Pre -Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
June 1, 2021 Ver 4.1
Initial Review
Has this project met the requirements for acceptance in to the review process?*
Yes
No
Is this project a public transportation project?*
Yes No
Change only if needed.
BIMS # Assigned*
20211611
Is a payment required for this project?
No payment required
Fee received
Fee needed - send electronic notification
Select Project Reviewer*
Colleen Cohn:eads\cmcohn
Information for Initial Review
1a. Name of project:
COURTESY COPY Stockport Limited Partnership
la. Who is the Primary Contact?*
Richard Deming
1 b. Primary Contact Email:
rich@prg-Ilc.com
Date Submitted
11/4/2021
Nearest Body of Water
Hominy Swamp
Basin
Neuse
Water Classification
C;Sw,NSW
Site Coordinates
Latitude:
35.68584
A. Processing Information
County (or Counties) where the project is located:
Wilson
Is this a NCDMS Project
Yes No
Is this project a public transportation project?*
Yes No
Pre -Filing Meeting Information
Longitude:
-77.88986
Version# *
1
Reviewing Office*
Raleigh Regional Office - (919) 791-4200
1c. Primary Contact Phone:*
(202)350-0350
u
Is this a courtesy copy notification?*
Yes No
ID#
Version
Pre -fling Meeting or Request Date
7/23/2021
Attach documentation of Pre -Filing Meeting Request here:
Click the upload button or drag and drop files here to attach document
DWR Pre -Filing Meeting Request Form.pdf
File type must be PDF
1a. Type(s) of approval sought from the Corps:
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Has this PCN previously been submitted?
Yes
No
1 b. What type(s) of permit(s) do you wish to seek authorization?
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
Yes No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
401 Water Quality Certification - Regular
Non-404 Jurisdictional General Permit
Individual 401 Water Quality Certification
39 - Commercial/Institutional Developments
le. Is this notification solely for the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
1f. Is this an after -the -fact permit application?"
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
Yes No
1 h. Is the project located in any of NC's twenty coastal counties?
Yes No
1j. Is the project located in a designated trout watershed?
Yes No
B. Applicant Information
1d. Who is applying for the permit?
Owner Applicant (other than owner)
le. Is there an Agent/Consultant for this project?"
Yes No
2. Owner Information
2a. Name(s) on recorded deed:
City of Wilson
2b. Deed book and page no.:
50.28KB
401 Water Quality Certification - Express
Riparian Buffer Authorization
Yes No
Yes No
2c. Contact Person:
Harry Tyson
2d.Address
Street Address
1800 Herring Avenue
Address Line 2
City
Wilson
Postal / Zip Code
27894
2e. Telephone Number:
(252)399-3461
2g. Email Address:*
htyson@wilsonnc.org
3. Applicant Information (if different from owner)
3a. Name:
Richard Deming
3b. Business Name:
Carolina Poultry Power RG2, U-C
3c.Address
Street Address
3730 N Main Street
Address Line 2
City
Farmville
Postal / Zip Code
27828
3d. Telephone Number:
(202)350-0350
3f. Email Address:
rich@prg-Ilc.com
4. Agent/Consultant (if applicable)
4a. Name:
Robert Turnbull
4b. Business Name:
Terracon Consultants, Inc.
4c.Address
Street Address
2401 Brentwood Road
Address Line 2
Suite 107
City
Raleigh
Postal / Zip Code
27604
4d. Telephone Number:
(919)617-9153
4f. Email Address:*
robert.turnbull@terracon.com
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
1c. Nearest municipality / town:
Wilson
State / Province / Region
INC
Country
USA
2f. Fax Number:
State / Province / Region
NC
Country
USA
3e. Fax Number:
State / Province / Region
NC
Country
USA
4e. Fax Number:
2. Proiect Identification
2a. Property Identification Number:
3720-86-1702.000
2b. Property size:
239.45
2c. Project Address
Street Address
3100 Stantonsburg Road SE
Address Line 2
City
Wilson
Postal / Zip Code
27894
3. Surface Waters
3a. Name of the nearest body of water to proposed project:
Hominy Swamp
3b. Water Resources Classification of nearest receiving water:*
C;Sw,NSW
3c. What river basin(s) is your project located in?*
Neuse
3d. Please provide the 12-digit HUC in which the project is located.
030202030403
4. Project Description and History
State / Province / Region
NC
Country
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: *
The project study area and vicinity consist of existing industrial, agricultural, and rural residential areas on the south side of the City of Wilson. The City of Wilson property consists of an
existing wastewater treatment facility, including sprayfields. The study area for this submittal consists of the access/utility easement from Stantonsburg Road to an existing sprayfield. A
biomass energy facility is proposed to be constructed within the sprayfield. The access/utility easement crosses an existing Norfolk Southern Railroad easement.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
• Yes No Unknown
If yes, please give the DWR Certification number or the Corps Action ID (exp. SAW-0000-00000).
DWR NBRRO #21-257
4f. List the total estimated acreage of all existing wetlands on the property:
0
4g. List the total estimated linear feet of all existing streams on the property:
150 ft.
4h. Explain the purpose of the proposed project: *
The purpose of the project is to construct an access road and to install utilities within an existing City of Wilson access/utility easement from Stantonsburg Road to a biomass energy
facility (not yet constructed).
41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:
The proposed project will include an access road and utility installation within the existing easement from Stantonsburg Road to the biomass energy facility site. The easement location
was previously determined by the City of Wilson and coordinated with Norfolk Southern Railroad. A culvert will be placed in the UT to Hominy Swamp. Road construction equipment will be
used during construction. Equipment will be stored in upland areas.
5. Jurisdictional Determinations
5a. Have the wetlands or streams been delineated on the property or proposed impact areas?*
Yes No
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
Preliminary Approved Not Verified Unknown N/A
Corps AID Number:
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): Robert Turnbull
Agency/Consultant Company: Terracon Consultants, Inc.
Other:
6. Future Project Plans
Unknown
6a. Is this a phased project?*
Yes No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity?
No.
D. Proposed Impacts Inventory
1. Impacts Summary
1a. Where are the impacts associated with your project? (check all that apply):
Wetlands Streams -tributaries Buffers
Open Waters Pond Construction
3. Stream Impacts
11
S7
3a. Reason for impact (?)
Access Road/Utilities
3b.lmpact type*
Permanent
3c. Type of impact*
Culvert :]Fo
3d. S. name*
Hominy Swamp
3e. Stream Type*
)
Jurisdictional Ditch
3f. Type of
Jurisdiction*
Corps
3g. S. width*
Average (feet)
3h. Impact
length*
40
Qinear feet)
S2
Access Road/Utility
Construction
Temporary
Culvert
UT to Hominy Swamp
Jurisdictional Ditch
Corps
Average (feet)
80
pinear teeq
31. Total jurisdictional ditch impact in square feet:
360
31. Total permanent stream impacts: 3i. Total temporary stream impacts:
40 80
31. Total stream and ditch impacts:
120
3j. Comments
E. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The culvert length is the minimum needed to provide adequate access to the future biomass energy facility. The access/utility easement location was
pre-existing to the project and negotiated with Norfolk Southern Railroad. There are no practicable alternative locations for the road to enter the site. The
access road will cross the UT to Hominy Swamp at a perpendicular angle.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
All applicable erosion and sediment control measures will be put in place and maintained according to current regulations. Any spoil material will be
placed in upland areas and excess material will be removed from the site. All in -stream work will occur in the dry.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
Yes No
2b. If this project DOES NOT require Compensatory Mitigation, explain why:
Permanent impacts to jurisdictional ditch is <0.02 acre.
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
Yes No
What type of SCM are you providing?
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Other SCM that removes minimum 30 % nitrogen
Proposed project will not create concentrated stormwater flow through the buffer
2. Stormwater Management Plan
U
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? *
Yes No
2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)?
Yes No
2c. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state -approved local government stormwater program?
Yes No
N/A - project disturbs < 1 acre
2d. Which of the following stormwater management program(s) apply:
Local Government State
Local Government Stormwater Programs
Phase II NSW USMP Water Supply
Please identify which local government stormwater program you are using.
City of Wilson
Comments:
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/statellocal) funds or the use of public (federal/state) land?"
Yes No
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
Yes No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?
Yes No
3b. If you answered "no," provide a short narrative description.
The proposed project will result in no additional future impacts or development and will not result in any downstream impacts or growth -stimulating
effects. The existing use of Hominy Swamp (C;Sw,NSW) should not change as a result of this project.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
Yes No N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?
Yes No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
Yes No
5d. Is another Federal agency involved?*
Yes No Unknown
5e. Is this a DOT project located within Division's 1-8?
Yes No
5f. Will you cut any trees in order to conduct the work in waters of the U.S.?
Yes No
5g. Does this project involve bridge maintenance or removal?
Yes No
Sh. Does this project involve the construction/installation of a wind turbine(s)?*
Yes No
5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.?
Yes No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
USFWSIPaC
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
Yes No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
hftp://www.habitat.noaa.gov/protection/efhmapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
Yes No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
Online SHPO GIS mapping
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
Yes No
8c. What source(s) did you use to make the floodplain determination?*
https://fris.nc.gov
Miscellaneous
Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when
possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred.
Click the upload button or drag and drop files here to attach document
Stockport PCN Attachments.pdf 15.68MB
File must be PDF or KMZ
Comments
A utility easement associated with this facility is also proposed to cross the tributary to the north of the biomass energy site (Feature TA shown on DWR Buffer Determination Letter). That
crossing will be aerial, will not impact the stream channel, and will be below the width thresholds required for a written riparian buffer authorization.
Signature
By checking the box and signing below, I certify that:
The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Robert Turnbull
Signature
Date
11/4/2021