Loading...
HomeMy WebLinkAboutNCC215817_Site Plan or Location Map_20211103Location: L E SF SF SF SF LC G E /V D TEMPORARY DIVERSION SWALE PER DETAIL 6.20 TEMPORARY SEDIMENT FENCE PER DETAIL 6.62 TEMPORARY SEDIMENT FENCE OUTLET LIMITS OF CONSTRUCTION (TYPICAL) STABILIZED CONSTRUCTION ENTRANCE PER DETAIL 6.06 EXISTING CONTOURS PROPOSED CONTOURS ROCK PIPE INLET PROTECTION PER DETAIL 6.55 TEMP. POROUS BAFFLES PER DETAIL 6.65 TEMP. SKIMMER PER DETAIL 6.64 TEMP. SLOPE DRAIN PER DETAIL ON EC-3 RIP RAP OUTFALL PROTECTION PER DETAIL 6.41 GENERAL NOTES: 1. BOUNDARY SURVEY INFORMATION PROVIDED BY LANCE SCHAMBACK, PLS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING UTILITIES (SHOWN OR NOT SHOWN ON PLANS) PRIOR TO ANY GRADING ACTIVITIES. ANY CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 3. OFF -SITE BORROW OR WASTE SHALL COME FROM OR GO TO AN APPROVED SITE. 4. ALL EROSION CONTROL MEASURES MUST BE MAINTAINED UNTIL ALL DISTURBED AREAS HAVE BEEN PERMANENTLY STABILIZED. ADDITIONAL MEASURES MAY BE REQUIRED AS SITE CONDITIONS WARRANT. 5. SEE SHEETS EC-2 AND EC-3 FOR EROSION CONTROL SPECIFICATIONS AND DETAILS. 6. ALL STORM INLETS SHALL BE PROTECTED BY EXCAVATED DROP INLET PROTECTION AS PER. DETAIL ON SHEET EC-3. SEE SHEET EC-2 FOR STORM DRAIN DATA. 7. GRADES MAY BE ADJUSTED IN THE FIELD TO OBTAIN BALANCE OF CUT AND FILL. COORDINATE ANY CHANGES WITH ENGINEER AND SURVEYOR. ALL DRAINAGE FLOW LINES MUST MAINTAIN A MINIMUM SLOPE OF 1%. z Ann] Rd. Site Q Oswalt � Tra e Ct• W v Fallen \� N Acorn E)r. ee THIS PLAN SHOWS A TOTAL AREA OF NO MORE THAN 7 ACRES VICINITY MAP OF DISTURBED OF WHICH 2.2 ACRES OF DISTURBED AREA o a I V0 SCALE SUR VE Y INFORMATION BY., a w N (3 ACRES PAID) WAS PREVIOUSLY PERMITTED (BY GERALD GRANT, PE) Schombock Surveying, P.A. LEAVING A TOTAL OF 4 ACRES TO BE PERMITTED AT THIS TIME. P.O. Box 4143 Mooresville, N. C. 28117 Phone: (704) 622- ° C-3218 \- - - - - - - --- 21.6 w o m slo �3 1 N o\� b \_ I---- --- - � 9' I \ 03 46 TEMP. ROCK WEIR SEDIMENT FENCING \ _ ' N j / / _ - - l 16 - - / a zop / OUTLETS. INSTALL AT ALL LOW POINTS _ - - - _ \\ - � � \---------- ----- - --- /- / ��/ w \ \ FENCING AT EVERY 100 FEET - - -� z __-, 18 E / ±14 LF 24--I SINGLE WALL HDPE FOR CLEANWATER - - - - - - - - - - - - - - _ _ \ \ \ BYPASS AROUND DISTURBED AREA. \ /I \ - _ - - - / °�2 `l9 E / // \co PIPE T0,DISCHARGG_E-ON`870 CONTOUR AT EDGE OF \� / \ \, _ - - - - - /'' / S S g 1 �5" CPP ' / o \ / 4 / �\ I= o> I i \ \ \ \ \ \ \ \ \ STREAM BUFFER. o 28„E c on�re{e . X ExiSt;n9 Fen o n \ \ 49 -_° _ \ \ \ \ \ \ \ TEMPORARY S-LQPE DRAINS FOR DIVERTING / J , %'tea 0.51 w� �\/ O� o /� z w \ \ 3 N SEDIMENT LADEN RUNOFF -INTO REAR OF BASIN / 6 ''' %s C i \ \ \ \ \ \ 1 \ \ a AS SHOWN. SEE DTLS. ON SHEET EC-3. - - - - - - - - 6og ` \ \ i�3g"E \ - - - >,/ g Fen°e �� x� , 1 1 \ \ \ \ \ \\ \ M N SKIMMER SEDIMENT BASIN WITH POROUS BAFFLES - - - - '' / S 8`l 90 -LsF ` �900 l I I \ \ \ \ \ PER DTLS ON PLAN SHEET EC 3. SEE SIZING ON ` - r - i F ° q"E \ 1 \ PLAN-SIEET-EC-2. 9°i6'4ax�� I BOTTOM: 861.00 1 42 22 /- \ �� 116• I I / I \ TOP OF BERM: 866.0 l / ( \ /PROPOOED FUTU E ENTRANCE MIN. URFACE AREA: 18 FT. c, 1 I ( NOT TO BE USED AS A a a m` °Q l I \ D INAGE A : 2.70 ACRE CQNSTRUCTION ENTRANCE 1 Q i\ of S 3.�0/ f 1 I l / LIMIT F CLEARING AT 17021 BUFFER�AS SHOWN. BUFFERS / tp o20 A g 9 000w/ / ago/ / / , - �� �^ \ ��\� �\ _ - - \ \ I I I I 1 I o Tj Tj SHOWN TO EMAIN / / - - - �� - J \ \ _-� = \ \ I 0 I \ I ) N �Q)O l \ / UNDISTURBED. r/ I /I// �/� �; �= __ '�1 � � ��/ � /i_ CS _ ����� B �I,GISEDII, ENT )j � / � 'Ct Ln ' ° ul TEMP. TOPSOIL/ I /m[ I / / ago-7_3 OCKPILE / I / Q 6�� x� \�`- Z8•I6I d1,,T06Pf,°00AT �� ��� 4' 6 /' J l / l I� /(/I II�� �� �° o C.O.-P. 61 aoo o s/ , ' \ S 1 18 / pas °z / / / ° (� 5g. q o� J, , //oI \ TEMP. ,CON5TRUCTI 1 N aP _- _- 114g9 -`-��<,.�_ -dam / ��'� / �- / //�/�' E RANGES ITS I / / / / ILA l /i, / i �( c, PER D�TLS\ON SHEET EC-3./ /'./`�/ �',�'I 11 lzzlf�,�0 I I I I/ DIVE RS1.ON SW4LE/BrKM WITH STRA)lV'WATTLESI ----- wwa o -/ / __ SEEDTLS�ONEE�3.// i 7 j N / / / / mN �s o \ I I uiZR P. EDIMI EN FEW TI RbCK/ m a1 aal3ng jnvOf / / I- \ \ UTLE�SEI E//Ti ,,C/�f 3.LS / � /o / / / / / / l \ uiolua / o / l l l I �Q -�- . LC / -ago \ 7 �/ sae/ng�nanpAl o� G /V/ / 1 C" / / / I \ 1 \ \ \ P RAP'OUTFALL PROF ECTI`O III PEF�DETAIL ONE PL�N ShE � E 3 / /I // / / �/ / / / / /I / // LIMITS OF, LEARING AT \ het RI / / / / ��/ /// / / I a I\ - I l / 1 / / /// / / / / / / BPFF'FR�AS SHOWN. BUFFERS \ P° - SF�O/WN TO REMAIN > \ N/ / / �/ / I I / 340�8- biD9E�0 / / / / / / / / / / / / / / U1VDI URBED. \ �o / / / m / �i / / / / / / DIVE�TU F INTO / P / o -S1�NyMER I`o(rFfVT/BA/SIN. CK C CD A- T \� GRAPHIC SCALI CS C.0 o is so �10 / Iinch =50feet PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: 0,001 / 1 \ J C, 1 \ N 1 1 1 \ m 1 �CS \I U \ I I � ° I QN C� ) N � � \ � CL � L8Z '6d `ASS 'g•0\ 1 I \ •7 � wTj CT)CN I z 1 io \ \ Know what's below. 110 6 \\ s%\so 0___� Call before you dig. \ o Approved: Date of Issue: z r/ o U ct 4, G1 �. N � N W ��O v ' cmE4-4 O 0 ~ ccW Q Q 30�2 o � a C a O N U �oz Ld W LLL_ r-� �m> o � � o N w w Q� 1--1 C� NO W M--1 I--1 o� A � 1- 4 P4 NE-4N E-1 aW I--1 1.4 ICI 1.4 V 1 w o A W W � M�1 by �. REVISIONS BY Date: 8/25/20 Scale: 2'' t Contours Drawn: DMD Checked: DLM Project: 2020-03-02 ,lob: 2020-03-02 Sheet EC-1 of 3 Sheets NARRATIVE: Amity Hill LCID, LLC is proposing an expansion of its existing facility located off Amity Hill Road and Ostwalt Amity Road in Iredell County, North Carolina. The scope of work will involve stripping topsoil & stockpiling, preparing subgrade, installation of a permanent creek crossing with culvert, grading and seeding. Off site areas will be protected from sediment using temporary construction entrance, temporary silt fencing and temporary diversions with straw wattles, clean water bypass, skimmer sediment basins (existing & proposed). The limits of construction shall be as shown on plans. Total disturbed area originallypermitted was 3 acres Ian b Gerald Grant). New or additional disturbed P (P Y ) area is estimated to be no more than 4 acres. Upon completion all disturbed areas shall be permanently stabilized with gravel and grass as per the seeding specifications. r% r- A l r- n A I _ The work shall consist of furnishing labor and material, equipment and performing all operations necessary for a complete installation of all work as specified herein and as shown on the drawings. 1. Work shall consist of installation of temporary erosion control measures; stripping topsoil, preparing subgrade, relocation of excess soils located on site to adjacent site placement of stone, concrete & asphalt; redistribution of topsoil strippings, and permanent seeding. All disturbed areas shall be left in a stabilized condition upon completion of this project. 2. The Contractor is expected to examine the site to familiarize himself with site conditions. The Contractor shall carefully read all the specifications and examine the drawings and details in order to thoroughly familiarize himself with the work to be done. Any work shown on the drawings or included in the specifications, or reasonably implied by either, shall be performed the some as if called for by both. EARTHWORK: 1. A temporary bench mark shall be established on site. 2. The Contractor shall be thoroughly familiar with the Erosion Control Sequence as stated hereafter and shall follow this sequence to insure that no off site pollution occurs during or after construction. Any deviation from this stated sequence or plans and details shall have prior approval of the Owner's Engineer and Iredell County Erosion Control Office. 3. Top Soil: Strip all top soil from the area to be graded and stockpile on site for redistribution upon completion of grading. 4. If required, soil borings shall be taken in the area of the building pads by a certified soils engineer and the results reported to the Owner's Engineer. This work shall be done if directed by the Owner's Engineer. 5. Fill Dirt shall be placed in the areas indicated on the plan. Fill material shall be free of brush, rubbish, and other material that will be detrimental to construction of a stable fill. All fill shall be compacted to a minimum of 95% Standard Proctor with proper moisture control. Maximum thickness of layers of fill to be compacted shall not exceed 8". No slopes shall be steeper than 2: 1. The entire sub -grade after compaction shall be smooth and uniform slope. 6. Subgrade and fill to be verified and tested by geotechnical engineer. 7. Cut Material to be excavated is assumed to be earth and other materials that can be removed by power -shovel, bulldozer, motorized pan, or normal excavating equipment; but not requiring the use of explosives or drills. If rock (as defined herein) is encountered within the limits of excavation, the Contract Sum will be adjusted in compliance with provisions for "Changes in the Work" of the "Conditions of the Contract". When rock is encountered, Contractor shall notify the Engineer immediately; and shall not proceed further until instructions are given and measurements made for the purpose of establishing volume of rock and the value of excavating some. Rock is defined hereby as that material which cannot be ripped by a crawl er-tractorrated at a minimum of 50,000 lbs. drawbar pull at one mile per hour, pulling a single -tooth ripper. Equipment shall be in good repair, and shall be in proper working condition. Rock is further defined hereby as boulders larger than 1 /2 cubic yard in size. No payment will be made on the basis of unit -price for rock unless minimum -sized equipment or better is utilized as required hereinbefore. Rock work is defined hereby as removal of material by drilling, blasting or wedging. Rock shall be stripped for measurement before excavating, and no rock excavated or loosened before measurement will be allowed or paid for as rock. Measurement and payment, therefore, shall be by number of cubic yards required to bring the excavation to the required surface or grade as required by the Contract Documents. The Owner may adjust the grades should excessive rock be encountered. EROSION CONTROL SPECIFICATIONS Requirements of the Contract Documents apply to all work in this section. GENERAL: Provide the work of this section for erosion and sediment control as indicated and specified as follows: Construction entrance; hardware cloth & gravel inlet protection, temporary sediment fencing, diversion swales, temporary diversions, straw wattles, skimmer sediment basin and permanent seeding. CONTRACTOR'S RESPONSIBILITY: The Contractor shall furnish the Owner a system of temporary controls to minimize soil sediment erosion during the construction period caused by storm water runoff. Work shall be performed as called for on the drawings and as site conditions warrant. All erosion control measures shall be constructed in accordance with the NC Erosion and Sediment Control Planning and Design Manual Latest Edition. OWNER'S RESPONSIBILITY: After the acceptance, it is the Owner's responsibility to properly maintain the work. EROSION AND SEDIMENT CONTROL: The Contractor shall provide erosion and sediment control during the period of construction of this project. The Contractor shall protect and maintain the temporary erosion and sediment control structures which provide temporary sediment pollution control, as shown on the drawings. The Contractor shall protect and maintain the temporary facilities as necessary to trap soil erosion and sediment pollution created by storm water runoff. Maintenance of these facilities shall include, but not be limited to, regrading and filling of washed out areas, adding erosion control blankets, adding silt fence, adding additional wattles and reseeding and mulching of the swales during the construction period if deemed necessary by the Owner, Owner's Engineer, or the Iredell County Erosion Control Office. EROSION CONTROL SEQUENCE: The following sequence of construction shall be staged as required to provide acceptable erosion and sediment control. 1. Contractor shall arrange a pre -construction meeting with the Owner, the Owner's Engineer, and a representative from the Iredell County Erosion Control Office prior to any land disturbing activity. An Erosion Control Plan Approval Certificate shall be displayed and a copy of the approved erosion control plan must be available on site at all times during construction. Contractor shall install all erosion control measures. 2. Barricade off construction area. Construct access drive which shall receive a minimum of 6" depth of 2"-3" coarse aggregate in loose measurement at locations shown on the plan. Any sediment accumulation on adjacent public roads or areas not within limits of construction as a result of this project and traffic from this project shall be immediately cleaned off by the Contractor. (Minimum Stabilized Construction Entrance Length = 100' as per detail 6.06.) 3. Install construction entrance, sediment fencing along with rock weir outlets, temporary diversions with straw wattles as shown on plan sheet EC-1. Any diversion swales with anticipated velocities of greater than 2 ft./sec. shall be matted. *No Drefabricated silt fence is to be used on this Droiect.* 4. Once all measures are in place, a site inspection by Iredell County Erosion Control Office shall be administered prior to any earth moving activities. Strip topsoil and stockpile in areas as shown on the plans. NOTE: No offsite work shall take place offsite until approval from property owner is in place. 5. Rough grade site as shown by proposed contours. Stabilize disturbed areas as the site is brought to grade. The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion control devices or structures. In any event, slopes left exposed will, within 14 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, sufficient to restrain erosion. The angle for graded slopes and fills must be demonstrated to be stable. Stable is the condition where the soil remains in its original configuration, with or without mechanical restraints. Additional measures to control and sediment may be required by Iredell County Erosion Control Office. 6. Contractor to get roadway to final grade so that gravel base can be installed. Site shall be seeded within 7 days of being brought to grade. 7. The Contractor shall sow groundcover (including fertilizer and mulch) on all exposed earth areas within 14 calendar days following completion of any phase of grading; sow permanent groundcover for all disturbed areas within 14 calendar days following completion of construction or development. Contractor shall inspect seeded areas at 14 days after initial seeding and repair all bare areas. Non -stabilized areas shall be stabilized with erosion control blankets or other acceptable methods as approved by the Engineer. (See Stabilization time frame table this sheet). 8. The Contractor shall be responsible for maintaining all sediment and erosion control measures throughout the duration of the construction project. Maintenance shall include, but not be limited to: cleaning silt out of drain structures, adding extra gravel or riprap; regrading berms/swales and washed out areas; repairing, replacing, or adding silt fence, etc., all as required. 9. Contractor shall clean all all impacted storm drainage structures, flumes, pipes, culverts, etc. prior to final payment. Contractor to clean affected pavement areas daily. Contractor shall communicate directly with the Owner or the Owner's representative to coordinate the relocation of automobiles to prevent damage directly or indirectly as a result of these site improvements. 10. At the end of the project construction and after permanent ground cover is established, the Contractor shall request an inspection from Iredell County Erosion Control Inspector prior to receiving permission to remove all temporary erosion control structures grading these areas as shown by the proposed contours on Sheet EC-1 and seed all remaining disturbed areas, including any areas of poor quality vegetation. 12. Contractor shall "hold the Owner harmless" from financial penalty, which could be invoked by government authority, due to Contractor's negligence. 13. Contractor is responsible for performing self -inspections and reporting in accordance with NCDENR DWQ General Permit NCG 010000 Section 11.13, paragraph 3. SEEDING SPECIFICATIONS: SLOPES 3:1 or FLATTER 1. Apply agricultural lime at the rate of 90 Ib/1000 sf. 2. Apply 10-10-10 commercial fertilizer at the rate of 20 Ib/1000 sf. 3. Seed in accordance with the following schedule and application rate: DATE TYPE PLANTING RATE Aug 15 - Nov 1 Nov 1 - Mar 1* Mar 1 - Apr 15 Apr 15 - Jul 30 Tall Fescue Tall Fescue and Abruzzi Rye Tall Fescue Hulled Common or Bermuda 200 Ib/ac or 7 Ib/1000 sf 200 Ib/ac or 7 Ib/1000 sf 25 Ib/ac or 1 /2 Ib/1000 sf 200 Ib/ac or 7 Ib/1000 sf 30 Ib/ac or 1 Ib/1000 sf Jul 15 - Aug 15 Tall Fescue and 200 Ib/ac or 7 Ib/1000 sf Brown Millet or 35 Ib/ac or 7/8 Ib/1000 sf Sorghum -Sudan Hybrids 30 Ib/ac or 3/4 Ib/1000 sf * Heavily mulched during January - March period. Coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/ac. 4. Mulch with straw applied at the rate of 75-100 Ib/1000 sf. and anchor with asphalt emulsion tack coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/cc. SLOPES GREATER THAN 3:1 TO 2:1 1. Apply agricultural lime at the rate of 90 Ib/1000 sf. 2. Apply 10-10-10 commercial fertilizer at the rate of 20 Ib/1000 sf. 3. Seed in accordance with the following schedule and application rate. DATE TYPE PLANTING RATE Mar 1 - Jun 1 Sericea Lespediza (scarified) & Mar - Apr Add Tall Fescue or Jun - Sep 1** German Millet or Small -Stemmed Sudan Grass Sep - Mar 1 Sericea Lespediza (unhulled-unscarified) Tall Fescue Millet or Sudan 50 Ib/ac or 11 Ib/1000 sf 150 Ib/ac or 3-1/2 Ib/1000 sf 40 Ib/ac or 1 Ib/1000 sf 50 Ib/ac or 1.2 Ib/1000 sf 70 Ib/ac or 1-3/4 Ib/1000 sf 150 Ib/ac or 3-1/2 Ib/1000 sf 20 Ib/ac or 1 /2 Ib/1000 sf ** Temporary - Reseed September 1 at recommended rates. 4. Mulch with 3" straw applied at the rate of 50-90 Ib/1000 sf and anchor with asphalt emulsion tack coat applied at the rate of 5-7 gal/1000 sf or 200-300 gal/ac. NEW STABILIZATION TIMEFRAMES Site Area Description Stabilization Timeframe Exceptions ❑ Perimeter dikes, swales, ditches and slopes 7 days None High Quality Water (HQW) Zones 7 days None Slopes steeper than 3:1 7 days If slopes are 1 D' or less in length and are not steeper than 2:1; 14 days are allowed. 0 Slopes 3:1 or flatter 14 days 7 days for slopes greater than 50' in length. ry All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HQW Zones. TEI.'F c I•.II.'I.'E= SE DIME14T DRAIN. CENU DEO RAIN. REQ MIN. REG. c EC II.'E'•<T SEC. E S IN SED. '-'ilTH B,-,F FLES DATA SED. WEIR SKIMMER STORAGE STORAGE STORAGE WEIR FL13N TOP TOP 8OT. Bi1T. 8OT. SIZE SKIMMER BASIN AREA AREA STORAGE Q SURF. AR EA CEPTH WICTH LENGTH LEN13TH CEPTH 'WIDTH LEI GTH WIC TH LEN13TH BASIN IINI ORIFICE NUMBER_ ACRES ACRES) (C9 C FS ISH JFT FT[FT FT' IFTI JIFT FT FT[FT' ELEV. =T DIA. IN 1 -3 2.15 4WD 5.63 1S3g 3.0 2.3 -5D ' ; ; ?' 38 88 18 3 B.C1.00 = = ; 1.3 Design Requirements: Freeboerd 200 Fed 101'r Storm Inhans itv d95 i nr17 C= 0. 3 ALL TEMN)RARY 5Kh&ER SEDIMEW BA51N5 TO DE CONSTRUC TED AS PER DETAIL$.64 OVERLAP 4 C/C (1' Min.)-ROCK WEIR OUTLET. SUBSTITUTE HARDWARE CLOTH WITH #5 WASHED STONE ON UPSLOPE SIDE AT LOW POINTS ALONG SEDIMENT FENCING. 6 WOVEN FILTER FABRIC w 0 N MAINTENANCE NOTES: 1. ROCK WEIRS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE WEIR. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE ROCK WEIR IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: STEEL POST OVERLAP Ti.M;, �I DOWNSTREAM SIDE a p�ti P i co�Ztc MIN. Koi01,�',nc4 �5z, - HARDWARE CLOTH SHOULD TIE INTO THE STEEL POSTS. • IT IS NOT NECESSARY TO INCLUDE STONE DOWNSTREAM OF THE HARDWARE CLOTH Approved: 3' MIN. UPSTREAM SIDE HARDWARE CLOTH #5 WASHED STONE ON UPSLOPE SIDE OF WEIR SKIRT 6° MINIMUM Date of Issue: Z r/ o ~ U Q G1 Q, CL, N A a r cc ccO N W ME-- Q)4-4 ' �►r y p a> cw Q Q cc 3014 o � a QIU7 a 00 AQN ~ CD w LLJ Q J CO -J i 0000 (n 0 N W o � E-1 O o I� w O w Q� o_ O E F� M--0 �..� OE­4 = P4 ^w M--�1 Q I. 1--1 Ia M� M.4 � A W i d -5 " d ' �'T : REVISIONS BY Date: 8/25/20 Scale: N/A1 Hor Drawn: DMD Checked: DLM Project: Job: Sheet EC-2 of 3 Sheets 2.3 ' >,R. r coarse aggregate �C` Figure 6. Dam Gravel entrancelexit keeps sadmenl from leaving the conslructlori Mile (modified tram Va Swo C). Construction I. Clear the entrance and exit area of all vegetation. roots, and other Specifications objectionable material and properly grade it. 2. Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3. Provide drainage to carry walcr to a sediment trap or other suitable outlet. 4. Use gcotextile fabrics because they improve stability of the Foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2- inch stone. After each rainfall, inspect any stmcture used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. 6.41 Nd Pipe outlet to Flat Area - No Well-defined Channel 1 3do A Plan .w teAWW"TIF711 blartket Pipe Outlet to Well-defined Channel Motes 1. La is the length of the riprap apron. 2. d =1.5 times the maximum stone diameter but not less than 6"- 3. In a well-defined channel ex• tend the apron up the channel banks to an elevation of 6" above the maximum taIlwatat depth or to the top of the bank, whichever is less. 4. A filter blanket or filter fabric should be installed between the riprap and soil foundation. La � _ e I d _ 1 III iI lit I)li Section AA - r - .I{elrW Y Filter blanket Figure 6.41c Rtprap et ecapn modllad from Va EWCCI . Construction t- [--naive that the subgrade far the filter and riprap follows the required lines Specifications and grades shown in the plan. Compact any fill required in the subgrade to the p density ofthe surrounding undisturbed material- I -ow areas in the subgrade on undisturbed sole may also be filled by increasing the riprap thickness. 2. The riprap and gravel filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected From punching or tearing during installation. Repair any damage by removing the riprap and placing another piece of fiber cloth over the damaged area. All connecting joinu should overlap so the top laver is above the downstream laver a minimum of 1 foot. If the damage is extensive, replace the entire filter cloth. 4. Riprap may be placed by equipment, but take care to avoid damaging the filer. 5. The minimum lhicknds of the riprap should be 1.5 times the maximum stunt diamcicr. & Riprap may W field stone or rough quarry stone. It should be hard, angular. highly wcatrer-resislum and well graded. 7. Construct the aprm, on rrrn grade with min overfill al the end. Make the lop ofthe riprap at the downstream end level with the receiving area or slightly below• it. a. Ensure that the apron h properly aligned with the receiving stream and preferably straight throughout its length- If a curve is needed to fit site conditions. place it in the upper section of the apron. 9. 1 mmed iately after construction, stabi Eize at I disturbedareas with vegetation (Practices 6.10, Temporary Seeding, and 6.11. Permanent Seeding). Maintenance Inspect riprapotaletstroctures weekly and after%ignificarl (V2 inch or greater) raintatl events to see ifany erasion around or below the riprap has taken place, or if stones have been dislodged. Immediate make all needed re trs W Y Fro prevent further damage. 6.20 6.62 SEDIMENT FENCE Construction MATERIALS Specifications 1. Use a synthetic filter fabric arid least 95% by weight of pcilyclefins or polyester, which is certified by the manufacturer or supplier as conforming to the requirements in ASTM D 6461. which is shown in part in Table 6.62b. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of O to 120' F. 2. Ensure that posts tar sediment fences are 1.33 lb/linear It steel with a minimum length of 5 feet. Make sure that steel posts have projections to facilitate fastening the fabric. 3. For Teinfarcememt of standard strength filter fabric, use wire Fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. Table 6.62h Sner-ifir-atinnc For Sediment Fenr-e Fabric Temporary Silt Fence Material Property Requirements supported' Uri -Supported' Type of Test Material Units Silt Fence Silt Fence Value Grab Strength ASTM D 4632 N (Ibs) Machine Direction 400 550 MARV (90) (90) x-Machine Direction 40D 460 MARV (90) (90) Permittivity ASTM D4491 gec-1 0.05 0.05 MARV Apparent opening Size" ASTM D 4751 mint 0.60 0.60 Max. ARVI (US Sieve k) (30) (30) % 70%after Ultraviolet Stability ASTM D 4355 Retained Stab of exposure 70%after 5oDh of exposure Types Strength ' Sill Fence support shall consist of 14 gage steet wire wrth a mesh spacing of I50 mm (6 Inches), or prefabricated poyrmer mesh of equivalent strength `These default values are based on empirical evidence wain a variety of sediment. For environmentally sensitive areas, a review of previous experience andlor sire of regionally specific geotexlile teals In accordance with Test Method D 5141 should be performed by line agency to coFArm suitability of Ihese requirements. ' As measured In accordance with Test Method D 4632. CONSTRUCTION I. Construct the sediment harrier of standard strength or extra strength synthetic filter fabrics. 2. Ensure that the height ofthe sediment fence does not exceed 24 inches above the ground surface. (Higher fences may impound volumes (if water sufficient to cause failure ofthe structure.) 3. Construct the filter fabric from a continuous roll cut to the length ofthe barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4. Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence putt. Wire or plastic zip ties should have minimum 50 pound tensile strength. 5. When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Support posts should be driven securely into the ground a minimum of 24 inches, 6. Extra strength filter fabric with 6 feet post spacing does not require wire mesh sup" fence. Securely fasten the filter fabric directly to posts. Wire or plastic zip ties should have minimum 50 pound tensile strength. Cross -Section View ._:......... ............ t.pe ....V. " Filter steel sic aeckfill trweh N�.o„fu��f�nl .. ... .1.4.... ... - . "n - . .. T utall� - - .. '... . . . .. post and Compass �d - - - I - ... }horoughly . . .. " Is. 24'.. . m n 1 n Plgure 8.67a 1 sta lahbn detail Of a setivnam Mnba The Slicing Method 1-r" Posr S :INQ. . 246ripen n,,, n,m . on Poblng - w .h w � .m d aov PLOW _y�y� POST DIM- .= ere�r w mnp.ara m No more than 24" of a 36" fabric is allowed above ground. A w ................. ................wu,W- a� I s �h Li AFrACHMEW 1 e 11 . seerer roblc a co.w r reedeel. . allitre three lee ar In a' or t�rk:. per pm. fop •fk.Ibn each eedaper vet, p� sin helea lCdllr mnmem ar ropori. . Haig ep hIt. ma pear rV%dF and*,!A-N .Wy. Use cable Ass C501ba or soli Wre. Roll of slit fence 51tIMMER SEDIMENT BASIN BAFFLES gum TEMPORARY SLOPE DRAINS Arm Assembly (T \ Znkl*�).._ 'C' Enclosure 21 PERSPECTIVE VIEW Watunit PVC End PVC vent PVC Elbow pi Schedule 40 e Cop � / P -_ / PVC Pipe PVC End 7 Cap Schedule 40 PVC Teerf�%P�'.� e PVC pipe in -A PVC Tee Orifice de Flexible Plate Haft . 0 END VIEW FRONT VIEW Figure 6.64a Schematic of a skimmer, from Pennsylvania Erosion and Sediment Poll utlon Control Manual, March, 2000. Plan View Inflow structure ----� Emergency spillway Average - Area' `1► Width W ` L e Are of husin water surface Err top of principal spillway elevation Baffles .1 - er.,hn..Lr.,en+ �,W rmem Cross -Section storage zone View Figure6.64a Example of a sediment basin with a skimmer outlet and emergency spillway. From Pennsylvania Erosion and Sediment Pollution Control Manual, March, ZU00. Construction L. Clear, grub, and strip the area under the embankment of all vegetation and 5 ecificats root mat. Remove all surface soil containing high amounts of organic matter p and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. Place temporary sediment control measures below basin as needed 2. Ensure that till material for the embankment is free of mots, woody vegetation. organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and machine compact it. Overfill the embankment 6 inches to allow for sa-tilemcnl. 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling into the mud by excavating a shallow pit under the skimmer or providing a low support under the skimmer of stone or timber. 4. Place the barrel (typically 4-inch Schedule 40 PVC pipe) on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfll around the pipe. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be taken not to raise the pipe from the firm contact with its foundation whim compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted backh[1 over the pipe spillway before crossingit with constructionequipment. n c case should the i i t i n pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Assemble the skimmer following the manufacturers instructions, or as designed. 6. Lay the assembled skimmer on the bottom of the basin with the flexible joint at the inlet of the barrel i . Attach the flexible joint to the barrel i J p pe ) pipe and position the skimmer over the excavated pit or support. Be sure to attach n w a rape t the skimmer and anchor rt to the side of the basin. This dl be used to pull the skimmer to the side for maintenance. 7. Earthen spillways -Install the spillway in undisturbed soil to the greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. The spillway should be lined with laminated plastic or impermeable geotextiie fabric. The fabric must be wide and long enough to cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8-inch staples or pins. The fabric must be long enough to extend dawn the slope and exit onto stable ground. The width of the fabric must be one piece, not joined a spliced; otherwise water can get under the fabric. if the length ofthe fabric is insufficient for the entire length ofthe spillway. multiple sections, spanning the complete width, may be used. The upper section(s) should overlap the lower section(s) so that water cannot flow under the fabric. Secure the upper edge and sides of the Fabric in a trench with staples or pins, (Adapted from ''A Manual for Designing. Installing and Mairim Ining Skitnmer Sediment Basins." February, 1999. J. W. Faircloth & San.). 8. Inlets -Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment - laden water to the upper end of the pool area to improve basin trap efficiency References: Runs Cmmol Merrsrems and Ouder Prolecriom . [ ,O- r 9. Erosion control -Contract the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal Figure 6,85a Porous baffles in a sediment basin. The Row is distributed evenly across the basin to reduce flow rates and lurhuienee, resulting in greater sediment ratentlon. Baffles need to be installed correctly in order Fully provide their benefils. Refer to Figure 6.65b add the following key points: • The bailie makrial needs to be secured at the bottom and sides using staples or by trenching as for silt fence. • Most ofthe sediment will accumulate in the first bay- so this should be readily accessible For maintenance. Support rope. Suipliort post, mnit sugging or side wire �1Si■l r__ ___ _mot■ tip ■iltE ___ ■fill■ ■i■■�■■i■ ii�f■iiiit" i' Ei■i■tit ■l■ ■Ei■ E■ii ■ii �i■ ■i■■E■■■Ei■ fiE■ ■i_ �i■ ■[I■ ■i■ ■i■ iii ■W Figure 6.65b Cross-section of a porous bailie in a sediment basin. Note that Irm ie no weir because the water flours through the baffle material Flgy TiA.Sp E><a %of porous Deeds using sarMnca v h srna win In e- h alrernauN apeceor wke le king fence. (Cliynr Hlgh Pohl, He Construction I . GMdc the basin so that the bottom is Ievel front to hack and side to side Specification 2• Install posts or saw horses across the width of the sediment trap IPractice 6-6?, Sedira w Fence). 3. Steel posts should be driven to a depth of24 inches. spaced a maximum of 4 Feet apar4 and installed up the sides of the basin as well. The top of the fabric should be 6 inches higher than the invert ofthe spillway. Tops ofbafRes should he 2 inches Io vcr than the top of -the berms. 4. install at least three lows of baffles belween the inlet and outlet discharge poinr, Basins less than 7-01'eeI in length may use 2 baffles- 5. When using pcsK add a suppuri wire or rope across the leg• of the measure to prevent sagging. 6, wrap pours malerial, Iikejute backed try cPir material, over a sawhorse or the rap wire. Ranhmer rebar into the sawhorse legs For anchoring. The fabric should have five to ten percent opcningm in the weave. Attach fabric to a rope and a support so-DCWre Wilk Zip IieB. wire, ur staples. 7. The bottom and sides of the fabric should be anchored in a trench or pinned with a -inch erosion cautrol malting staples. t6 Do not splice the lebric, huh use a continuous piece across the basin. Maintenance Inspect battles al least once a week and after each rainfall. Make any required repairs immediately. Be sure to maintain access to the baffles. Should the fabric ofa baffle col lapse, . War, decompose, or become inenective, replace it promptly. Remove sediment deposits when it reaches half full to provide adequate sumgc volume for the next rain and to redLvx pressure on the baffles. Take careto Ovoid damaging the baffles during cleanoutSediment depth should never exceed half the designed storage depth. After the contributing drainage area has been pmperly stabilized. remove all baffle materials and unstable sediment deposits, bring rite area to trade, and stabilize it. Definition A flexible tubing or conduft extending temporarily from the top to the bottom Ora cut or fill slope. Purpose To convey concentrated runoff down the face of it cut or fill slope without causing erosion. Conditions Where This practice applies to construction areas where stormwater runoff above a cut or Oil slope will cause erosion if allowed to flow over the slope. Temporary Practice Applies slope drains are generally used in conjunction with diversions to convey runoff down a slope until permanent water disposal tnCaS m can be installed. Planning There is often a significant lag between the time a out or fill slope is graded and the time it is permanently stabilized. During this period, the slope is very Considerations vulnerable 10 erosion, and temporary slope drains together with lemponry diversions can provide valuable protection (Practice 6.20, Temporary Dimrs'ions). It is very important that these temporary structures be sized, installed, and maintained properly because their failure will usually result in severe erosion of the slope. The entrance section to the drain should be well entrenched and stable so that surface water can enter freely. The drain should extend downslope beyond the toe of the slope to a stable area or appropriately stabilized outlet. Other points of concerti are failure from overtopping from inadequate pipe inlet capacity and lack of maintenance ofdivetsion chartnel capacity and ridge height. ❑esign Criteria Cap1cilh'--Pcaknutafffrom ther Iayearstorm. Pipe size -Unless they are individually designed, size drains according to Table 6.32a. Table 6.32a Size of Slope Drain Maximum Drainage Pipe Diameter Area per Pipe (acres) (inches) D. 50 12 0.75 15 1.00 18 >1.00' as designed 'inlet design becomes more complex beyond this size. - Conduit --Construct the slope drain from heavy-duty, flexible materials such as nonperforated, corrugated plastic pipe or specially designed flexible tubing (Figure 6.32a). Install reinforced, hold-down grommets or stakes to anchor the conduit at intervals not to exceed 10 R with the outlet end sccmcly fastened in place. The conduit must extend beyond the toe of the slope - Diversion 4 �t... min � Island over inlet Dike%s,., A Hold dawn stak_ee `'=; ',,1--.i ;:e -1 IMM1.5ETR min t x�•;:: t5 lkn r III-�=I�i 10' spa2J,", - Hitfill }� li III -I Inlet {11-f1 '111= -- ' I (111- I f�- ;,---11Tf r enm =='1Ir Plastic �h• ~-- 11 corrugated pipe •: f 1i �_ I I Top of �.1 . I Stabilize 9k .; ::- : m osland) f I Tipd 4•�y � outlet+ 9 - t7 I ;f . I dtvlydm� y r. r" 1XV rrkt = Natural - ?'l.5'rain ,. , I., 31 ground 1' min y ," III R `a II it '-- s 4 ' min ,.1 9iversion -" '_ _ - � -•"I' ct air ' -.10 level section - - - - � - - - - -- - Figure a.a 2a Cross section of Campo vary slope drd In. Entrance -Construct the entrance to the slope drat¢ of a slandarxl Hared -end section of pipe with a minimum 6-inch metal toe plate (Figure 6.32a). Make all fittings watertight. A standard T-section fitting may also be used at the inlet. Temporary diversion -Generally, use an earthen diversion with a dike ridge to direct surface runoff into the temporary slope drain. Make the height of the drain conduit minim f t higher edge over the andue a urn o 1 5 fixt and a feast 6 mches g than the adjoining ridge on either side. The lowest point ofthe diversion ridge should he a minimum of 1 foot above the top of the drain so that design flow can freely eater the pipe. Outlet protection -Protect the outlet of the slope dink from erosion (Practice 6.41, Outlet Stabilization Sirrictmr). Construction A common failure of slope drains is caused h water saturating the soil and � y g Specifications seepingaloo the pipe. This creates voids from consolidation and Tin and g p P piping g causes washouts. Proper backHl(ing around and under the pipe "haunches" with stable soil material and hand compacting in 6-inch lifts to achieve firm contact between the pipe and the soil. at all points will eliminate this type of failure, 1. Place slope drains on undisturbed soil or well compacted fill at locations and elevations shown on the plan. 2. Slightly slope the section of pipe under the dike toward its outlet. 3. Hand tamp the soil under and around the entrance section in lifts not to exceed 4 in6cs, 4. Ensure that fill over the drain at the topoftfre slope has minimum dimensions of 1,5 feet depth, 4 feet top width, and 3 : I side slopes. S. Ensure that all ,slope citin connections are watertight. 6. Ensure that all fill material is well -compacted. Securely fasten the exposed section of the drain with grommets or stakes spaced no more than 10 feet apart. 7. Extend the drain beyond the tee of the slope. and adequately protect the outlet from erosion. 8. Make the Bottled, compacted dike ridge no less than I feet above the top of The Pe at every int. P ry Po 9. Immediately stabilize ail disturbod areas following construction. Maintenance Inspect the slope drain and supporting diversion after every rainfall, and promptly make necessary repairs. When the protected area has becn TD TEMPORARY DIVERSIONS In�siarad spillway immediately after construction (References: Surface Slabilimliox). permanently stabilized, temporary measures may be removed, materials aaer ccmpoutlo t I0. Install porous baffles as specified in Practice 6.65, Pnrovs Baffles. disposed of properly, and all disturbed areas stabilized appropriately. Compacted suit 2' Fabric orre ] me n v 11 After a I the sedlm t producing area have been permanently stablltaed, 1+ min . gars Si fence remove the structure and all tlhe unstable sediment. Smooth the area to References Runo CotTrml Measures FIG' blend with the adjoining areas and stabilize properly (References: Srerfum 6.20, Temporary Diversions _ _. 1 e" ram t ''' 4r q• t :':��a �< - Stabilizorion). .11 11l_ f i ifI �� !I i $ - s a� ! " ® !a q u...12 11 O+rtlef Protection 1l 11 - I � IiI 1 it i-f il�llll - �*� r04` �. ` i 6.a1, antler Stabilization Structure 6' typical - ,tea ova ':.: .. Maintenance inspect skimmer sediment bashns at (cast wcrkEy and after each significant 13.:'-:: (one-half inch or greater) rainfall evcm and repair immediately. Remove Flq... 6.2oa Temarraev eanhert &­ on dike Hordalfd crawl posit 55cang block; sediment and restore the basin to its original dimensions when sediment I a-x.drh 1 l c.r wkin i Conwietad Ir.talbnon accumulates to one-half the height of the first baffle. Pull the skimmer to Coarse aggregate Vibrolory plow is not acceptable because of horizontal compaction one side so that the sediment underneath it can be excavated. Excavate the 3A max sediment from the entire basin. not just around the skimmer or the first cell. Flgur. a.62h m Scheatics for using met the slicing hod to install a sedime.Stu nt fence Adepled from Fence rear (loofas Make sure vegetation growing in the bottom of the basin does not hold down la" min plow 7. Excavate a trench approximately 4 inches wide and 8 inches deep along the skimmer. Y I T J - --- = - the proposed line of posts and ups lope from the barrier ( Figure 6.62a). Repair the battles if they are damaged- Re -anchor the baffles if water is I I - E I= m - I I i 1= - =!i & Place 12 inches ofthe fabric along the bottom and side ofthe trench, flowing underneath or around them. n„ f 8' typical r�.'j lgr lIg I - 9. Backtill the trench with soil placed over the filter fabric and compact. IFthe skimmer is clogged with trash and there is water in the basin, usually Thorough compaction of the backfill is critical to silt fence performance. jerking on the rope will make the skimmer bob up and down and dislodge Figure G10b Temporay gravel duersion dike l-ehi.W cmasing lnhaarred from V. awed. the debris and restore flow. If this does not work, pull the skimmer over to 10. Do not attach filter fabric to existing Trees. the side of the basin and remove the debris. Also check the orifice inside the Construction T. Remove amd Fmprrly dispose of all ies, brush ,wraps, and other skimmer to see if it is clogged; if so remove the debris, abjeutionable maeennl. Sperafications SEDIMENT FENCE INSTALLATION USING THE SLICING METHOD Instead of excavating a trench, placing fabric and then backfilling trench, If the skimmer arm or barrel pipe is clogged, the orifice can be removed and 2. e that the minimum caruu,rrerd crises section meets all design sediment fence may be installed using specially designed equipment that the ohstruchon cleared with a plumber's snake orby flushing with water- Be requirements. quuiremirements. inscrls the fabric into a cut sliced in the ground with a disc (Figure 6.62b). sure and replace the orifice before repositioning the skimmet. A Ensure that the lop of the dike is rot lower at any point than the design eir,•ation plus the specified srulement. Check the fabric lined spillway for damage and make any required repairs Installation I. The base of both end posts should be at least one foot higher than the with fabric that spans the full width orthe spillway. Check the embankment, 4. Provide sufficient mom around diversions eu permit machine tvgn ding and cleanoul. middle of the fence. Chuck with a level if necessary. Specifications spillways. and outlet for erosion damage, and inspect the embankment for 2. Install posts 4 feet apart in critical areas and 6 feet apart on standard piping and settlement. Make all necessary repairs immediately. Remove all 5. Vegetate the ridge immediately oiler construction, unless it will remain in applications, trash and other debris from the sk immcr and pool areas. place less than ail working days. 3. Install posts 2 feet deep on the downstream side of the silt fence, and Freezing weather can result in ice forming in the basin. Some special Maintenance Inspect temporary diversions once a week and atterevcryminfalr. Immediately as close as possible to the fabric, enabling posts to support the fabric from precautions should be taken in the winter to prevent the skimmer from ve sediment from the If -arc. and repair the diversion ridgr. Carefully upstream water pressure. plugging with ice. check outlets acid make timely repairs as needed. When she area protected is 4, install posts with the nipples facing away from the silt fabric. permanently stabilized, remove the ridge and the channel to blend with the n.furat gn•und level and appmpri.tcly 5eabi Iiu it. S. Attach the fabric to each post with three ties, all spaced within the top 8 inches of the fabric. Attach each tie diagonally 45 degrees through the fabric, with each puncture at least 1 inch vertically apart. Also, each tie should be positioned to hang on a past nipple when rightened to prevent sagging- 6. Wrap approximately 6 inches of fabric around the end posts and secure with 3 ties. 7. No more than 24 inches of a 36 inch fabric is allowed above ground level- & The installation should be checked and corrected for any deviations before compaction. 9. Compaction is vitally important for effective results. Compact the soil immodiately next to the silt fence lebric with the front wheel of the tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the upstream side first, and then each side twice for a total of 4 trips. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has berm ........,..I....-I:l:.... .-In';­ Location: PUBLICATION OR REUSE OF THESE DRAWINGS OR ANY DETAILS WITHIN MUST BE WITH THE WRITTEN CONSENT OF PIEDMONT DESIGN ASSOCIATES, P.A. Owner: Natural Ground Figure 6.55a Rock pipe inlet protection plan view and cross-section view Construction 1. Clear the area ofall debris that might hinder excavation and disposal of Specifications spoil. 2. install the Class R or Class T riprap in a semi -circle around the pipe inlet. The stone should be built up higher on each end where it ties into the embankment. The minimum crest width of the riprap should be 3 feet, with a minimum bottom width of 1 l feet. The minimum height should be 2 feet. but also I loot lower than the shoulder of the embankment or diversions. 3. A 1 foot thick layer of NC DOT ifs or 957 stone should be placed on the outside slope ofthe riprap. 4. The sediment storage area should be excavated around ore outside ofthe stone horseshoe 18 inches below natural grade. 5. When the conmbating drainage area has been stabilized, fill depression and establish final grading elevations, compact area properly, and stabilize with ground cover. Maintenance Inspect rock pipe inlet protection at least weekly and after each significant (Ih inch or greater) rainfall event and repair immediately- Remove sediment and restore the sediment storage area to its original dimensions when the sediment has accumulated ha one-half the design dcplh of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for darrage. Any riprap displaced from the stone horseshoe must be replaced immediately. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover (S2wfare Smhilizatiot)- Approved: STRAW WATTLE INSTALLATION GUIDE N (3) NORTH DIAGRAM A AMERICAN GREEN 3' (0.91m) CENTER MINIMU I 1 `/ 9" 22.9 cm)-t--� J /; r 5 cm) -- ® TYPICAL WATTLE SPACING > I51 BASED ON SLOPE GRADIENT LL__ 1LL la' a.BP -1. +: i -- 21 1 (7.5 c ) 20' fit- a:a Iii 9'2. cm) 1. BEGIN AT THE LOCATION WHERE THE WATTLE IS TO BE INSTALLED BY EXCAVATING A 2-3" 5-7.5 CM) ) WIDE DEEP X 9" 22.9 CM E TRENCH ALONG THE CONTOUR OF THE SLOPE. EXCAVATED SOIL SHOULD BE PLACED UPSLOPE FROM THE ANCHOR TRENCH. 1. PLACE THE WATTLE IN THE TRENCH SO THAT IT CONTOURS TO THE SOIL SURFACE. COMPACT SOIL FROM THE EXCAVATED TRENCH AGAINST THE WATTLE ON THE UPHILL SIDE. ADJACENT WATTLES SHOULD TIGHTLY ABUT. 3. SECURE THE WATTLE WITH 18-24" (45.7-61 CM) STAKES EVERY 3-4' (0.9 -1.2 M) AND WITH A STAKE ON EACH END. STAKES SHOULEAVING LD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE AT LEAST 2-3" 5-7.5 CM OF STAKE EXTENDING ABOVE THE WATTLE. STAKES SHOULD BE DRIVEN PERPENDICULAR TO THE SLOPE FACE. ( ) North American Green Straw Wattles are o Best Management Practice (BMP) that offers an effective and economical alternative to silt fence and straw bales for sediment control and storm water runoff. Guidelines are provided to assist in design, installation, and structure spacing. The guidelines may require modification due to variation in soil type, rainfall intensity or duration, and amount of runoff affecting the application site. To maximize sediment containment with the Straw Wattle, place the initial structure at the tap/crest of the slope if significant runoff is expected from above. If no runoff from above is expected, the initial Straw Wattle can be installed at the appropriate distance downhill from the top/crest of the slope. The final structure should be installed at or just beyond the bottom/toe of the slope. Wattles should be installed perpendicular to the primary direction of overland flow. Straw Wattles are a temporary sediment control device and are not intended to replace rolled erosion control products (RECPs) or hydraulic erosion control products (HECPs). If vegetation is desired for permanent erosion control, North American Green recommends that RECPs or HECPs be used to provide effective immediate erosion control until vegetation is established. Straw Wattles may be used in conjunction with blankets, mats, and mulches as supplemental sediment and runoff control for these applications. Like all sediment control devices, the effectiveness of the Straw Wattle is dependent on storage capacity. 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 1-800-772-2040 TOLL FREE 812-867-6632 www.nngreen.com 51 L-, 3' Staple 3' -� I N v Date of Issue: Z 0o IIIIIIIIIIINIIIIIIIIIIIIIIIIII an 0 � U U M > , W ^• Yi Q 4 N � - A y ,~ Cn " cc o N W MHO ^l -4 ri- I "E-11111,1111_ ��U " Cd2. .. a= p �. O O -)) -0~w� CO W A Q cn 3°4z o� :--I � (= M U O sI U Q WM N �� CD U Iz U II.-4 o z w Q J H� CO \ Ir � O >--I LLJ LIL.0 � O W H� < O W tY 11 V L u� u� ell W_`!!!:� U lei-e-0 A = L) ` L O O = F1 P4■N� 14 O ^ 1.4 1--4 x w `� L) I-( u '21 Q'+j (=) O M 1.4 V l W O A P4 W0--ill = ``�\%%11IIf11777' -(b""',� .`\\ �� -av- (2 I '. /� ' _- � s -� , ''••„.„ z CJ ''777111IY91► 40 ````` REVISIONS BY Date: 8/25/20 ar r Scale: N/A1 Hor Drawn: DMD Checked: DLM Project: 2020-03-02 ,lob: 2020-03-02 Sheet EC- 3 of 3 Sheets