HomeMy WebLinkAboutRegional General Permit #50 (NCDOT SR 2528 (Julian Road) Rowan Co_ TIP U-5738_DWR
Wanucha, Dave
From:Euliss, Amy
Sent:Thursday, November 4, 2021 9:12 AM
To:Wanucha, Dave
Subject:Regional General Permit #50 (NCDOT SR 2528 (Julian Road) Rowan Co. TIP U-5738
_DWR
Andy and I talked about these. We requested the temporary impacts for site 1B and 5A as bank stabilization because
we are dewatering to install the bank stabilization. As long as the impact numbers and the type (temporary vs.
permanent) are the same, we’ll be fine. Regarding site 2D, we asked for permanent mechanized clearing in order to
dewater the stream that flows through the wetlands. We asked for the wetland impact to be permanent because it was
so small that it might be hard to ensure that its not disturbed. As long as he called it a permanent impact to the
wetland, we’re also ok. If this doesn’t make sense, we can discuss on the phone.
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Thursday, November 4, 2021 8:55 AM
To: Euliss, Amy <aeuliss@ncdot.gov>
Subject: RE: \[External\] Corps of Engineers SAW-2016-01370 Regional General Permit #50 (NCDOT SR 2528 (Julian Road)
Div 9 Rowan Co. TIP U-5738)
Amy,
Some of the Corps impact data/descriptions in their verification are different from what is in your
application. Just want to make sure we’re on the same page before I send 401 out for signature or if the
Corps made some typos. Most I caught are below.
Sie 1B -- 75’ for dewatering vs. bank stabilization
Site 5A -- 78’ for dewatering vs. bank stabilization
Site 2D – dewatering vs. mech clearing
Let me know if the data you submitted are correct as requested. Thanks.
Dave W.
Division of Water Resources
401 & Buffer Transportation Permitting
NCDOT Divisions 9 and 11
NC Department of Environmental Quality
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Wednesday, November 3, 2021 2:16 PM
1
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: FW: \[External\] Corps of Engineers SAW-2016-01370 Regional General Permit #50 (NCDOT SR 2528 (Julian Road)
Div 9 Rowan Co. TIP U-5738)
From: Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>
Sent: Wednesday, November 3, 2021 2:11 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Bob Lepsic <BLepsic@sepiengineering.com>; Tugwell, Todd J CIV USARMY CESAW (US)
<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Harmon, Beth
<beth.harmon@ncdenr.gov>; Williams, Andrew E CIV USARMY CESAW (USA) <Andrew.E.Williams2@usace.army.mil>
Subject: \[External\] Corps of Engineers SAW-2016-01370 Regional General Permit #50 (NCDOT SR 2528 (Julian Road) Div
9 Rowan Co. TIP U-5738)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Amy:
Attached to this message is your requested Section 404 permit authorizations for the following project:
SAW-2016-01370 Regional General Permit #50 (NCDOT SR 2528 (Julian Road) Div 9 Rowan Co. TIP U-5738)
Also attached are the corresponding special conditions, a mitigation responsibility transfer form and a copy of the
permit compliance certification.
Please note that the attached conditions must be strictly adhered to in order for this permit authorization to remain
valid and that the compliance certification must be returned to this office when the work is completed.
This electronic copy is your official Department of the Army Notification; no paper copy will be mailed, unless
specifically requested.
Please contact me if you have any questions or concerns regarding this permit verification. Thanks.
Andrew Williams
Regulatory Project Manager
Regulatory Division Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Office Tel: (919) 554-4884, x26
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at our website at
https://regulatory.ops.usace.army.mil/customer-service-survey/
to complete the survey online.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2