Loading...
HomeMy WebLinkAbout20210209 Ver 2_ePCN Application_20211102 DW R Divi.ha of ware.Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver 4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS#Assigned* Version#* 20210209 2 Is a payment required for this project?* No payment required Fee received Reviewing Office* Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review 1a.Name of project: Haywood Bridge 237 Replacement la.Who is the Primary Contact?* Dave McHenry 1 b.Primary Contact Email:* 1c.Primary Contact Phone:* dgmchenry@ncdot.gov (828)586-2141 Date Submitted 11/2/2021 Nearest Body of Water Sorrell Creek Basin French Broad Water Classification WS-III Tr Site Coordinates Latitude: Longitude: 35.400767 -83.897838 A. Processing Information u County(or Counties)where the project is located: Haywood Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: 17Bp.14.R.177 WBS#(?) 17BP.14.R.177 Pre-Filing Meeting Information Is this a courtesy copy notification?" Yes No ID# Version 20210209 1 Pre-fling Meeting or Request Date 11/2/2021 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach document DWR Pre-Filing Meeting Request Form.pdf 55.84KB File type must be PDF 1a.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* Yes No Please provide the date of the previous submission.* 9/10/2021 1 b.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(N W P) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? Yes No Regional General Permit(RGP)Number: 201902350-Work associated with bridge construction,widening,replacement,and interchanges RGP Numbers(for multiple RGPS): 1d.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?* Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1 h.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? • Yes No B. Applicant Information 1d.Who is applying for the permit? Owner Applicant(other than owner) le.Is there an Agent/Consultant for this project?* Yes No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT Division 14 2b.Deed book and page no.: 2c.Contact Person: Dave McHenry 2d.Address Street Address 253 Webster Road Address Line 2 City State/Province/Region Sylva NC Postal/Zip Code Country 28779 USA 2e.Telephone Number: 2f.Fax Number: (828)586-2141 2g.Email Address:* dgmchenry@ncdot.gov 3.Applicant Information(if different from owner) 3a.Name: NCDOT Division 14 3b.Business Name: 3c.Address Street Address 253 Webster Road Address Line 2 City State/Province/Region Sylva NC Postal/Zip Code Country 28779 USA 3d.Telephone Number: 3e.Fax Number: (828)586-2141 3f.Email Address:* dgmchenry@ncdot.gov C. Project Information and Prior Project History 1.Project Information 1 b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Canton 2.Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 City State/Province/Region Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:' Sorrell Creek 3b.Water Resources Classification of nearest receiving water:* WS-III Tr 3c. What river basin(s)is your project located in?* French Broad 3d.Please provide the 12-digit HUC in which the project is located. 06010106010020 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project involves replacing a timber bridge on location with a concrete structure. The area around the bridge is residential with a considerably forested watershead. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* Yes No Unknown If yes,please give the DWR Certification number or the Corps Action ID(exp.SAW-0000-00000). 20210209 The Corps has not issued at the time of this permit modification request. 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 600 4h.Explain the purpose of the proposed project: The purpose of the project is to replace a deteriorating and obsolete bridge(430237)on SR 1128 in Haywood County. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used: Note this application is a resubmittal due to plan change and need for a DWR certification modification. The existing bridge will be cut in half and the new bridge constructed in stages.The new bridge will require temporary dewatering,as needed,and rip rap placement at pipe outlets and under the bridge in front of the abutments and wingwall extension.The wingwall extension and rip rap toe are the reason for the permit modification.The work will require filling of an off- line pond and outlet channel(JS)as well.Typical heavy equipment will be used including drill rig,dump trucks,and track-hoes. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Agency/Consultant Company: RSH,and NCDOT Other: 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 3. Stream Impacts E�3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type" [3f.Type of 3g S width* 3h.Iurisdiction* length S7 S1 SA,bridge and retaining Permanent Bank Stabilization Sorrell Creek Perennial Both 15 144 wall rip rap Average(feet) linear feet) S2 S1 SA,temporary dewatering Temporary Dewatering Sorrell Creek Perennial Both 15 44 Average(feet) pinear feet) S3 S3,SA,bank stabilization Permanent Bank Stabilization Sorrell Creek Perennial Both 15 10 Average(feet) pinear feet) S4 S4,SC bank stabilization Permanent Bank Stabilization Little East Fork Pigeon River Perennial Both 25 8 Average(feet) pinear feet) S5 S5,SB fill Permanent Fill UT Sorrell Creek Perennial Both 4 100 Average(feet) pinear feet) 31.Total jurisdictional ditch impact in square feet: 0 31.Total permanent stream impacts: 3i.Total temporary stream impacts: 262 44 31.Total stream and ditch impacts: 306 3j.Comments: 4. Open Water Impacts 4a. Site# 4a1.Impact Reason 4b.Impact type 4c.Name of waterbody 4d.Activity type �114e.Waterbody type 4f.Impact area 2,PA fill pond P pond,off-line Fill Pond 0.04 4g.Total temporary open water Impacts: 4g.Total permanent open water impacts: 0.00 0.04 4g.Total open water impacts: 0.04 4h.Comments: This pond needs to be filled because of a driveway and roadways alignment and because a portion of the earthen dam will be affected,which will compromise the overall integrity of the structure. E. Impact Justification and Mitigation u 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The project will replace a bridge with another bridge versus a culvert which would have more impact on the stream.The bridge approaches will move away from the creek.The overall bridge location is similar to the existing alignment. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Dewatering will be used as needed to avoid excavation in flowing water. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: The permanent stream impact losses and pond impact involve artificial structures that have poor water quality and WQ functions.The remaining impacts are only for rip rap bank protection,which will not cause a loss or appreciable deterioration of stream habitats. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no,explain why: This is not a protected riparian buffer area 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No Comments: Project will comply with the permit.An SMP is attached as well. G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/statellocal)funds or the use of public(federallstate)land?* Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPA/SEPA)?* Yes No Comments:* This project qualified as a minimum criteria project under SEPA rules. 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality? Yes No 3b.If you answered"no,"provide a short narrative description. This is a bridge maintenance project that will not increase or establish access to currently inaccessible areas. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8? Yes No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g.Does this project involve bridge maintenance or removal? Yes No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? Yes No If you answered"Yes"to 5g(1),did you discover any signs of bat use? Yes No Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* Yes No 51.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCDOT staff conducted field surveys and consulted available IPAC and NHP data sources. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NMFS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT HEU review and tribal coordination. 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8c.What source(s)did you use to make the floodplain determination? NC Flood maps FRIS Miscellaneous u Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Haywood 237_17BP.R177_Permit Drawings_edits Oct 28 2021.pdf 2.59MB 20210928_ReplaceBridge237overSorrelCreek_APPRV.docx(003).pdf 3.66MB 17BR14.R.177_Haywood 237_SHPO recheck for pond remove_2021.pdf 467.48KB Haywood 237 facing S from pond dam north of bridge.pdf 1.56MB Haywood 237 facing SE from north of bridge_tree clearing.pdf 1.59MB Haywood 237 facing west down road toward bridge and clearing.pdf 899.71<13 Haywood 237 GP Application Narrative and NRTR.pdf 372.5KB Haywood 237 Maps.pdf 816.01KB Haywood 237 PJD appendices.pdf 279.71 KB Haywood 237 soils.pdf 682.91 KB Haywood 237_NCSAM pond outflow channel site 3.pdf 210.76KB Haywood County-B237-Architecture Screening.pdf 2.02MB Haywood County-B237-Hydro Report.pdf 5.85MB NCDOT_17BP.14.R.177_Haywood 237 Tribal 106 Coordination.pdf 1.05MB Structure 430237 RESUBMIT 2 Haywood No Archaeological Survey Required Form.pdf 1.51 MB File must be PDF or KMZ Comments This is a resubmittal for a 401 Certification modification.The Corps verification has not been issued yet. Signature * By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Dave McHenry Signature ��// Date 11/2/2021