Loading...
HomeMy WebLinkAbout20211611 Ver 1_Pre-Filing Meeting Information_20211104Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address:* Is this a transportation project?* Robert Turnbull robert.turnbull@terracon.com Carolina Poultry Power RG2, LLC Wilson Facility Access Road ►UTnI.T.7i Street Address 3730 North Main Street Address Line 2 aty Farmville Postal / Zip axle 27828 C Yes c: No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express F- Individual Permit F- Modification F- Shoreline Stabilization Does this project have an existing project ID#?* C Yes (: No State / Province / Pegion NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* Carolina Poultry Power is proposing to construct an access road from Old Stantonsburg Road to a proposed biomass power facility on City of Wilson property, located at 35.685705,-77.889922. The e)asting easement for the access road crosses a railroad before entering the property. Due to the placement of the easement and the limitations caused by the railroad, the access road will have to cross a potential stream and its Neuse River Riparian Buffer. The project will also include a water line crossing. As of the date of this submittal, a Buffer Determination Request has not been submitted to DWR, but will be prior to submittal of any permit applications. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that Icannot submit myapplication until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature * Submittal Date 7/23/2021