Loading...
HomeMy WebLinkAbout20131114 Ver 1_Emails_20131022Strickland, Bev From: Johnson, Alan Sent: Tuesday, October 22, 2013 9:36 AM To: tamp @wetland - consultants.com Cc: beverly.strickland @ncdenr.gov Subject: Piper Glenn 13 -1114 Tamp as discussed via phone the project will be placed on hold to give the Army Corp time to research the site regarding the old 404/401 permits to determine if the proposed impact "may" be considered cumulative. Thanks Alan