the design and/or sizing of those stormwater basins as part of your review? "
Stormwater basin design and sizing is not under the purview of Solid Waste.
Please let us know if we can be of further assistance.
Regards,
Sarah
Sarah Rice
Environmental Program Consultant
Division of Waste Management —Solid Waste Section
North Carolina Department of Environmental Quality
919-707-8287(phone and fax)
Sarah. Rice@ ncdenr.¢ov