Loading...
HomeMy WebLinkAbout20211336 Ver 1_More Info Received_20211104 Wanucha, Dave From:Carrie Caviness <carrie.caviness.1@gmail.com> Sent:Thursday, November 4, 2021 10:09 AM To:Wanucha, Dave Subject:B-5979 Hunting Hills Bridge_Towns Consultant CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. See Amanda's response regarding submission. Will this project be non-notifying for DWR as well? Thanks, Carrie Carrie Caviness, PhD Interface Environmental Consulting, LLC. 476 Hidden Pond Rd Boone, NC 28607 (919) 656-4543 To help prot ect your priva cy, … ---------- Forwarded message --------- From: Fuemmeler, Amanda J CIV (USA) <Amanda.Jones@usace.army.mil> Date: Mon, Nov 1, 2021 at 9:53 AM Subject: RE: \[Non-DoD Source\] B-5979 Hunting Hills Bridge (Boone, NC) To: Carrie Caviness <carrie.caviness.1@gmail.com> Hi Carrie, Based on the information below, you do not need to submit a PCN and are covered under non-notifying NWP 13 & 33. I would recommended double-checking the bridge as construction gets closer to make sure no new roosts under the bridge just in case. Amanda Jones 828-271-7980 ext. 4225 1 From: Carrie Caviness <carrie.caviness.1@gmail.com> Sent: Thursday, October 28, 2021 3:00 PM To: Fuemmeler, Amanda J CIV (USA) <Amanda.Jones@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Subject: \[Non-DoD Source\] B-5979 Hunting Hills Bridge (Boone, NC) Good afternoon- You may have already been alerted by Lori Beckwith and/or Dave Wanaucha about this project coming your way. The Town of Boone is proposing to replace Bridge #346 on Hunting Hills Lane. They have been assisted throughout the planning, NEPA, and permitting process by DOT, but this is not a DOT project. Kevin Hining with Division 11 had me submit an epcn to them yesterday (as a ncdot project); but then they collectively decided this was incorrect since the TOB is the owner and in charge of the project. I've told Kevin that this project, in my opinion, may fall under a non-notifying situation, but we submitted anyway since there is the NLEB issue. Please confirm the NW/GC are correct and advise on if we are notifying/non-notifying. Maps are attached as well as pertinent correspondence. Project impacts: Trout watershed, South Fork New River mainstem Bridge to be replaced almost exactly in place in phases (closed loop neighborhood). 26lf of new permanent impact in the form of riprap bank stabilization adjacent to 25lf of existing (NW13, GC4134) 51lf of temporary construction impacts in the form of dewatering and causeway (NTE 50% of stream channel) (NW33, GC414) No work proposed during trout moratorium, although USFWS has rec'd taking out the few necessary trees before 04/01 although they are generally in the 25' buffer. T/E I did a tree and bridge survey a couple years ago. No evidence of roosting in the structure or riparian buffer. Not really any suitable trees in terms of bark or cavities. Surveyed for all other potential T/E species for the Natural Resources Technical Report that accompanies the approved Categorical Exclusion. And we had Lori Williams out to do a Hellbender survey this summer and they concluded no other survey was necessary. Also, scoping was performed for Historic Properties and Archeology via NCDOT. Documentation is attached. 2 Please be in touch at your convenience. Thanks, Carrie Carrie Caviness, PhD Interface Environmental Consulting, LLC. 476 Hidden Pond Rd Boone, NC 28607 (919) 656-4543 3