Loading...
HomeMy WebLinkAbout20131151 Ver 1_401 Application_20131013C vRs October 23, 2013 Mr. John Thomas, Project Manager U.S. Army Corps of Engineers CESAW -RG -R Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Central Park Landfill Forsyth County, North Carolina Dear Mr. Thomas: 20131 15 1 In accordance with Section 404 of the Clean Water Act (33 USC 1344), URS (Applicant), is requesting authorization for a Department of the Army Nationwide Permit #38 to disturb Waters of the United States for the remediation of an abandoned lead battery landfill. Please find enclosed the Pre- Construction Notification (PCN) application form for this project, along with supporting documentation and figures. Please call me at (919) 461 -1435 if you should have any questions regarding this request. Sincerely, URS Corporation — North Carolina U, -k A Charles E. Benton, PWS Senior Environmental Scientist Enclosures cc: Ms. Sue Homewood, NCDWR File copy tA�rJ ff@— —[a pq R OCT 2 9 2013 URS Corporation —North Carolina L tie �A� Q UALIT Y 1600 Perimeter Park Drive, Sude 400 der Morrisville, NC 27560 Tel: 919.461.1100 Fax: 919 461.1415 www.urscorp.com 20131 15 1 of war , o� pG Office Use Only: _ Corps action ID no. ° DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: © Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 38 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): © 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes Q No For the record only for Corps Permit: ❑ Yes © No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑Yes ©No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Central Park Landfill 2b. County: Forsyth County 2c. Nearest municipality / town: Winston Salem 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: — 3. Owner Information 3a. Name(s) on Recorded Deed: City of Winston Salem 3b, Deed Book and Page No. DB 2985 PG 2139 - Pin# 6835 -42 -7543 3c. Responsible Party (for LLC if applicable): D 3d. Street address: E. Salem Avenue 3e. City, state, zip: Winston Salem, NC 27101 3f. Telephone no.: p NR . WAf: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑X Agent ❑ Other, specify: 4b. Name: Scott Hartung, Vice President 4c. Business name (if applicable): URS Corporation 4d. Street address: 1600 Perimeter Park Drive, STE 400 4e. City, state, zip: Morrisville, NC 27560 4f. Telephone no.: 919.461.1362 4g. Fax no.: 919.461.1415 4h. Email address: scott.hartung @urs.com 5. Agent/Consultant Information (if applicable) 5a. Name: Charlie Benton, PWS 5b. Business name (if applicable): URS Corporation 5c. Street address: 1600 Perimeter Park Drive, STE 400 5d. City, state, zip: Morrisville, NC 27560 5e. Telephone no.: 919.461.1435 5f. Fax no.: 919.461.1415 5g. Email address: charles.benton @urs.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Pin# 683542 -7543 1b. Site coordinates (in decimal degrees): Latitude: 36.085119 Longitude: - 80.237419 1c. Property size: 1.5 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Salem Creek 2b. Water Quality Classification of nearest receiving water: C - Stream Index # 12 -94 -12 (4) 2c. River basin: Yadkin - 03040101 Subbassin - 03 -07 -04 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The protect site is located in an urban area within Winston Salem. The site contains maintained lawn and wooded areas Adjacent land use includes ball park fields, commercial buildings and parking lots, residential homes, an overhead utility line. (Figure 1 - Vianity Map) 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 500 3d. Explain the purpose of the proposed project: Restoration of a historical landfill contaminated with lead batteries. 3e. Describe the overall project in detail, including the type of equipment to be used: See Project Description 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes © No El Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Charles Benton, URS Agency /Consultant Company: URS Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. No JD requested. Salem Creek and its on -site tributary are obvious jurisdictional features. No wetlands were identified on site. A field visit by the USACE and NCDWR was conducted on October 3, 2013. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑Yes Q No El Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes Q No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands © Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary W1 - Choose one Choose one Yes/No W2 - Choose one Choose one Yes /No W3 Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes /No - W6 - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 T Excavation Salem Creek PER Corps 275 S2 T Excavation UT to Salem Creek PER Corps 230 S3 Choose one S4 - Choose one - S5 - Choose one S6 - Choose one 3h. Total stream and tributary impacts 3i. Comments: Salem Creek - No excavation would occur in the stream bed. However, excavation is required to remove batteries from the stream bank. Some excavation of the UT to Salem Creek stream bed and banks will occur to remove batteries. The impacts in this PCN represent a worse -case scenario. Excavation will be limited to the greatest extent practicable during the remediation effort. Appropriate stream bank stabilization measures and natural channel design features (e.g., rock vanes) will be implemented to minimize impacts from sediment and erosion Page 4 of 10 PCN Form —Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Temporary 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation. then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman []Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — Permanent (P) or mitigation impact impact Temporary required? (square (square feet ) feet 131 Yes /No B2 - Yes /No B3 - Yes /No 84 - Yes/No B5 Yes /No B6 Yes /No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Lead battery contamination was detected in the stream and stream bank sods. Given the nature of the project activity, no avoidance or minimization measures are provided, beyond those described below that can occur during the project excavation phase. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The impacts in this PCN represent a worse -case scenario. Excavation will be limited to the greatest extent practicable as determined by on -site soil testing during the project excavation phase. Streams will be restored to their pre - existing condition, and appropriate stream bank stabilization measures and natural channel design features (e.g., rock vanes) will be implemented to minimize impacts from sediment and erosion. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes © No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes Q No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0 2b. Does this project require a Stormwater Management Plan? ❑ Yes © No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Project actively is a lead battery remediation actively. No impervious surfaces runoff are proposed. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW USMP apply (check all that apply): H Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached. 4. DWQ Stormwater Pro ram Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ORW (check all that apply): HSession Law 2006 -246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state /local) funds or the MYes No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 28.0200)? 2b. Is this an after - the -fact permit application? ❑Yes Q No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s). 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The protect will remove soils contaminated with lead The site will be restored to pre - construction conditions. No development is proposed for the site 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑Yes ©No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑Yes ®No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program data base, and field visit. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes Q No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? http: //www habdat.noaa.gov/ protection /eft/habitatmapper.htmi 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Forsyth County, NC - Geo-Data Explorer (http:ltwww.co.forsyth .nc.us /tax/geodata.aspx). The Salem Historic District is located approximately 1000 feet west of the project site. The project area is an battery contamination site, and will not impact the historic district. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? © Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: The project will re- establish the project site to its pre - construction conditions No restrictions stream flow, or barriers within the floodplain are proposed. 8c. What source(s) did you use to make the floodplain determination? Forsyth County, NC - Geo -Data Explorer ( http:// www. co .forsyth.nc.usitax/geodata.aspx) SIcv T A 10 , 22 , l3 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authornzabon letter from the applicant is provided.) Page 10 of 10 -Aluo aoua�ala� iol si dew sigl £ LOZ iagolo0 dew AI!UIOin a.infii.1 40-LO-SO uiseggng paysja;eM JaniN ui )Ipek movo£0 - onH ajig }oafoid puafia-I eulloaeO 4:PoN AjunoC) t4jAsao j wales- uolsulM Ill ;puel Ved IBJIUOO Contractor must place Orange \ Protection Fencing along the STORMWATER entire length of adjacent 1 ii� RETENTION POND prof et y Ines os s awn. ° 1 so �f %ii \ LMnits of Disturbance 24 YC \ ^`T`ep9`� �i /ci \ l\ \�t� Temporary \ i� ` y� 1�5+ i ..� ! \ \ \`�' �' Silt Fence Jj\ �7K�`��, Outlet Protection cD Cj Ff� f 4�-- `x'l / sfr r al����� \♦ /ir rr� Class B Stone on \Nfvttb NCOOT Type 4 Geafextile Fabric \ 4Bi?CP /N 7V 4&74' WV -7-MM' J _ /' Water. / T/ ii Break-,, LtBER1A STIR \ t �4~ ~\41OQEO 40' R/W (UN- OPENED) V. PS 58 PG 75 PB46PG 131 Stream Bank Stobilizotion' — r �+ v Temporary (Approximotel y 275 L.F.) Silt Fence Us i k Y Ct t£ t -- fi �124'TWILE �? \ i Wcttl srt�MaJzE 1!r r1DUE LIMITED Rip —Rap Bank Stabdization fi Break / r E ATION NEAR THE (Approximately 230 L.F.) ` t d t g= 1t \ t JJ rr AMBANK, THIS —Less Structural Design �\ ± t t t 1/ `1 r r, r „AREA OF STREAMBANK Features will be Considered �` 1t t\ f ttsst-�y f / rr/ rrrf MAY NOT BE DISTURBED. During Implementation t \� l 3 J I 1 � f \ J I � Limits of t� Disturbance ,. v t t ` rrr, :- t � ! Jar✓ tie 9repk / f�ff i r r � tle r 60 rrr rr APPROX. SCALE, ft. '' " "��,,��r rfrrrf �, r \ \ s,..• AS SHOWN air M -K MOM �wraac�n ®Temporary Pedestrian Bridge EM INCISED STREAM BANK Barricade reu, W rn, CMW "SW NOTE.- Grading ties to Stream Bank Stabilization project conducted by Blythe Construction yry amparory /f / // �_SYt FePce LEGEND -so -- STORM SEWER LINE 0 BUILDING /STRUCTURE r " APPROXIMATE AREA - -� TO BE EXCAVATED LIMITED EXCAVATION ��� (INDUSTRIAL PSRG) �j Section 404401 Permit Impact Map TSH 22AUG13 Central Park LDFL NONCD0000782 CB22AUG13 •�•• •. a•••Rw CB 22AUG13 31829005 404/401 0 TEMPORARY SILT FENCE — LIMITS OF DISTURBANCE EM INCISED STREAM BANK GRADED TO 2:1 SLOPE ® TEMPORARY STREAM DIVERSION SYSTEM RIP -RAP STREAM BANK PROTECTION 7_777 TRIBUTARY DIVERSION -- SYSTEM IN PLACE Section 404401 Permit Impact Map TSH 22AUG13 Central Park LDFL NONCD0000782 CB22AUG13 •�•• •. a•••Rw CB 22AUG13 31829005 404/401 0 TITLE COVER SHEET C1.0 EXISTING CONDITIONS C2.0 EXCAVATION, STOCKPILE AND LAYDOWN AREAS C3.1 EXCAVATION, STOCKPILE AND LAYDOWN AREAS C3.2 EROSION AND SEDIMENT CONTROL PLANS C4.1 EROSION AND SEDIMENT CONTROL PLANS C4.2 STREAMBANK STABILIZATION PLANS C5.0 E &SC CROSS - SECTIONS C6.0 E &SC DETAILS C7.1 E &SC DETAILS C7.2 STREAMBANK STABILIZATION DETAILS C8.0 NOTES: • PROJECT SITE IS PART OF THE YADKIN - PEE DEE RIVER BASIN. • TOTAL AREA OF LAND DISTURBANCE = 5.3558 ACRES AREA NEAR SOCCER FIELD= 1.1534 ACRES AREA NEAR WSECU = 2.4186 ACRES STAGING/ STOCKPILE AREA = 1.7838 ACRES • EXCAVATED MATERIAL SHALL BE HAULED AND DISPOSED OF AT AN NCDENR APPROVED FACILITY. • SITE LOCATION: LAT.(m): 259800.5791 LONG. (m): 498133.8075 EROSION AND SEDIMENT CONTROL PLAN SOIL REMEDIATION, CENTRAL PARK LDFL WINSTON— SALEM, NORTH CAROLINA BUD i--- 'To / \ \ 14 �1 (NOT TO SCALE) NONCD0000782 / / / WINSTON -SALEM ' CITY EMPLOYEES CREDIT UNION C7+ // / \ X 418 / � ecxes SITE , AAES f . \ SO O� o , / ICJ / 0 0 oao Z y U C rs a a° N °�z°` a o of 'ps U a o P �o� V)l Z' rn I s W W fTi X � HN- x U J LL cu O Y 2 a C U C CD U o a O W C O o 'p O z c N o mEo r. o af U to _ Z x `O 60 T LLI to Z ii LLI W 2 U) w LLI 0 U DATE: SEPT. 13, 2013 PROJECT N0. 31629005 SHEET C1.0 J•� /r I f I _ awz o• ixlcyn� / / / / V p �j1 /•/ /,� 80CCI'R / \ 2 6835 -31 -8662 6875 -42 -4555 G.2 LLC _ _ _ _ _ — _ _ /• ' /• %{ SALEM REC. FIELDS M DB:24' PG. WINSTON -SALEM CITY EMPLOYEES' / CREDIT UNION DO. 2102 PC: 207 \ \ SPOLYYIFWN u- RdTRH7'20N / cco 0 po" a/ 6835 -42 -8267 THE CITY OF MNSTON -SALEM 08:1667 PG:1177 2 cc Z c a- / /tv / /'i`f /� �68J5- 31 -H6E2 SAG EM REC. FIELDS, LLC 09; 2444 PG 2790 i s4.v ar r�riws �..-- -•' /. _/: -- ___ 1. �MN[' 157- ' --- , 5, —'� / PmLD �Mw.p �j /1 / / / / / / •` [\ "`` 6835 -52 -0604 •�\ THE CITY :7N- SALEN/ \ \\ 08:13 13 12 2 PC PG: 725 \ Ie 6B35 -42 -7543 \ CITY OF WINSTON -SALEM \ PB: 50 PG: 75 V p �j1 /•/ /,� 80CCI'R / \ 2 6835 -31 -8662 rtsr,W-Y` G.2 LLC _ _ _ _ _ — _ _ /• ' /• %{ SALEM REC. FIELDS M DB:24' PG. n dry y>, i �..-- -•' /. _/: -- ___ 1. �MN[' 157- ' --- , 5, —'� / PmLD �Mw.p �j /1 / / / / / / •` [\ "`` 6835 -52 -0604 •�\ THE CITY :7N- SALEN/ \ \\ 08:13 13 12 2 PC PG: 725 \ Ie 6B35 -42 -7543 \ CITY OF WINSTON -SALEM \ PB: 50 PG: 75 \ p o �h an 4 O _ r y p ° - U o \ y a` n E m s o .` o o o � b z Q 4 L ¢L� W o V p / / \ 2 \ \ SPOLYYIFWN u- RdTRH7'20N / cco 0 po" a/ 6835 -42 -8267 THE CITY OF MNSTON -SALEM 08:1667 PG:1177 2 cc Z c a- Lie U_ T �+ — — PROPERTY LINES - ---- -- PERENNIAL STREAM /CREEK C C N a7 —•— INTERMFTENT STREAM /DRAINAGE C U C �- APPROXIMATE EDGE OF WOODED AREAS C 04 - "zn: -- CONTOUR MAIOR (D 0 0 r-- - - - - - -- CONTOUR MINOR (n � C '0 n —� CHAINUNK FENCE LINE SANDARY SEWER LINE STORM SEWER LINE r- CCN C:) � 0 0 m -. C D GAS LINE 0 U 8 \ p o �h an 4 O _ r y p ° - U o \ y a` n E m s o .` o o o � b z Q 4 L ¢L� W o 0 50 APPROX. SCALE. ft. Z 0 H F3 Z 0 U U Z F— r� 4i J DATE: SEPT. 13, 2013 PROJECT NO. 31829005 SHEET C2.0 p / \ 2 \ \ \ u- \.\ cco 0 a 2 cc Z c a- Lie U_ T �+ — — PROPERTY LINES - ---- -- PERENNIAL STREAM /CREEK C C N a7 —•— INTERMFTENT STREAM /DRAINAGE C U C �- APPROXIMATE EDGE OF WOODED AREAS C 04 - "zn: -- CONTOUR MAIOR (D 0 0 r-- - - - - - -- CONTOUR MINOR (n � C '0 n —� CHAINUNK FENCE LINE SANDARY SEWER LINE STORM SEWER LINE r- CCN C:) � 0 0 m -. C D GAS LINE 0 U 8 -- w -- WATER SUPPLY LINE •y Z 5. - - -..-- OVERHEAD ELECTRIC LINE 2 0 O -- -- TELEPHONE LINE W U) Z LL BUILDING /STRUCTURE 0 50 APPROX. SCALE. ft. Z 0 H F3 Z 0 U U Z F— r� 4i J DATE: SEPT. 13, 2013 PROJECT NO. 31829005 SHEET C2.0 / ••\ TON WASHED — % o N N T 6835 -42 -6829 1a\ / . /�,..� a \a E k NIKE — — — — 1 .I INLET _ TR INVESTMENTS, LLC •4•` DB: 1934 PG 553 '� �° % •\,� �/ ` Nettle 1 PARKING v o Contractor must place Orcrge /' \ •`_ Break LOT / /+ - + -„• _,- __- - - - -' Protection Fencing along the / \ - """" "" 1 O 8 entire /m to of adjacent / 6835 -53 -7202 v o a o T property 9n show Limit. of / 7HE CITY OF WINSTON- SALEM D8: 307 1 •'-t•"-' a ,°, ° Z ! - \ Di.turtonce� a ' \a PG: 296 •_ "_, �"" " "�`� s retmg Surge / / i } stare a _ — • 1 0 0 ` • "' ��-,.� .--' •/ _ — -j" can trucibn \ 1 ! of M I • ATANROLE FOR 16' '� -• ./ Entrance +.,\ I1f8R 1MAW rk,. —.__. / to remain "- 1 / •/ CJ. I►ATBR YA/N 1fi, C,Iy —.— "•,� ' \ —. _. / „ • — AREA OF LANG DISTURBANCE °'\ B/sak C • —!—'— / Net 6835 -52 -0604 ! \ \a = 1.7638 Acpes .� B's \ THE CITY OF WINSTON -SALEM 08:1342 _ PG 725 / -\ Nbttle J Stockpile, Soil Mixing, /` \`.� +.\a Brook / Equipment Staging \ '++\ \ emporary and Equipment l / sot Fence Loyd- Area Nbttl ,\ \ Break rak / '• /' / Break +�. , i ,� \• / / Limit. 0 \ ` . 6835 -42 -7543 Disturbance \ ' — —Nbftl / j.. / CITY OF ce WNSTON- SALFAI PB: 58 • / i �[ Break \, /` / ' : m lr L) T`\ ms of amparary .. Disturb- Break Area to be used as Stockpile will W.ttl have NCDOT Type 4 Geotextile Brow Fab ric and 157 Stone in place ° / pt to st_kpling acfwti... 6835 -42 -4555 - WINSTON -SALEM CITY EMPLOYEES' CREDIT UN ION DB:2102 PG:2071 % '� / j ' / /yct%f tn O -5-ASPHALT-S Contractor must place Orange ♦tom Protection Fencing along the STORY°ATER / �\ entire length or adjacent RETENTION•/ UPPORT^ property lines a. mown POND / ♦/ i / i d �QNE z sou e a rs% \ r �1 ° �. r�n S;':% \ \ / ♦/♦ / ' / / % r Limits of �/♦ j' /' x U Disturbance Tema sure / / si�src TAMINAI � LEGEND Stnn. I2E9UC 17016 1' ` The F- \ �� /// — — F y LINES \ / ♦/ A • `. \ a Ss�dN J P E 1 1 ,tom * ✓-. ;�,1 ' ♦/ / / ERENNIAL STREAM/CREEK LL, wHet Protection i � r \ /♦ •/f / INTERMITTENT STREAM /DRAINAGE C class B Stone _ 1c ,/ , ` " • �'' / %' i j � ,�\ � ;, ��'��atJ /� \ ♦ /`// / "/ �� APPROXIMATE EDGE OF WOODED AREAS � EL ❑ /wear Rotection r textle Fabric Temp Surge CONTOUR MAJOR �[ aa.. I stone a `'� : F "` Equipment c assiiq 66/NCDOT Type a \ for Existmq Sam ry - e 1 n' /♦ .r / ! - -- -- CONTOUR MINOR O (6 reetextee Fnenc\ 4\ ''AREA OF LAND DISTURBANCE 2• Tyrck Surye San - 1 /♦ j ' J / —.—.— CHAINUNK FENCE LINE Z4186 ACRES _ ( \ .�iw NCDOi � 4 G4ot / ♦ i 4 / \'j{� i Fabn� I ♦� s r // j _ —ss— SANITARY SEWER LINE O t?\ \ T .tt STORM SEWER LINE V EXPOSED SANITAR*r.LINE "� I Jl �� )I // — a — GAS LINE B ttM CROSSING BRANCH f �� 1 t-` - r/ :;r' / j� —.— WATER SUPPLY LINE Q c / / Limit. f OVERHEAD ELECTRIC LINE E U toq LIBERIA STREET 1� ` r `pT< �_ xx /a ,j ,,/I / Disturbance —r— TELEPHONE LINE � O C,4 LU 4 40'RAY(UN -0PENED) i { �'b`�<ra� mfr ♦ f Y/ PS 58 PG 75 \- .�� �� - -\�_ y, 1 - %/ / / BUILDMIG/SfNUCNRE � I� / , -: „ O O PB 46 PG 13f .\ '��.•; e„ # � �. �/ o-�/ Tem Sur Stone E � -1 APPROXIMATE AREA TO BE EXCAVATED / ' - _ ♦/ ti: // / /1 / Crospsing ge qWment __ � Q .�. / Stockple and \ - �; �� '// far Existing Sanilory Sewer LINKED IXGVA7NX1 (� CC:)) So11 Mixing Are. \'` We Ile °rOry 2' Thin. Surge Slone on (INDUSTRIAL PSRG) E 6,4 1 J NCDOT Typo 4 Ceot,k,7, Fabric TEMPORARY SILT FENCE 0 V U ,,Not. \ \i��21'7RYPlE �1 td6 %/ ' — — — UNITS OF DISNRBANCE _ S. /� V. ' \ Break YC�kNt1RE ,Y' ;'?�/ ; ACCESS ROUTE DURING CONSTRUCTION O Z 0 12 TrsmRwwy r \ - sot Fencew TYPE IN BARRICADE W (/) Z LL - 5.41. ,EXPOSED Slope EMPORARY SURGE STONE ape Sfobdiz -lion and streambank CONSTRUCTION ENTRANCE CROSSING r Y �,:, I' ;SAN /IARf (1NES Resforahon Details on Sheet CB.O. ENTRANCE/ CROSSING Mea to be Stabilized eithk, 7 SILT FENCE WATTLE BREAK •--1 En / r / Da Rer Com 1 dm Final Grading NOTES, PIPE INLET PROTECTION Q Lrm,ts oI \ Accordance with 2011 NPDES / - Disturbance -,y� '/ /' - 1. EXCLUSION ZONE ENCOMPASSES Requirements AREA TO BE STABILIZED WITH VEGETATION /Y� LU ENTIRE S EXCEP77ONOF BTHE CONTAMINATION U LL 6835 -31 -8652 \ MENANE WV7- 1.' / ''� I aT REDUCTION ZONE AND THE SALEIA REC. FIELDS, LLC „ I SUPPORT ZONE. b&.2444 PG 2790 \\ 1 ( ,/'fg'+'''\ ° /* Z 2. APPROXIMATELY 0.2872 ACRES NLL U BE STABILIZED WTH VEGETATION. Z O w tale destrian X Q s' t� \ h P \ Bridge W 2 �J N� \ METHANE 11T 1,4� 1r/ DATE: SEPT. 13, 2013 � D 40 PROJECT NO. 31829005 } 1 APPROX. SCALr. N. SHEET W.1 NV EL- MRA z1'i'" {y /NV S%MM / /NV IN MWI- raz33' ' / //// / /• '' ` P; LDS i J.IJ �/ 0�2MM 1C Zno /NV IXJr (5Ej =].I. xI :' N4 J,/ ZONE Limits of Disturboncg'� /NV FIIV =)4160" ?� / \ S AANWrS °� \ ;' \ • / /% /,;J INTERMITTENT / \ Temp. Sure ,' - 15 ,' / , , '; : ;u';b 4. ; / STREAM j Stone Const Entrance - CONTAMINAPON E -- _ REDUCTION ZONE i i Temporary P e inlet / - EXCLUSf(JN'/ Silt Fence \ \ IP - Br '� Area to be 'PmtecUm ZONE , - StaDilizetl with l elf /� r"`w\ _ ieYVE+', Vegetation , BASRBALL rraLD /�� /yp ' Out /et Protection / / ly_ a' / _____ - ,4 _. x ';': / /', / ` �' / Claas 8 Stone o / l ♦ -�- /' /' / . / NC'DOT Type 4 n / / l -_ / ' / / Geotextile Fobric `Temp. Surge Stone Equiprnont Crossing Tempora c ry for Exiting Sami wer t Se 2' Thick Surge ory aty on Foab i0 Type 4 Ceotexfile Temporary Silt Fence NOTE, \ r{' 0.3725 ACRES WILL BE STABILIZED WITH VEGETATION. cODBrs / LEG044 — PROPERTY LINES - PERENNIAL STREAM /CREEK -- INTERMITTENT STREAM /DRAINAGE - ^�-�^- APPROXIMATE EDGE OF WOODED AREAS CONTOUR MAJOR - - - - - -- CONTOUR MINOR CHAINLINK FENCE LINE -- SANITARY SEWER LINE —so — STORM SEWER LINE — — GAS LINE — w — WATER SUPPLY LINE —.. -- OVERHEAD ELECTRIC LINE — TELEPHONE UNE C BUILDING /STRUCTURE �I APPROXIMATE AREA TO BE EXCAVATED TEMPORARY SILT FENCE — — — UNITS OF DISTURBANCE ACCESS ROUTE DURING CONSTRUCTION ® TYPE 11 BARRICADE TEMPORARY SURGE STONE CONSTRUCTION ENTRANCE /CROSSING t_ SILT FENCE WATTLE BREAK - -- PIPE INLET PROTECTION AREA 70 BE STABILIZED WITH VEGETATION 0 50 APPROX SCALE, ft. 0 oa° C � O r n i U A N 75 a O if a 8 Z o T a � E (Ago ne ZI€ O F N a W K m mm J LL (0 � Y L O IL C 0 0 Cu C C °D U a) O 000 U) cB O o 0-6 O Z C N C) t6 E cc=)) c o U `� —Z s LO 50 L W U) Z LOL w J (/j ULij W F- Q ZZ> Z 0 00 >g 0 X Q w DATE- SEPT. 13, 2013 PROJECT No. 31829005 SHEET C3 -2 I / 6835 -42 -6829 TR INVESTMENTS, LLC 1 i "' / '�• mfr 09, 1934 P0: 555 '• / - Contractor must place Orangeaf/ \ Protection Fencing Wong the / �\ entire length of adjacmt Limlte of / / /e Property I;— a shown. Disturbance / Wattle 1 PAREINC Break 1 LOT 6835 -53 -7202 1 THE CITY OF WINSTON -SALEM DB:307 PC, 296 ,_-. 1---. __.- -• stet. con.trvctrm /. MANHOLE FOR 16' t/ATER atlyl? ,_'_r r•- -•-'• —•mow ' / ' ` _ - - _ .�� `'\ I C.I. WATER YA/N 16 �•Ji. --.— q AREA OF LAND O15NRBANCE S� / — .v— ...— .— .-- .�. -�+f —• _�_:..y�7r� — — ' \•'�\ 1. 7838 ACRES r�i� —• —! • -- —•--• -- � / ` Wattle 6835 -52 -0604 / � \,.,\ hat Rmm w 1 s1 !Teak \ THE CITY OF WINSTON- SALEM DW1342 / q Equipment and Loydawn Aria / \ _ i , till BrBreak 6835 -42 -7543 Disturbance \ .1 �T1ttle J CITY OF WV49TON -SALEM P8: 58 FQe "ce �L�M�Iti 'o/ Sgt e Brealk / NCOOT Tjpe 4 Geotextile Fabric Mbttl and ,y57 Stone are0k Mbm. / 8835 -42 -4555 WINSTON -SALEM CITY EMPLOYEES CREDIT / J UNION DB:2102 PQ20 SASPNALTS Contractor must place Orange 4J Protection Fencing along the TER RE entire length of adjacent \ S ETENT property Knee as mown. POND ON /6/ 'i' ' �• SSurgp C ee te,e on t "SEE NOTE 1 122 Entrance - j r ,� f � \ unite of / ! LEGEND f \ P 1? J \ Disturbance /¢ % - -- PROPERTY LICS ' �' J , / r / _p S q 'f /. 24 SYC --Pill , PERENNIAL STREAM /CREEK TOPen, INTERMITTENT STREAM/DRAINAGE sto rt APPROXIMATE EDGE OF WOODED AREAS - '`\l'1 r ; // >.,. CONTOUR MAJOR /¢; i f y�/ r O trei P6tmtiori ,_: ' , �/ i ,_ \ - \ \ r/ / /// ._.. CONTOUR MINOR \ IUi-,_ close B Stone m "�1r 2 _ t i ; ' / // -.-.- CHAR(UNK FENCE UNE ltratth a'- r - ..NC00r rype 4 -----77 am Sur r ^ / - ss- 5411RARY SEWER UNE Dole t a teetbn ` texGa FaNic P 9e S hY s , /Cleee I Slone an e, - _ ; Equipment Cross+Ag �tis/ a/ \ / T Ce°oartu.FMlc\ \ "AREA OF LAND DISTURBANCE ?n'rThick5uryenSB +ra�eJa�er � %' `mot //r}� \/� / / � 1N.� HE EXCAVATION OF SOIL MAY -sa -STORM SEWER LINE �I = 2 4186 ACRES NCOCTxT� 4 Daatextne / r� " <ijf / \ NECESSITATE REPLACEMENT OF UTILITIES. - o - -- GAS LINE 1 f✓j r OPERATION - w - WATER SUPPLY LINE Around / r t( 1 / / THEREFORE, APUMP- AROUND / J f Impervious ��i,' % MAY BE UTILIZED. - OVERHEAD ELECTRIC LINE L , \ EXPO:EO SAN /TAB,( /NE 1 > t J' -' .n- + / IKatile 1, v " 1 - 1"' ftp,y(p / . / i —r - TELEPHONE LINE CROSSING BRANCH ��\ y t r- _ f ': - / / L%RI(ts at y Disturbance BUILDING/STRUCTURE / LIB ERIA'STR T /'/ : `I APPROXIMATE AREA TO BE EXCAVATED �5 A jj� UMI(ED EXCAVATION PB 58 PG 75 ` (INDUSTRIAL PSRG) PB 46 PG 131 r z a/ ':;' / \ �0 �• Temp Surge Stone Equipment -�— TEMPORARY Sill FENCE J /'� //J `•\ ` -- - \� i�IEYPORARY' \x'lg a P �, / Ir�Exn�mg San;tury Sewer — — v — LIMITS OF DISTURBANCE WaNla i PLEMBLE NOSE x\ r d 'i SAt Fr / 2' Thick Surge Slone on NCDOT Type 4 Geofe tae Fabric b ACCESS ROUTE DURING CONSTRUCTION ' ® TYPE III BARRICADE s>r�1And7e Sit t P� aY r.a r3g%� CTEMPORARY RUCTION ENTRANCE/CROSSING / \ MCe • \ ' 3 / '„ ' SILT FENCE WATTLE BREAK \ SBt Fence DI De / �/ ) (' ,ExPasfO ... PIPE INLET PROTECTION / > EXtendetl Pdor to��. pl �4 j tea'- �' 2t f -), +.- ;'SANITARr LINES / / \ Excavating in th(s "' L9 its of \' DEWA7LRI rr /• flreet / /'/ '- �• /✓ /� - \ \ ysi ♦ �\�' . [SSPEECYAL :i LLING BASIN x• BB35 -31 -8662 \ " xJ - �\ U &PI,A STABIL`P2C/0 OUTLET 5/0NS' SOIL STABILIZATION TIAIEFRAAIES ,! / SALEIM REC. FIELDS. uC' \ /� /� .INSTEAD \ 2 F'✓C�� �` % 7empwwy _�`OUMP/NGgAEAN WATER. BASIN IF % pB: 2444 PG: 2790 \ A7L�\7ilANF� JFN7' r, J . 3r09. �. Impervi ue D &e \ SITE DESCRIPTION STABILIZATION TIME TIMEFRAME EXCEPTIONS "ear, '/ \ PERIMETER DIES. SEALER DITTIES SLOPES _... _. _ 7 DAYS X01E \ ; / 0 AND �,\ btiawA /- ✓¢��4 a e� \ \ \ Me WAWTY MTER 1NmZ01ES 7 OkVS NONE \Padepst ray, \ SLOPES STEEPEIR THAN 3r 7 DAYS NOTL57EEPER ARE &OR iN6 2!, M IN 501Y5 YIET ALLOWED ` Barricade \ \ n "" ' n Peeteefrimt �, SLOPES ]W OR iliA T DAYS FOR SLOPES GREATER THAN SW IN LENGTH. r ALL OTNBI AIR'Af WtTM SLOPES MITER THAN Y M DAYS NONE. EXCEPT FOR PERIMETERS AND NOW ZONES. 1 ; 1 I 1 Wattle 1 i Bradt 1 1 Wattle > j Break S' Sit F� i a 0 40 APPROX. SCALE, h, 8 Q U N N o C = Z o � a I'L'L 8 °q a° a i n .4 `oZ3 aei 7 e Z o o F to EE L., o ez J LL Ld 0 EL Y O ID C O U C C (D j o 0 Z5 Co C) Z "0 O C O C) C CD CD 0 O N U •Z x 7o — O L LI in Z L° Z Lu 2 Z E5 J L1J U) 0 J z Q x OO E0 U W LLL GTE: SEPT. 13, 2013 PRUJECT No. 31829005 SHEET C4.1 f 7 / / /, PIpL05 6835 -31 -8662 Z i /SALEM REC. FlEL.I115, LLC arM 2 Avv cvr d" VC R,M tTE ✓. 59 a5 i f M/V IN q ,yyJJ IS'GMV .- ` \ / SEE �NbTE Tempora re ry S1t . l / , F \ .� _ Pipe Inlet . Protection a.� \ / t BASEBALL FIELD I X ' Ctl 4 / Tem Sgt, Fonpe. ra rR l � /\nE'r %3pyi/AI f6 / l Temporary /\ // •� d% <'� SIR Fence Temporary Pedestrian /- ��\ Barricade NO LAND 0. TJRRANCE AT TAS LOCATl / TENNIS /., COURTS / IatAw NV EC! Outlet Protection / GIaeS B Stolle On / NCDOT Type 4 GeotexbTe Fabric TO, ­p, Sw9e Stone Equipment Crossing Ter Existing Sanitory Sewer 2' Thick Surge Stone on NCDOT Type 4 Geotextito Fabric / SIREAM NOTE: 1. THE EXCAVATION OF SOIL MAY NECESSITATE REPLACEMENT OF UTILI77ES. THEREFORE, A PUMP - AROUND OPERATION MAY BE UTILIZED. SOIL STABILIZATION TIMEFRAMES SITE DESCRIPTION STABILIZATION TIME TIMEFRAME EXCEPTIONS DB: 2444 PG; 790 ,NV ev M`7.na ow I NONE NO QUALITY WATER CHMZONES 7 BAYS NONE SLOPES STEEPER THAN 31 7 OPTS F SLOPES ARE NYOR LESS N LENOTN AND ARE NOT STEEPER THAN 21,14 DAYS ARE ALLOWED. SLOPES 31 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50'14 LENGTH. ALL OTHER AREAS ■TN SLOPES FLATTER TIWI V 14 DAYS NONE,EXCEPT FOR PERIMETERS AND KNOW ZpEL Limits of Disturbance'' \\'_1 \ _ -- — _ / (�4' AREA a, uRAaR'TWBRNCE \ -- ' � Nl •': / •:: _ Ak iNA \\ _�. Surge Temp. 75 ------ \ Stone Ca > \ / i Entrance .- ` \ / SEE �NbTE Tempora re ry S1t . l / , F \ .� _ Pipe Inlet . Protection a.� \ / t BASEBALL FIELD I X ' Ctl 4 / Tem Sgt, Fonpe. ra rR l � /\nE'r %3pyi/AI f6 / l Temporary /\ // •� d% <'� SIR Fence Temporary Pedestrian /- ��\ Barricade NO LAND 0. TJRRANCE AT TAS LOCATl / TENNIS /., COURTS / IatAw NV EC! Outlet Protection / GIaeS B Stolle On / NCDOT Type 4 GeotexbTe Fabric TO, ­p, Sw9e Stone Equipment Crossing Ter Existing Sanitory Sewer 2' Thick Surge Stone on NCDOT Type 4 Geotextito Fabric / SIREAM NOTE: 1. THE EXCAVATION OF SOIL MAY NECESSITATE REPLACEMENT OF UTILI77ES. THEREFORE, A PUMP - AROUND OPERATION MAY BE UTILIZED. SOIL STABILIZATION TIMEFRAMES SITE DESCRIPTION STABILIZATION TIME TIMEFRAME EXCEPTIONS PERIMETER OIRES, SWALM INICHES AND SLOPES 7 BAYS NONE NO QUALITY WATER CHMZONES 7 BAYS NONE SLOPES STEEPER THAN 31 7 OPTS F SLOPES ARE NYOR LESS N LENOTN AND ARE NOT STEEPER THAN 21,14 DAYS ARE ALLOWED. SLOPES 31 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50'14 LENGTH. ALL OTHER AREAS ■TN SLOPES FLATTER TIWI V 14 DAYS NONE,EXCEPT FOR PERIMETERS AND KNOW ZpEL LEGEND —_ PROPERTY LINES -- PERENNIAL STREAM /CREEK INTERMITTENT STREAM /DRAINAGE •��^ APPROXIMATE EDGE OF WOODED AREAS CONTOUR MAJOR --- - - - --- CONTOUR MINOR —�.— CHAINUNK FENCE UNE SANITARY SEWER LINE — so —_- STORM SEWER LINE — c -- GAS UNE — w WATER SUPPLY LINE �, - -- OVERHEAD ELECTRIC LINE ......_ T_....__ TELEPHONE LINE BUILDING/STRUCTURE _mot APPROXIMATE AREA TO BE EXCAVATED �— TEMPORARY Silt FENCE — — — LIMITS OF DISTURBANCE ­* ACCESS ROUTE DURING CONSTRUCTION A7® TYPE IN BARRICADE ® TEMPORARY SURGE STONE CONSTRUCTION ENTRANCE /CROSSING AWE SILT FENCE WATTLE BREAK ••. PIPE INLET PROTECTION 0 50 APPROX. SCALE. n. 8 er ®5 Y -c° a Y U i ° a a Y o ° Z SP E o e 6 ° Inp o 216 O F VN as¢ W Q M T I m B s m uTS B vl J LL_ f0 0 L Q Cu LL O U c a) tv c E U a E5 0 000 CU O o 'O =p O Z C N O co E O c o � U !n _ Z L 00 W U) Z LOL F— Z w 2 Z w J �a J Z Q � Z Z 00 0 w DATE. SEPT. 13.2013 PRDIECT N0. 31829DO5 SHEET C4.2 \ Temp. Surge St Georist. \ // xx . \ /• WO c UMPSTER / / �/ �� 1 \ \ • / �. Y > b Contractor must place Orange „ / _ \� /• / , // n U Prt-tf.n Fencing along tha /1 \�,.' "- \ /• /l / - I B ��e\\ � entire length o_ f adjacent �i� :I ; `,`` � .`'., ``" \ \ \ \ /"/ • • / / / « Eo ` ` prop-t fn how. a` i C _ ; / \ ` � S Limits of Disturba d e Temporary " d wative ,Temp Surge�Stone }Lquipm.nt Cro stag \ /. " r \ , \/3� ".`• {; __ `��_��w_ �r r Existing Sanitary Sewer \ /. ` Tel .Sure _`_�NCDOTk ypeg4 Gwtaxtra Fabric Stone Equipment« AREA OF LAND DISTURBANCE i /r •' / Crowing ^� - _/ 2.4786 ACRES I , AI /• d ✓" i / . Pump -Around �__�\ i - - /•/• / \ _ / _ / /; n Pump Temporary r �..�` T / 1 "( • / +'� / /',`!°s "' i Impervious D ke �, �; , � , / SEY BARRIERS WILL BE PLACED 1 '+ `` !t �` y/r _ %1- ., , 1 I r_ l / / / / ; TO DIVERT STREAM AROUND y 1 �J '+ r CONSTRUCTION AREA. BARRIER �u _ �) I � • . :, • ✓ � � � " t .- A � J -' - so sECnorls Iu T,. p. Surge St—e Equipment /Crassmg / - X _ _ ( \ / Y 'Y � "� / Temporary S (SEE SHEET � f i �. ` ` for E iMirn Sanitor We �u S " __EXPOSED SAN /TARP (. /NE �� 4 Y Cewer I _ _ - it \ /fl 03li6� -' / Bre �\ CROSSIfNC BRANCH `� 2' Thick Surge Stan. on / , f'/ '/' i l t ` ' \ NCDOT T s 4 Geotextile Fabric ' ' \ / AREA TO BE STABILIZED \ yP TH CLASS 1 RIP -RAP , 111 > / \ \ (SEE SHEET Z2) \ /. 1` r _, Y Limit. I" %' r'r , • ' j' ' / Dieu ce , \ V orb n `�.�,w v � I"� %� •/, ''y�• l gip / '�' V) z • r 4 ! / Z LIBERIA STREET 40'Po4V \r_- Q _ AREA TO () " . .r WITH TOE BOULDER '_ /:• 1, M 58 PG 70 \ , \. a\ ;,w� # PRO SHEET PB 40 PO 131 \ \ � ,\ (SEE SHEET 7.2J /• _ •Tr /,• / ; a' \ `�� \ ,: � , -� \ \\ /• _ ' ` ' /,� / % sir 7EMPORARY 1 FLEXIBLE HOSE V. /SUE TO LIM17ED EXCAVATION= NEAR THE STREAMBANK• THIS - CATE \ f \, '+ % \\ �' \=/ _ / ( / AREA OF STREAMBANK MAY m NOT BE DISTURBED. 1,EGEd0 m m Wattle , '\ N" - \\ / % / ` — PROPERTY LIES x v Break PERENNIAL STREAM /CREEK Temporory \ \- ,'S /'' _... SRt Fence �\ � Yr ' - - - INTERMITTENT STREAM /DRNNAGE � X', APPROXIMATE EDGE OF WOODED AREAS CONTOUR MAJOR LL CONTOUR MINOR 0 CHAINUNK FENCE LINE J LINE NOTES SANITARY SEWER LINE Y L Y ^` Y' T' _ • STREAMBANKS SHALL NOT BE DISTURBED UNTIL — STORM SEWER LINE ` co BARRIERS ARE ADEQUATELY INSTALLED. — c - -- GAS UNE IL . DEWATFJVIfVG ,ems / / / = ' a' n, w — WATER SUPPLY LINE O PUMP / % ( `�'�' • NO IL A JOINT P RMIT IS RECEIVED SHALL OCCUR — — OVERHEAD ELECTRIC UNE V UNTIL A JOINT PERMIT IS RECEIVED FROM C / USACE /DOUR. — TELEPHONE LINE \\ Limits of 1 / / "f [—j BUILDING /STRUCTURE C Disturbance c \ \ , +50 SPECIAL S`T?? C ° BASN _ p (SEE PROJECT SPECIAL PROVISIONS) UTILIZE A STABILIZED OUTLET INSTEAD +� �_ 1 APPROXIMATE AREA TO RE EXCAVATED :5 C (V N OF A SPECIAL S7ILUNG BASIN IF � + � Cu PUMPING CLEAN WATER. I t (INDUSTRIAL PSRG) ' - /mot'• SEQUENCE OF CONSTRUCTION FOR STREAM DIVERSION USING TEMPORARY CONCRETE BARRIER Z �' ✓ �� �''' • REINFORCED SILT FENCE: TEMPORARY SBt FENCE 'O O LIMITS OF DISTURBANCE C co cC 2`P VC = / \ TanParQY ✓' ='' %'= \ / 1. WORKING FROM THE STREAMBANK• INSTALL TEMPORARY CONCRETE BARRIER REINFORCED SILT FENIE. ACCESS ROUTE WRING CONSTRUCTION C 1 METHANE VENT l / ^� - ^( �O \ j\ Impervious Oike• %j; \ /• C 0 pp \ / 3+00 / \ S' 6' %" \ $ 2. ENSURE ALL BARRIERS ARE ADEQUATELY INSTALLED AND FUNCTIONING PROPERLY. ® TYPE III BARRICADE O U J \ _ ` 3. DEWATER THE WORKZONE; NON-TURBID SURGE STONE N RBIO WATER MAY BE DISCHARGED INTO THE CREEK; TURBID jYaf{IS ;;� \�77 '� :% /� WATER SHALL BE PUMPED THROUGH A TURBIDITY REDUCTION SNIP P PRIOR TO DISCHARGING INTO CONSTRUCTION ENTRANCE /CROSSING 2 Q Q o THE CREEK. I� SILT FENCE WATTLE BREAK W Z IL - -- PIPE INLET PROTECTION F TI P NAT EXCAVATE CAVATE ONLY AS NECESSARY WITHIN THE DESIGNATED PORTION O BARRIERS. AREA TO BE STABILIZED WITH VEGETATION N ( / 4 :,: , - \ \ 5. PERFORM TOE BOULDER PROTECTION AND STREAM BANK STABILIZATION. gZ5 AREA TO BE STABILIZED Cl) 6. REMOVE BARRIERS ONLY "EN STREAM BANKS ARE PROVIDED WITH A GROUNDCOVER SUITABLE TO WITH RIP -RAP QZ / \ r's s,���� / ✓, /,., � \ \ \.\ RESTRAIN EROSION. WITH TOE- BOULDER PROTECTION Y J \ tAedr /' Temporary \ Q Z / 'q✓ Pedestrian \ \ CO O / l �� /� eorrrcade cA DATE: SEPT. 13, 2013 / AZI ,(; O 20 4, % VV f � PlmJecr No. 31829005 APPROX. scAtE, n. SHEET c6.0 U1 ON CD C:) C) C) . ...\ \ � was op � � � �f � . Ul ZM H rz - 'U z Opp. g � \ |� � k�\ �m� \\� \ 2 a w • EC � � !® ) /,2m || X C3 ow Ln !,!t 0 (JI ci C3 CD Nj 2 a CD C3 C3 Ln REVISIONS Prepared by Erosion and Sediment Control Plan KM DESCRIP'nON DATE BY EROSION AND SEDIMENT Soil Remediation, Central Park LDFL DRAW BY: g CONTROL CROSS-SECTION NONCD O00078 2 TSH URS Corporation — North Carolina 1600 Perimeter Park Drive, Suite 400 �QIED By. j ----- — -- Morrisville, North Carolina 27560 Forsyth County, North Carolina cs ...... IL MINIMUM 10 GAUGE LINE WIRES — BOIE USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER N AREAS OF CONCENTRATED FLOW. • FOR REPAIR OF SILT FENCE FAILURES. USE No. 57 WASHED STONE FOR ANCHOR WHEN SILT FENCE IS PROTECTING CATCH BASIN. e MAXIMUM VARIABLE DIRE AS DIRECTED BY THE ENCNEER FRONT VIEW � STEEL POST T WO EN WIRE FABRIC TT, SILT FENCE FABRIC 3._0. Midrange Maximum FILL SLOPE 2 4 6 B 5 8 12 1 LRADEa" 10 *26' MINIMUM COVER B' -0OVER SKIRT 23 CHOR SKIRT AS RECTED SIDE ENGNEER VIEW 12 -1/2 GAUGE IATE WIRES GRADE NO.Ti: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW " I OF SILT FENCE NEEDS TO BE TURNED UPHILL 7. IT SEDIMENT DEEPER THAN 12' AND REP NR ANY UNDERMINING IMMEDIATELY. 4. FOR REPAIR OF SILT FENCE FAILURES, USE ND. 57 WASHED STONE FOR ANCHOR WHEN STET FENCE IS PROTECTING CATCH BASIN. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR PLACEMENT AND REMOVAL OF FENCE. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING DISTURBED AREAS TO PRE - CONSTRUCTION CONDITION. UPSTREAM END Oa STORM DEAN' PE TER BURY BOTT011 OF PLYWp00 BG.1E; -- - - - - -- I - 3/4' EXTERIOR ALL PARTIALLY COMPLETED STORM DUNS PLYWOOD SHALL BE PROTECTED AT THE END OF EACH DAY IN ACCORDANCE WTH TIffS AN E STEEL FENCE POST PLYWOOD INLET PRO TION DETAILS (TYPICAL) WASHED STONE FILTER ACROSS PIPE INLET — UPSTREAM END OF STORM DRAM II II II U U U u STONE FILTER INI ET PROTECTION STANDARD PIPE INLET PROTECTION (PLYWOOD I& YLATY V u W 1/3 PIPE DIAMETER NO Fes. I. IN A WELL DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6' ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 2. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND Sol FOUNDATION. PIPE 1t�A1i� N �� N ��_� SWTION"I FABRIC PEPE OUTLET TO FLAT AREA NO WELL - DEFINED CHANNEL STANDARD METAL POSTS 2'-0" IN GROUND �_ GALVANIZED HARDWARE WIRE STEEP CUT OR FILL SLOPE - -- — IBS'. T EXTENDS TO TOP OF BOX �- - 2 : I SLOPE (MAXIMUM) / w 0 M 57 WASHED STONE PLACED TO A HEIGHT OF 12' -18' MINIMUM ABOVE Top OF 80X STANDARD CATCH BASIN/YARD INLET PROTECTION TOP ELEVATION Di ST'OEMWA7ER -- 0.5' -1' 05 WASHED 6MAX DESIGN OF SPILLWAYS STONE I EXISTING SLOPE DRAINAGE AREA WEN LENGTH? jn� .. 1 (ACRES) (FT) I 4.0 /7 RIP -RAP 2 &0 VARIES 3 &0 4 10.0 SIDE VIEW 5 120 i DIMENSIONS SHOWN ARE MINIMUM i-EXISTING SLOPES N47E: HEIGHT t WIDTH DETERMINED BY 0.5' -1' ' 1 EXISTING TOPOGRAPHY AND SEDAIENT STORAGE REOUJI KEYED RP RAP KEY RIP RAP INTO THE DAM FOR STABILIZATION. /5 WASHED STONE FRONT VIFW STANDARD CHECK DAM °��tau 11�nR1 n nYl'n"i illRllnnu� �I IXO:11 �In n .�ynOLn-nl ' tr I F tl n n =rj >!• °II n °9i.�� °n =��lf II FIR °1f °)iler `�..1 �{�fi °7IInD(lnnnu� Alnnnli�lunnlR•, iM. �IS�i,4ir =ilfi��il� °�I�TI` In ImOn R�!` IIm7m�i� _a CHANNEL WITH CLASS I RIP RAP M2' EL CROSS SECTION - rer.Iwri plWFEND AND IDSW oN CONTROL NETTING. UPSLOPE TOE POSITIVE GRADE 1.Ox MAX 2' MINIMUM 510E SLOPES 2 : i (MAXIMUM) STEEP CUT OR FILL SLOPE PLAN VIEW STANDARD DIVERSION DITCH GRAVEL ENTRANCE SHALL BE 50 FEET IN LENGTH AND 20 FEET IN WIDTH WTH 20 FOOT RADIUS AT EXISTING ROADWAY 38•_0• MN 4' -0' 10' -0' 1 11 MIN. FILTER FABRIC 2 -3' T THI CKNESS WASHED STONE GRAVEL CONSTRUCTION ENTRANCE DESIGN Cl AGGREGATE SIZE - USE 2 -3 INCH WASHED STONE DIMENSION OF GRAVEL PAD THICKNESS - 6 INCHES MINIMUM WDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA WHICHEVER IS GREATER LENGTH - 50 FT. MINIMUM LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEIkWMG THE SITE AMC TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES AMD STEEP GRADES AND ENTRANCES AT CURVES IN PUSUC ROADS CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL GON51RUCTION ENTRANCES NOT INDICATED ON THE PLANS REWIRED FOR STAGING AND /OR BORROW AREAS AND MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWIIER. CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL ACCEPTANCE. STANDARD CONSTRUCTION ENTRANCE TABLE 1042 -1 ACCEPTANCE CRITERIA FOR RIP RAP AND STONE FOR EROSION CONTROL Class Re uired Stone Sizes, inches Minimum Midrange Maximum A 2 4 6 B 5 8 12 1 5 10 17 2 9 14 23 NO MORE THAN 5.0% OF THE MATERIAL FURNISHED CAN BE LESS THAN THE MINIMUM SIZE SPECIFIED NOR NO MORE THAN 10.0% OF THE MATERIAL CAN EXCEED THE MAXIMUM SIZE SPECIFIED. S g +o W N S ✓? =r T U N N = � pit e 4 . Z S a - y u 'n 2R4 U &f Kg3 � to G. G. O m .. m Y � � a J LL f�6 � �C O c a_ U m •- c E o N .0 co En i6 �O o p 15 CD Z C (CD CD cu E (=) t! o U En_Z x ° oO W UI) Z LL Z LU J c W W � Q � J ZO Q � OZ O OU w LLI DATE: SEPT. 13, 2013 PRoJECT N0. 31829005 SHEET C7.1 SEQUENCE OF CONSTRUCTION FOR TYPICAL WORK AREA 1. INSTALL SPECIAL STILUNG SASIN(S). 2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DEWATER ENTRAPPED AREA. AREA TO BE OEWATERED SHALL BE ECUAL TO ONE DAYS WORK. 5. PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLANS. 6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERMWS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS. AND TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM IMPERVIOUS DIKES FIRST). 7. ALL GRADING ANp STABILIZATION MUST BE COMPLETED IN DNE DAY M MIN THE PUMP AROUND AREAS BETWEEN THE IMPERVIOUS DIKES. THE IM PERMDUS DIKE LOCATIONS AS SHOWN ON THIS SHEET ONLY SHOW THE UPPER AND LOWER EXTENT OF WORK FOR EACH STREAM SEGMENT. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE LOCATION OF THE IMPERVIOUS DIKE(S) FOR EACH DAYS YORK. S. REMOVE SPECIAL STILLING BASIN(S) AND BACKFILL. STABILIZE DISTURBED AREA WITH SEED AND MULCH. SPECIAL STILLING BASIN WITH ROCK PAD SPECIAL STIILNG BASIN EXISTING TERRAIN 15.0 -20.0 FT. &0 - OF CLASS A STONE FILTER FABRIC STREAMS. SCALE: NTS NOTE: PROVIDE STABLIZED OUTLET TO STREAMBANK PUMP -AROUND TEMPORARY - FLEXIBLE HOSE TEMPORARY IMPERVIOUS DIKE SPECIAL STLUNG BASIN (SEE PROJECT SPECIAL PROVISIONS) UTILIZE A STABILIZED OUTLET INSTEAD OF A SPECIAL STIWNG BASIN IF PUMPING CLEAN WATER. PUMP- AROUND OPERATION TEMPORARY IMPERVIOUS DIKE EXISTING STREAM CHANNEL DEWATERING PUMP N4ff5 1.ALL EXCAVATION SHALL BE PERFORMED IN ONLY DRY OR ISOLATED SECTIONS DF CHANNEL. 2.I1APERVIOUS DIKES ARE TO BE USED TO ISCI-ATE WORK FROM STREAK ROW WHEN NECESSARY. 3. ALL GRADED AREAS SHALL BE STABILIZED WITHIN 24 HOURS. /.MAINTENANCE OF STREAM FLOW OPERATION S SHALL BE INCIDENTAL TO THE WORK. THIS INCLUDES POLYETHYLENE SHEETING. DIVERSICN PIPES. PUMPS AND HOSES 5.PUMPS AND HOSES SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. 6. SID ESLOPES OF RESTORED CHANNEL SHALL BE MATTED PRIOR TO TURNING WATER INTO CHANNEL SEE TYPICAL MATTING LDCATDN DETAIL ISOMETRIC VIEW CONCRETE BARRIER, TYPE 4 GE FN. - CLEAR STONE OR OTHER OBSTRUCTION TO CREATE A SEAL BETWEEN GECTEXTILE AND THE GROUND. HIRE TIE PLACE GEOTEXTILE IN LOCATIONS SHOWN OR AS GEOTEXTILE FOR DIRECTED. PLACE /j DRAINAGE DOUBLE FACED CONCRETE BARRIER ON TOP OF �� GEOTEXTLE PATH A MINIMUM I FOOT FROM THE BACK EDGE. WRAP GEOTEXTILE AROUND CONRETE BARRIER AND 1 FT MIN ,j /� FLOW SECURE THE ENDS WITH A WIRE TE OR OTHER APPROVED }} FASTENER. ,. AW STONE FOR EROSION CONTROL AT JUNCTION OF TEMPORARY CONCRETE BARRIER REINFORCED SILT FENCE AND SPECIAL SEDIMENT WNTRW FENCE KEEP RUNOFF FROM PASSING DIRECTLY THROUGH ANY GAPS. N41E3; 1. WORK SHALL BEGIN AT STA. 2 +50 AND PROGRESS HE TOWARDS STA. 0 +00. ,. jj 2. WORK MAY BE STAGED M 50' SECTIONS OR STAGED IN A SINGLE 25D' SECTION. 3. NO APPRECIABIE TIME WILL ELAPSE BETWEEN THE WORK CONSISTING OF EXCAVATION OF CONTAMINATED SOIL ' u ADJACENT TO THE STREAMBANK AND THE WORK FLOW CONSISTING OF STREAMBANK STABILIZATION. 4. STREAMBANK STABIUZATION YORK SHALL BE ' - CONSTRUCTED AND STABILIZED IN A MN11NUOUS MANNER. TEMPORARY CONCRETE BARRIER REINFORCED SII.T FENCE STABILIZE COMPACTED FILL SI WITH NATIVE VEGETATION AND N CDR MATTING PLACED BEHIND BOULDER AND TOE, AND WRAPPED OVER BACKFILL/TOPSOIL BOULDERS (SEE SIZING SPECIFICATION PACKA( BACKFILL WITH MIN. 2" 057 OR 05 STONE TOE BOULDER PROTECTION DETAIL ctedc bmw NOTES: USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. EXCAVATE A 1 TO 2 INCH TRENCH FOR YMTTLE TO BE PLACED. DO NOT PLACE WATTLE ON TOE OF SLOPE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLWE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH ENO TO SECURE IT TO THE SOIL. WATTLE INSTALLATION CAN BE ON OUTSIDE OF THE SILT FENCE AS DIRECTED. INSTALL TEMPORARY SILT FENCE IN ACCORDANCE WITH SECTION 1605 OF THE STANDARD SPECIFICATIONS. INSET A .I • 1 " -2" TRENCH FILL SLOPE 12" WATTLE //� SILT FENCE POST '��J'Tf>` UPSLOPE STAKE � 1 STAPLE STANDARD SILT FENCE WATTLE BREAK DETAIL SIDE VIEW Sacra r CI 1a tpIR�11MVn SW view =0t Ml." W'moo'°" 0 '— {m.WLMMM11r! or' 1 9 0 W MIORRAMIFII r TIMtAAd STANDARD RIP -RAP BANK STABQJZATION DETAIL Fraol vil -w SEE INSET A DOWNSLOPE STAKE O Dap S o 2 s V I t S n u Z 3 a` o L o E tea. ¢ o � 7 b Z O O Fa rn le w o m' I'd J C u- c Q Y 0 c a 0 c C ac: ) () E o O ONTO O o ago Z c N o (o E co:) E_ .o of 0 8 v)Z_ L O .O 0 P WcoZ Li cW Z G 0 W CO U) J Q < Q Q Z J 00 Fn of NO ~ w Z W 0 U DATE: SEPT. 13, 2013 PROJECT No. 31829005 SHEET C7.2 Q Gal Larr alomial a" r � 61! fit A a a 4sm alai aR rCWL' WANTING MAU AWNOMl M a.M i A01 Q m f /dialer � i1LI ■ Mishit f nisi a m IJW IP60 weer+¢ MUL w e sr 7r f w sur"a f rbw �II� Q IIailm SAM r1 f samm"m mammo lru1 IM SIM as r a 7r6M iO�aMMIf IRIARNWN� ii 7= v mv aaB.O■ f.i6a1R 1N,1R rr Waal aIa ealr m i AalAai r RMM 1N1� �aOEYIi roA a.al TIYlIN f"*L= fa0 r Oils SAWN !!fE s"Poss !w 7153 la�i Q r wa rr 7Tr rr TO 1i era® DETAIL 1 OF Z 1laraN� IiRa�aW � Seeding Zone 1 (Type 1) Spec6cations: Species Appleaton Rafe (b./ —.) Application Rate (6s /1,000 sq fl) Redto 3 Roughstak Blue ass 1 0.02 Rye Grain 60 1.4 Seeds%Zone 2 (Type 2) Specif —tn. Spec= APpkatsn Rate (lbstacre) Appkatsn Rate (6s /1 000 sq fl) Link BYNestem 3 0.07 Deertorgue, 3 0.07 Wildflower Mu* 1 0.02 Wheat 60 1A `Should include the 6gowing. Echnacea pvpurea, Rulbeckia hurter: Coreopss larceohaa; Asckpins tube msa: Coreopss Unctoria; and Imbm granulfolo Seeding spec6catum for al disturbed areas outside of the slmedinte restoration work area (e.g.. temporary access made. dewaterslg diversion pathways, stockpie and staging areas, etc,) Species APpkAto Appkation Rate NICK OAUll WATER RICO' ZONES —_ Rate (lbs/acm) (6s /1,000 sq fl) Rye Gras 40 0.92 Tak Fescue• 200 4.6 'Tag Fescue shall be from a seed variety with ow endophyte content, such as Stargrwer, Martin. M.—k -, Perag, —, Pk,-. Forager or an appmved DIVISION OF RI013T►AYS 9TA77T OF NORT 1 CAROLINA SOIL STABILIZATION HHEFRAMES SfTE DESCRIPTION STABILlZATAOM TIME TIMEFRAME EXCEPTIONS Pt"I'Mr R DIKES, SHALE ; an — AIMD SLDPES ♦ nsYS NOME NICK OAUll WATER RICO' ZONES —_ _— T DAYS TIE SLOPES STEEPER TRAIN U 7 DAYS f SLOPES ARE ar as LESS M LOnCt. Ala MIE NOT IT.— TRAM LLM DIMS AR ASAU- ROPES N OR FLATTER M DAYS 1 DAYS FOR SLOPES GREATER TKAN So. LLYA;rx. —ALL m1ER AAAS aTH SIaPES FLATrEE IRAN Y H DAYS MDIE, EAfEPI FOR PvAIETBrs M ION uNEs NDTES 1. ALL STONES ARE TO BE STRUCTURE STONE. 2. CAPS BETWEEN BOULDERS SHALL BE MINIMIZED BY FITTING SWIDERS TOGETHER, PLUGGING WITH STRUCTURE STONE CLASS A AND NO.57 AND UONG WITH TYPE 2 ENGINEERINO FABRIC. 3. DIMENSIONS AND SLOPES MAY BE AO,NSTED TO FIT BY THE DESIGNER. 4, A DOUBLE FOOTER BOULDER SHALL BE UTILIZED IN SAND BED MATERIAL. 5. FOOTER BOULDERS AND VANE BWLOERS SHALL BE NATIVE STONE OR SHOT ROCK, CUBICAL OR RECTANGULAR IN NATURE 6. FOOTERB SHALL BE AT OR BELOW MAOMUM SCOUR DEPTH. TYPE 2 ENGINEERING FABRIC SHALL PLACED BE ON THE UPSTREAM SIDE OF THE STRUCTURE TO PREVENT WASHOUT OF SEOMMT THROUGH BOULDER GAPS. TYPE 2 ENGINEERING FABRIC SHALL EXTETlD FROM THE BOTTOM OF THE FOOTER BOULDER TO THE FINISHED GRADE ELEVATION AND SHALL BE PLACED THE ENTIRE LENGTH GF STRUCTURE SLOPE OF VANE FROM CENTERDN TO TOP OF BANK SHALL BE 2 -7 1/3 OF PROPOSED 1/3 OF PROPOSED BANKFULL WIDTH BANKFULL WIDTH TYPE 2 ENGINEERING I FLOW I A FABRIC 20"_30 BACKFILL VAT" ` � I NO.57 STONE I V /` -- - -- TOP Of VANE BOULDER / A r /u \ WATER'S EDGE r I TOP OF BANK / V \1 j/ \ 1i / Y I — — �— I � SCOUR POOL FOOTER BOULDER j FILTER SLOPE OF VANE FROM CENTERLINE FABRIC TO TOP OF BANK SHALL BE OX FLOW StREAMBED y Ea, POOL FOOTER STONE STREAMBEO ELEV. SECTION A –A 1/3 OF PROPOSED 1/3 OF PROPOSED 1/3 O< PROPOSED BANKFULL WIDTH BANKFULL WIDTH BANKFULL WIDTH TOP OF SZE SHALL BE SETA INDIUM ABOVE BANKFULL ELEVATION AS SHOWN ON K –SEC . NO GAPS 1 BETWEEN ELEVATION eAN16uLL .. BTU ,n smNFSI vim r i / STREAMBED` -A ELEV. -- ___-��­FODTER BOULDERS WILL BE PLACED INTO THE E NOTE: A MINIIMUMNOF THEE TBOCK CROSS VANE MAY BE CONSIDERED CROSS SECTION DIAMETER DURING RESTORATION OF TRIBUTARY TO SALEM CREEK ROCK CROSS VANE 0 0 Dap p r vI i Z p s U 1 t B o `uZY a o z &.E U O 7 U) D z16 ova 5: u U W 0 C m 0 �j1 2 J cd � aJ Y O � c a L ++ C E U N .O QO cl) O cc E CD c ,o U ii _ Z 5 '0 0 6 W to z LL Z N 0 Ye 4 Q Lv J .�. Z muu U) U) uj O Z c- W v' x DATE: SEPT. 13, 2013 PROJECT No. 31829005 SHEET COD