Loading...
HomeMy WebLinkAboutNCC216149_ESC Approval Submitted_20211104ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality October 29, 2021 LETTER OF APPROVAL WITH MODIFICATION Bottego Enterprises, Inc. ATTN: Mr. Alfred D. Bottego 2553 US 70 Hwy Swannanoa, NC 28778 RE: Project Name: Meranda Acres Approved: 0.50 Project ID: BURKE-2022-017 County: Burke City: Morganton Address: W. Moonlight PI River Basin: Broad Stream Classification: WS-IV, B, CA Submitted By: Mr. Alfred D. Bottego Date Originally Received by LQS: October 21, 2021 Date Revision Received by LQS: October 29, 2021 Plan Type: Residential Dear Mr. Bottego, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modification and hereby issue this letter of Approval with Modification. The Modification Required for Approval is listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Paul Clark at D � North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 KOa7ri GMOiJN14 oeoa en�o�fnwrcnmenta�a�a�\ 828,296.4500 Letter of Approval with Modification Bottego Enterprises, Inc. ATTN: Mr. Alfred D. Bottego October 29, 2021 Page 2 of 3 Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. S' er i ael Smith Assi tant Regio 1 ngineer Division of Energy, Mineral, and Land Resources Letter of Approval with Modification Bottego Enterprises, Inc. ATTN: Mr. Alfred D. Bottego October 29, 2021 Page 3 of 3 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications ec: Mr. Alfred D. Bottego alfredb@craftandsteel.com cc: Regional Office file MODIFICATION REQUIRED FOR APPROVAL Project Name: Meranda Project ID: BURKE-2022-017 County: Burke For final plan approval when available, please provide to this office the requested information listed below. 1. After filing the electronic Notice of Intent (e-NOI), please provide to this office the number of the Certificate of Coverage (COC) issued by the NCDEQ Stormwater Department. {NCG010000}. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities CD owe 0 O-ew O oeeea p � � peed" c� C N IrD O ~ p CD Pet CD Lm+ CD ell ol c y [ V V � (ee� � �• ry � rs' � CD �. et rD c M IrD 7 O � a 1 CD ► O �p -{ u '• 4 b ® Pb 1� ul owe p J rIN e� pe, CD w • C owe peed • �eemk Fell wCD �. O• n G o CD [D CD r eD Owe