Loading...
HomeMy WebLinkAboutWQ0041987_Application (FTSE)_20210830State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: MJa 6 0411 U 7 (to be completed by DW R) /V1 d b All items must be completed or the application will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: Town of Goldston (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Timothy J Cunnup per 15A NCAC 021.01Q6(bl Title: Mayor NC Dept of Environmental QU41tV 4. Applicant's mailing address: PO Box 527 City: Goldston State: NC Zip: 27252- 201 5. Applicant's contact information: Phone number: (919) 898-4441 Email Address: timeunnupAembarnmail.com weigh Regional Office 11. PROJECT INFORMATION: I. Project name: Phase II Sewer System Improvements 2. Application/Project status: ❑ Proposed (New Permit) ® Existing Permit/Project If a modification, provide the existing permit number: WQ0041987 and issued date: November 10, 2020 If new construction but part of a master plan, provide the existing permit number: WQ00 _ 3. County where project is located: Chatham 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.608901 Longitude:-79.313913 5. Parcel ID (if applicable): _ (or Parcel ID to closest downstream sewer) Ill. CONSULTANT INFORMATION: I. Professional Engineer: Michael Wicker License Number: 11325 Firm: WithersRavenel Mailing address: 115 MacKenan Drive City: Caa State: NC Zip: 2751 1- Phone number: (919) 469-3340 Email Address: mwickcrnwithersravenel.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Big Buffalo W WTP Permit Number: NCO024147 Owner Name: City of Sanford V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WQQ036067 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS.. Owner Name(s): Town of Goldston FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's O rAional Agreement t FORM: DEV) been attached? ❑ Yes [-]No [RN. -'A 3. If the Applicant is a Home/Property Owners' Assoi;J0*n, has an Operational. reement fFC}Rk : HOA 1 been attached? ❑ Yes [—]No ®N?A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparationlservice ❑ Hotel and/or Motels ❑ School I preschool / day care ❑ Medical 1 dental / veterinary facilities ❑ Swimming Pool ;'Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming PooUFilter Backwash ® Businesses / offices I factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T -0 103L201) 4Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under I SA NCAC 02T .01 14�0? ❑ Yes ®No ➢ ](Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114ff11 Daily Design Flow'•e No. of Units Flow Dwelling Units 360 gal/house 38 13,680 GPD General Business (Marsh Auto Repair) 25 gaifemployee*4 employees 1 100 GPD gal? GPD BID ALTERNATE gal! GPD Dwelling Units 360 gal/house 26 9,360 GPD General Business (Marsh Auto Repair) 25 gallemployee*4 employees 1 100 GPD Total 13,780 (alternate - 9,460) GPD a See 15A NCAC 02T .0114fbk (dk.(elf 1) and feW2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .01 14(c), design flow rates for establishments not identified [in table ] 4A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per .15A NCAC 02T .01 14) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ® Flow has already been allocated in Permit Number: WQ0041987 ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): . FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 2259 PVC 8 91 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & M DC (Pump StationslForce Mains}: COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: Pinecrest Road PS 2. Approximate Coordinates (Decimal Degrees): Latitude: 35.604234' Longitude:-79.3142651 3. Design flow of the pump station: 0.06 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 42 (alternate = 30) gallons per minute at 133 alternate = 83 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 2 2850 PVC 6. Power reliability in accordance with I A NCAC 02T . 40,00 Pt Of b .4yll0h1neoto 0 fc ® Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)( I )(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ 1 f the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): I. Does the project comply with all separations found in iSA_NCAC 02T._Q!QJ.0" ® Yes ❑ No ➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including any wells, WS-1 waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 2T_ 05 contains alternatives where separations in 02T_030 cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(i) oor4&), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per IA NCAC 02B _0200? ®Yes ❑ No ❑ N;`A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coveragelauthorization under a 404 Nationwide or ❑ Yes ® No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Ptrm ittine Branch 5. Does project comply with 15A NCAC U2T.0105(cX6) (additional permits!certifications)? ® Yes ❑ No Per ISA NCAC 02T.01051ck6}, directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC' 02T_0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ NSA ➢ Ifyes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: NC Dept of Environmental Qualit; I. Does the submitted system comply with , the and the AUGas p"�IIMIV ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VAL> ��I �n Q ff is for review. Approval of the re uest is required rior to submittal of the w ast Trru A '} cation andsuppardng documents. 2. Professional Engineer's Certification: 1, Michael C. Wicker, P.E. attest that this application for (Professional Engineer's name from Application Item Ill. I.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: ••°N CaRp *•°°° DocuSigned by: SS/p�% r I SEAL 9 � a f; N&4d 11325 s p CF2CEAE2882C404C. 8/26/2021 ••, y °•••PP..•• ° qEL 3. Applicant's Certification per 15A NCAC 02T .0106(b): Timothy J. Cunnup, Mayor, Town of Goldston attest that this application for (Signature Authority's name & title from Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes and , any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S10,000 as well as civil penalties up to S25,000 per violation. Signature _ _ _ —� - Date: . p l p a .; FORM: PTA 04-16 Page 5 of 5 DocuSign Envelope ID: 1640EA81-1758-4DE1-93D2-951DB9Er=9B75 NC Dept of Environmental Quality State of North Carolina Department of Environmental Quality AUIG IS 0 2021 Division of Water Resources R Flow Tracking for Sewer Extension Applications ' Division of Water Resources g Pp Raleigh Regional Office (FTSE 10-18) Entity Requesting Allocation: Town of Goldston Project Name for which flow is being requested: Phase 11 Sewer System Improvements More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Big Buffalo Treatment Plant _ b. WWTP Facility Permit #: NCO024147 A11 flows are in MGD c. WWTP facility's permitted flow 12.0 d. Estimated obligated flow not yet tributary to the WWTP 1.0608 e. WWTP facility's actual avg. flow 5.733 f. Total flow for this specific request 0.01378 g. Total actual and obligated flows to the facility 6.8076 h. Percent of permitted flow used 56.7% 1I. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity,(Firm 1 pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is ¢ 0. Downstream Facility Name (Sewer): Sanford Collection System Downstream Permit Number: W CS00047 Page 1 of 6 FTSE 10-18 Docu5ign Envelope ID: 1640EA81-1758-4DE1-93D2-951DB9EE9B75 III. Certification Statement: I Paul Weeks, Jr. PE certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. EDoe Signed by: At, Wuls 11/4/2020 BBC39EM678"B9 f Signing Official Signature City Engineer Title of Signing Official Date Page 2 of 6 F-rSE 10-18 S� 0 i 3 i r n Q� C � rr Q)�v ro LA oz Lw as %? YI L � � li u O � O Y LL c� L c .� E ZU ❑ Z a' N Wdz a> EU❑ Cl O O --j A LL N- J ca cn w a o � ❑ as c 61 � Z uo o`o w �`' 3w wLij� CL w- • V) • z • CL xwa -xs. e n - 1,s 'cc wu. -6"o . Dm �vew�-�.coe �\o•to-a�\oi\a ■r �/ WithersRavenet 0..e People Yoi.- Su!.: e,s August 26, 2021 North Carolina Department of Environmental Quality Division of Water Resources 3800 Barrett Drive Raleigh, NC 27609 Attn: Jason Robinson, Engineer RE: WR Project #08180741.00 Fast Track Sewer System Extension (WQ0041987) Modification Town of Goldston Phase II Sewer System improvements Dear Mr. Robinson: VC Dept of Environmental Quality Ails 4 0 2021 41 II@igh Regional Off oo MZ_ Please find enclosed a Fast Track Modification Package for the Town of Goldston Phase II Sewer System Improvements Project (previously issued WQ0041987). The previously approved project went out to bid but bids did not come in within the Town's construction budget, so the project has been redesigned, in an effort, to bring it into budget by decreasing the length of gravity sewer, increasing the length of force main, and decreasing the size of the pump station. The new design consists of the installation of approximately 2,350 LF of 8-inch gravity sewer, 2,850 LF of 2-inch force main, and 10 manholes to extend sewer service to a currently unsewered area along Pinecrest Road and Pittsboro Goldston Road. The previously issued permit allowed for the construction of approximately 2,980 LF of 8" gravity sewer, 1,733 LF of 4" force main, and a 120-gpm pump station. The new design serves all the same properties as the previous design, but cost savings are expected due to the smaller size of the force main and pump station, and a smaller length of gravity sewer to be installed. The new design will also include the installation of a new duplex submersible grinder pump station. There are two alternates included in the new design. The base bid is a 42-gpm grinder pump station, which is designed to handle flow from all parcels along the alignment, including 27 developed parcels and 12 undeveloped parcels. The bid alternate is a 30-gpm grinder pump station, which is designed to handle flow from the 27 developed parcels. The project will connect to an existing gravity sewer located along Pittsboro Goldston Road. Additional flow from this project is expected to be approximately 9,460 gpd from the 27 parcels to be served. The 42-gpm pump station is sized for a slightly larger flow (13,780 gpd) due to the presence of several undeveloped properties along the alignment. Ideally, the larger 42-gpm pumps will be installed in this project to prevent replacement of the pumps if any further development occurs along the alignment; however, due to budget constraints, the smaller 30-gpm pumps may be installed after bids are opened. The flow of 13,780 gpd was previously permitted in WQ0041987. Items included in this submittal: • Two copies of Fast Track Sewer System Extension Application • Two copies of an FTSE 10-18 for the Town of Goldston (from original permit since flow allocation has not changed) • Two copies of an FTSE 10-18 for the City of Sanford (from original permit since flow allocation has notchanged) 115 MacKenan Drive I Cary, NC 27511 t: 919.469,33401 f: 919A67.6008 1 www.withersr-avenel.com I License No, C-0832 Asheville I Cary I Greensboro I Pittsboro I Raleigh I Wilmington 1� WithersRavenel Our People. Your Svcccss. • Two copies of USGS and aerial site maps • Application fee If you have any questions about this submittal, please do not hesitate to call me at 919-535-5185 or mwicker@withersravenel.com. Sincerely, WithersRavenel Mom,CA WUk" Michael Wicker, PE Project Manager - Utilities WithersRavenel cc; Timothy J. Cunnup Mayor, Town of Goldston Town of Goldston - Phase II Sewer System Improvements August 26, 2021 ��D�Pt opEnyira �menfal Quality A, U 0! 8h Reglo�al O f'ri Co WR Project No. 08180741 Page 1 %0 WithersRavenet 40 Our People. Your Success 115 MacKenan Drive Cary, NC 27511 t: 919.469.3340 1 f: 919.467.6008 TO: Raleigh Regional Office - Water Quality Regional Operations 3800 Barret Drive Raleigh, NC 27609 ®Attached WE ARE SENDING YOU THE ❑Shop Drawings FOLLOWING ITEMS: ❑Copy of Letter Letter of Transmittal ❑Under Separate Cover Via []Prints ❑Plans ❑Samples ❑Change Order ❑Disk ❑Other ': 9� ❑Specifications COPIES 1 DESCRIPTION Cover Letter 2 FTSE 10-18 for Town of Goldston 2 FTSE 10-18 for City of Sanford 2 Topographic Maps 2 Aerial Site Maps 2 Previously Approved Permit with Requested Modifications 1 Permit Application Fee Check THESE ARE TRANSMITTED as checked below: ®For approval ❑Approved as submitted ❑ Resubmit copies for approval ❑For your use ©Approved as noted nSubmit copies for distribution ❑As requested ❑Returned for corrections ❑Return corrected prints ❑For review and comment ❑Other ❑FOR BIDS DUE UPRINTS RETURNED AFTER LOAN TO US REMARKS: COPY TO: SIGNED: -Emily Murawski If enclosures are not as noted, kindly notify us at once. Ott