Barnett, Kevin H
From:McHenry, David G
Sent:Tuesday, July 13, 2021 4:15 PM
To:Jamison, Wesley A; Higdon, Garrett B
Cc:Barnett, Kevin H
Subject:FW: HA call for Haywwod Bridge 237 - need to rescreen maybe
FYI,
SHPO no concern with whole pond removal.
From: McHenry, David G
Sent: Tuesday, July 13, 2021 4:14 PM
To: Reap, Shelby L <slreap@ncdot.gov>
Subject: RE: HA call for Haywwod Bridge 237 ‐ need to rescreen maybe
Good, I thought she had said the pond was not contributory, but did not want to assume.
Thanks Shelby
From: Reap, Shelby L <slreap@ncdot.gov>
Sent: Tuesday, July 13, 2021 4:11 PM
To: McHenry, David G <dgmchenry@ncdot.gov>
Subject: Re: HA call for Haywwod Bridge 237 ‐ need to rescreen maybe
Hi Dave
Renee says we do not need to revisit effects. Sorry for the delay getting you an answer but a good outcome.
Let me know if you need anything more official.
Shelby
From: McHenry, David G <dgmchenry@ncdot.gov>
Sent: Tuesday, June 22, 2021 1:54:26 PM
To: Reap, Shelby L <slreap@ncdot.gov>
Subject: RE: HA call for Haywwod Bridge 237 ‐ need to rescreen maybe
Thanks Shelby. If the meeting goes bad then please don’t ask her today ਐਓ.
From: Reap, Shelby L <slreap@ncdot.gov>
Sent: Tuesday, June 22, 2021 1:53 PM
To: McHenry, David G <dgmchenry@ncdot.gov>
Cc: Higdon, Garrett B <gbhigdon@ncdot.gov>; Barnett, Kevin H <khbarnett@ncdot.gov>; Lynn A. Kieselhorst
<lamann@Vaughnmelton.com>; Jamison, Wesley A <wjamison@ncdot.gov>
Subject: RE: HA call for Haywwod Bridge 237 ‐ need to rescreen maybe
2
I’m about to go into a meeting with her. I’ll catch her after and remind her.
Shelby
From: McHenry, David G <dgmchenry@ncdot.gov>
Sent: Tuesday, June 22, 2021 1:51 PM
To: Reap, Shelby L <slreap@ncdot.gov>
Cc: Higdon, Garrett B <gbhigdon@ncdot.gov>; Barnett, Kevin H <khbarnett@ncdot.gov>; Lynn A. Kieselhorst
<lamann@Vaughnmelton.com>; Jamison, Wesley A <wjamison@ncdot.gov>
Subject: RE: HA call for Haywwod Bridge 237 ‐ need to rescreen maybe
Hey Shelby,
Sorry to be a bother cause I know you are busy but just wanted to see if you had the chance to check with Renee.
Thanks for any help.
Dave
From: McHenry, David G
Sent: Wednesday, May 26, 2021 2:14 PM
To: Reap, Shelby L <slreap@ncdot.gov>
Cc: Higdon, Garrett B <gbhigdon@ncdot.gov>; Barnett, Kevin H <khbarnett@ncdot.gov>; Lynn A. Kieselhorst
<lamann@Vaughnmelton.com>; Jamison, Wesley A <wjamison@ncdot.gov>
Subject: RE: HA call for Haywwod Bridge 237 ‐ need to rescreen maybe
My understanding, in layman’s terms, is fear because on right side of plan sheet at cross‐hatching is the main part of the
earthen dam and it will be cut into partially for the new road alignment. The fear is liability of compromising the
integrity of the impoundment. Why we did not consider this earlier, I do not know.
Thanks Shelby.
From: Reap, Shelby L <slreap@ncdot.gov>
Sent: Wednesday, May 26, 2021 1:46 PM
To: McHenry, David G <dgmchenry@ncdot.gov>
Cc: Higdon, Garrett B <gbhigdon@ncdot.gov>; Barnett, Kevin H <khbarnett@ncdot.gov>; Lynn A. Kieselhorst
<lamann@Vaughnmelton.com>; Jamison, Wesley A <wjamison@ncdot.gov>
Subject: RE: HA call for Haywwod Bridge 237 ‐ need to rescreen maybe
Hi Dave
Let me talk with Renee about it. She is on vacation this week so as soon as I hear back from her I will let you know. She
will ask me why you need to remove the pond. What should I say?
Shelby
From: McHenry, David G <dgmchenry@ncdot.gov>
Sent: Wednesday, May 26, 2021 11:57 AM
To: Reap, Shelby L <slreap@ncdot.gov>
Cc: Higdon, Garrett B <gbhigdon@ncdot.gov>; Barnett, Kevin H <khbarnett@ncdot.gov>; Lynn A. Kieselhorst
3
<lamann@Vaughnmelton.com>; Jamison, Wesley A <wjamison@ncdot.gov>
Subject: HA call for Haywwod Bridge 237 ‐ need to rescreen maybe
Hey Shelby,
Hope you are well. We need help please. Some time ago we got a no effect on this bridge replacement (see attached),
but plans have changed to include a much larger easement and complete removal of a pond. Screen shot of 75% is
beloe and full plans at Haywood 237 75%. Will we need to revisit this with Renee?
Also, though I believe this is insignificant, we will be putting a temporary overhead power along the road, but I believe
that it will remain in the TCE and other easements originally shown in the effect meeting. I don’t believe Renee had any
questions about utilities anyway, but that was indeed long ago.
Thanks. Appreciate any help.
Dave