Loading...
HomeMy WebLinkAbout20180785 Ver 1_Mitigation Information_20211012Mitigation Project Name Hip Bone Creek USACE Action ID 2018-01160 DMS ID 100059 DWR Permit 2018-0785 River Basin Cape Fear Date Project Instituted 4/25/2018 Cataloging Unit 03030003 Date Prepared 10/11/2021 County Chatham Stream/Wet. Service Area Cape Fear 03030003 Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases /o Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 997.920 997.920 0.000 997.920 2021 10/11/2021 3 - Year 1 Monitoring 10.00% 332.640 2022 4 - Year 2 Monitoring 10.00% 332.640 2023 5 - Year 3 Monitoring 10.00% 332.640 2024 6 - Year 4 Monitoring 5.00% 166.320 2025 7 - Year 5 Monitoring 10.00% 332.640 2026 8 - Year 6 Monitoring 5.00% 166.320 2027 9 - Year 7 Monitoring 10.00% 332.640 2028 Stream Bankfull Standard 10.00% 332.640 2025 Totals 997.920 Total Gross Credits 3,326.400 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 997.920 Total Percentage Released 30.00% Remaining Unreleased Credits 2,328.480 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1.389 1.389 0.000 1.389 2021 10/11/2021 3 - Year 1 Monitoring 10.00% 0.463 2022 4 - Year 2 Monitoring 10.00% 0.463 2023 5 - Year 3 Monitoring 15.00% 0.694 2024 6 - Year 4 Monitoring 5.00% 0.232 2025 7 - Year 5 Monitoring 15.00% 0.694 2026 8 - Year 6 Monitoring 5.00% 0.232 2027 9 - Year 7 Monitoring 10.00% 0.463 2028 Stream Bankfull Standard j N/A N/A N/A N/A N/A N/A N/A Totals 1.389 Total Gross Credits 4.630 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1.389 Total Percentage Released 30.00% Remaining Unreleased Credits 3.241 Hip Bone Creek Page 1 of 2 Cape Fear 03030003 Mitigation Project Name Hip Bone Creek USACE Action ID DMS ID 100059 DWR Permit River Basin Cape Fear Date Project Instituted Cataloging Unit 03030003 Date Prepared County Chatham Stream/Wet. Service Area Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 2,860.000 Warm Stream Enhancement II 1,166.000 Riparian Restoration 4.528 Riparian Enhancement 1.495 2018-01160 2018-0785 4/25/2018 10/11/2021 Cape Fear 03030003 Debits Warm Stream Restoration Credits Riparian Restoration Credits Riparian Restoration Equivalent Credits Beginning Balance (mitigation credits) 3,326.400 4.032 0.598 Released Credits 997.920 1.210 0.179 Unrealized Credits 0.000 0.000 0.000 Converted Credits 0.000 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 997.920 1.210 0.179 Remaining Balance (Unreleased credits) 2,328.480 2.822 0.419 Total Remaining Balance (Released and Unreleased credits) 3,326.400 4.032 0.598 Hip Bone Creek Page 2 of 2 Cape Fear 03030003 From: Davis. Erin B To: Baker, Caroline D Subject: FW: [External] Notice of As -Built & MYO Review/ NCDMS Hip Bone Creek Mitigation Site/ SAW-2018-01160/ Chatham County Date: Wednesday, November 3, 2021 9:21:56 AM Attachments: Hip Bone 100059 CF 03 STIR RW Initial Release Revised.pdf Laserfiche Upload: Email & Attachment DWR#: 20180785 v.1 Doc Type: Mitigation Information From: Browning, Kimberly D CIV USARMY CESAW (USA) [mailto: Kimberly. D.Browning@usace.army.mil] Sent: Tuesday, October 12, 20214:16 PM To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Bowers, Todd <bowers.todd@epa.gov>; kathryn_matthews@fws.gov; Merritt, Katie <katie.merritt@ncdenr.gov> Cc: Gibby, Jean B CIV USARMY CESAW (USA) <Jean.B.Gibby@usace.army.mil>; Phillips, George L CIV USARMY CESAW (USA) <George.L.Phi Ili ps@usace.army.mil>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Lastinger, James C CIV USARMY CESAW (USA) <James.C.Lastinger@usace.army.mil>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Tim Morris <Tim.Morris@kci.com> Subject: [External] Notice of As -Built & MYO Review/ NCDMS Hip Bone Creek Mitigation Site/ SAW- 2018-01160/ Chatham County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review requires an IRT review period of 15 calendar days. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. Please note: If an IRT site visit is requested, comments will be due 15-days after the site visit is conducted. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: October 12, 2021 15-Day Comment Deadline: October 27, 2021 45-Day DE Decision: November 24, 2021 Project Information: Name: Hip Bone Creek USACE Action ID: SAW-2018-001160 NCDWR ID: 20180785 DIMS Project: 100059 RFP: 16-007331—Issued 9/8/2017 Institution: 4/25/2018—Full Delivery River Basin: Cape Fear 03030003 County: Chatham Mitigation Plan Assets: 3,326.400 SMUs (Warm) & 4.630 WMUs Provider: KCI Associates of North Carolina, Tim Morris, 919-278-2511 DMS PM: Jeremiah Dow, 919-218-0226 Please note: Earthwork was completed April 16, 2021 and planting was completed April 30, 2021. 2021 will be Monitoring Year 1 for this project. Deviations from the construction plan are shown in red on the As -built plan sheets in Appendix E. The as -built stream length is ^26 linear feet less than the centerline design length, and there is a minor change in wetland area due to miscalculation at Mitigation Plan. No change in project assets is requested. The final baseline (as -built) report, record drawings, and drone video were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for review. https://ncconnect.sharel2oint.com/sites/IRT-DMS/SitePages/Home.aspxx A drone video of the site is available here: https://www.youtube.com/watch?v=4xzm5mH9lg_Y Thank you for your participation. Regards, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers