HomeMy WebLinkAbout20180785 Ver 1_Mitigation Information_20211011Mitigation Project Name
Hip Bone Creek
USACE Action ID
2018-01160
DMS ID
100059
DWR Permit
2018-0785
River Basin
Cape Fear
Date Project Instituted
4/25/2018
Cataloging Unit
03030003
Date Prepared
10/11/2021
County
Chatham
Stream/Wet. Service Area
Cape Fear 03030003
Signature of Official Approving Credit Release
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases /o
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
#Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
997.920
997.920
0.000
997.920
2021
10/11/2021
3 - Year 1 Monitoring
10.00%
332.640
2022
4 - Year 2 Monitoring
10.00%
332.640
2023
5 - Year 3 Monitoring
10.00%
332.640
2024
6 - Year 4 Monitoring
5.00%
166.320
2025
7 - Year 5 Monitoring
10.00%
332.640
2026
8 - Year 6 Monitoring
5.00%
166.320
2027
9 - Year 7 Monitoring
10.00%
332.640
2028
Stream Bankfull Standard
10.00%
332.640
2025
Totals
997.920
Total Gross Credits
3,326.400
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
997.920
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,328.480
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
#Releases
Approved
Credits
Anticipated
Release
year
Approved
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1.389
1.389
0.000
1.389
2021
10/11/2021
3 - Year 1 Monitoring
10.00%
0.463
2022
4 - Year 2 Monitoring
10.00%
0.463
2023
5 - Year 3 Monitoring
15.00%
0.694
2024
6 - Year 4 Monitoring
5.00%
0.232
2025
7 - Year 5 Monitoring
15.00%
0.694
2026
8 - Year 6 Monitoring
5.00%
0.232
2027
9 - Year 7 Monitoring
10.00%
0.463
2028
Stream Bankfull Standard
j N/A
N/A
N/A
N/A
N/A
N/A
N/A
Totals
1.389
Total Gross Credits
4.630
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1.389
Total Percentage Released
30.00%
Remaining Unreleased Credits
3.241
Hip Bone Creek
Page 1 of 2 Cape Fear 03030003
Mitigation Project Name
Hip Bone Creek
USACE Action ID
DMS ID
100059
DWR Permit
River Basin
Cape Fear
Date Project Instituted
Cataloging Unit
03030003
Date Prepared
County
Chatham
Stream/Wet. Service Area
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
2,860.000
Warm Stream
Enhancement II
1,166.000
Riparian
Restoration
4.528
Riparian
Enhancement
1.495
2018-01160
2018-0785
4/25/2018
10/11/2021
Cape Fear 03030003
Debits
Warm Stream
Restoration
Credits
Riparian
Restoration
Credits
Riparian
Restoration
Equivalent
Credits
Beginning Balance (mitigation credits)
3,326.400
4.032
0.598
Released Credits
997.920
1.210
0.179
Unrealized Credits
0.000
0.000
0.000
Converted Credits
0.000
0.000
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE
Permit #
DWR
Permit #
DCM Permit
#
Remaining Balance (Released credits)
997.920
1.210
0.179
Remaining Balance (Unreleased credits)
2,328.480
2.822
0.419
Total Remaining Balance (Released and Unreleased credits)
3,326.400
4.032
0.598
Hip Bone Creek
Page 2 of 2 Cape Fear 03030003
From: Davis, Erin B
To: Baker, Caroline D
Subject: FW: REVISED REQUEST: NCDMS As -Built Review / Hip Bone Creek / SAW-2018-001160
Date: Wednesday, November 3, 2021 9:03:01 AM
Attachments: Hii) Bone 100059 CF 03 STR RW Initial Release Revised.pdf
Laserfiche Upload: Email & Attachment
DWR#: 20180785 v.1
Doc Type: Mitigation Information
From: Crocker, Lindsay
Sent: Monday, October 11, 2021 11:23 AM
To: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Kim Browning
<Kimberly.D.Brown ing@usace.army.miI>; Davis, Erin B <erin.davis@ncdenr.gov>; Tugwell, Todd J CIV
USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>
Cc: 'Tim.Morris@kci.com' <Tim.Morris@kci.com>; Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon,
Beth <beth.harmon@ncdenr.gov>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>
Subject: REVISED REQUEST: NCDMS As -Built Review / Hip Bone Creek / SAW-2018-001160
All,
This one was updated to reflect Mitigation Plan assets. Apologies for the confusion. The SharePoint
is up to date, along with a revised report uploaded to Laserfishe.
LC
Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO):
Project Information:
Name:
Hip Bone Creek
USACE Action ID:
SAW-2018-001160
NCDWR ID:
20180785
DMS Project:
100059
RFP:
16-007331—Issued 9/8/2017
Institution:
4/25/2018—Full Delivery
River Basin:
Cape Fear 03030003
County: Chatham
Mitigation Plan Assets: 3,326.400 SMUs (Warm) & 4.630 WMUs
Provider: KCI Associates of North Carolina, Tim Morris, 919-278-2511
DIMS PM: Jeremiah Dow, 919-218-0226
Please note:
Earthwork was completed April 16, 2021 and planting was completed April 30, 2021. 2021 will bE
Monitoring Year 1 for this project. Deviations from the construction plan are shown in red on the
As -built plan sheets in Appendix E. The as -built stream length is —26 linear feet less than the
centerline design length, and there is a minor change in wetland area due to miscalculation at
Mitigation Plan. No change in project assets is requested.
The final baseline (as -built) report, record drawings, and drone video were uploaded to the DMS/IRT
SharePoint, and DWR Laserfiche for review.
https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx
A drone video of the site is available here: https://www.youtube.com/watch?v=4xzm5mH9lgY
The debit ledger is attached for review and signature.
Lindsay Crocker
Eastern Regional Supervisor
NC DEQ Division of Mitigation Services
217 West Jones St., Raleigh, NC 27603
919.594.3910
Iindsay.crockerCa ncdenr.g_ov
D__E 4 -13
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.