Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GW1-2021-06143_Well Construction - GW1_20211025
Pfinlll RM WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Chris King 14.WATER ZONES Well Contractor Name ni O DESCRIPTION 2080-A ft. NC Well Contractor Certification Number 15.OUTER CASING for multi cased wells OR LINER da livable Aqua Drill, Inc. FROM TO DIAMETER THICKNESS MATERIAL Company Name 0 ft t;z It. in. 512IZ,�Z/ 1 /6/ Ce X f Va ���/f A6.INNER CASING OR TUBING eotbermal elosed-loo 2.Well Construction Permit# U FROM I To I DIAMETER THICKNESS MATERAAI List all applicable well construction permits r.e.UIG County,State,Variance,etc.) IL It. in. 3.Well Use(check well use): k' ft. in. 47.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL Agricultural 13Municipal/Public ft. ft. in. Geothermal(Heatingicooling Supply) g esidential Water Supply(single) ft. ft. in• 'lndustrial/Commercial esidential Water Supply(shared) 18.GROUT Irfi ation FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: © ft. ft s C Monitoring Recovery ft. ft. Injection Well: ft. ft.Aquifer Recharge Groundwater Remediation 19:SAND/GRAVELYACK'ifa" liceble Aquifer Storage and Recovery Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD Aquifer Test [3Stormwater Drainage ft. ft. Experimental Technology Subsidence Control ft. ft. Geothermal(Closed Loop) [3Tracer 20.DRILLING LOG attach additional sheets if necessary) Geothermal(Heating/CoolingReturn Other(explain under#21 Remarks FROM TO DESCRIPTION color,hardacss soiUrock a is s' etc O e. G rL 4.Date Well(s)Completed: Well ID# t� ft. s rL d )z oG 5a.Well Location: S` ft. S 7 G� -'/ t C ft. ft. Facility/Owner Name Facility ID#(if applicable) ft. ft. �9-26 F/a f a -1°,C 14d, ,�e,��v�tLry- it. FL Physical Address,City,and Zip '2?2 o 9 ft. ft. 21 REMARKS QEes County Parcel Identification No.(PIN) DWR SBcbon 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if welt field,one lat/long is sufficient) 22.Certifica'on: 6.Is(are)the well(s)&Permanent or 13Temporary Signature ofCerti ted Well Contractblr Date By signing this form,1 hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: CJYes or [3No with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a lfthis is a repair,fill out known well construction information and explain the nature of the copy of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled: SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: (B) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifdifferent(example-3@200'and 1@1001 construction to the following: 10.Static water level below top of casing: a y (ft.) Division of Water Resources,Information Processing Unit, Ifwater level is above casing,use"+^ 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: (in.) 24b.For Infection Wells: In addition to sending the form to the address in 24a above,also submit one copy of this form within 30 days of completion of well 12.Well construction method: A7/'2 Li/Z i / construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, [13a. WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 276994636 Yield(gpm) Method of test: 24c.For Water Supply&Injection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of Disinfection type: Amount:e Z completion of well construction to the county health department of the county where constructed. , Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources, Revised 2-22-2016