HomeMy WebLinkAbout20211611 Ver 1_Pre-Filing Meeting Information_20211104Contact Name*
Contact Email Address*
Project Owner*
Project Name*
Project County*
Owner Address:*
Is this a transportation project?*
Robert Turnbull
robert.turnbull@terracon.com
Carolina Poultry Power RG2, LLC
Wilson Facility Access Road
►UTnI.T.7i
Street Address
3730 North Main Street
Address Line 2
aty
Farmville
Postal / Zip axle
27828
C Yes c: No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
F- Individual Permit F- Modification
F- Shoreline Stabilization
Does this project have an existing project ID#?*
C Yes (: No
State / Province / Pegion
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information.*
Carolina Poultry Power is proposing to construct an access road from
Old Stantonsburg Road to a proposed biomass power facility on City
of Wilson property, located at 35.685705,-77.889922. The e)asting
easement for the access road crosses a railroad before entering the
property. Due to the placement of the easement and the limitations
caused by the railroad, the access road will have to cross a potential
stream and its Neuse River Riparian Buffer. The project will also
include a water line crossing. As of the date of this submittal, a Buffer
Determination Request has not been submitted to DWR, but will be
prior to submittal of any permit applications.
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that Icannot submit myapplication until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
Submittal Date 7/23/2021