Loading...
HomeMy WebLinkAbout20180785 Ver 1_Mitigation Information_20211011Mitigation Project Name Hip Bone Creek USACE Action ID 2018-01160 DMS ID 100059 DWR Permit 2018-0785 River Basin Cape Fear Date Project Instituted 4/25/2018 Cataloging Unit 03030003 Date Prepared 10/11/2021 County Chatham Stream/Wet. Service Area Cape Fear 03030003 Signature of Official Approving Credit Release 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases /o Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 997.920 997.920 0.000 997.920 2021 10/11/2021 3 - Year 1 Monitoring 10.00% 332.640 2022 4 - Year 2 Monitoring 10.00% 332.640 2023 5 - Year 3 Monitoring 10.00% 332.640 2024 6 - Year 4 Monitoring 5.00% 166.320 2025 7 - Year 5 Monitoring 10.00% 332.640 2026 8 - Year 6 Monitoring 5.00% 166.320 2027 9 - Year 7 Monitoring 10.00% 332.640 2028 Stream Bankfull Standard 10.00% 332.640 2025 Totals 997.920 Total Gross Credits 3,326.400 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 997.920 Total Percentage Released 30.00% Remaining Unreleased Credits 2,328.480 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1.389 1.389 0.000 1.389 2021 10/11/2021 3 - Year 1 Monitoring 10.00% 0.463 2022 4 - Year 2 Monitoring 10.00% 0.463 2023 5 - Year 3 Monitoring 15.00% 0.694 2024 6 - Year 4 Monitoring 5.00% 0.232 2025 7 - Year 5 Monitoring 15.00% 0.694 2026 8 - Year 6 Monitoring 5.00% 0.232 2027 9 - Year 7 Monitoring 10.00% 0.463 2028 Stream Bankfull Standard j N/A N/A N/A N/A N/A N/A N/A Totals 1.389 Total Gross Credits 4.630 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1.389 Total Percentage Released 30.00% Remaining Unreleased Credits 3.241 Hip Bone Creek Page 1 of 2 Cape Fear 03030003 Mitigation Project Name Hip Bone Creek USACE Action ID DMS ID 100059 DWR Permit River Basin Cape Fear Date Project Instituted Cataloging Unit 03030003 Date Prepared County Chatham Stream/Wet. Service Area Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 2,860.000 Warm Stream Enhancement II 1,166.000 Riparian Restoration 4.528 Riparian Enhancement 1.495 2018-01160 2018-0785 4/25/2018 10/11/2021 Cape Fear 03030003 Debits Warm Stream Restoration Credits Riparian Restoration Credits Riparian Restoration Equivalent Credits Beginning Balance (mitigation credits) 3,326.400 4.032 0.598 Released Credits 997.920 1.210 0.179 Unrealized Credits 0.000 0.000 0.000 Converted Credits 0.000 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 997.920 1.210 0.179 Remaining Balance (Unreleased credits) 2,328.480 2.822 0.419 Total Remaining Balance (Released and Unreleased credits) 3,326.400 4.032 0.598 Hip Bone Creek Page 2 of 2 Cape Fear 03030003 From: Davis, Erin B To: Baker, Caroline D Subject: FW: REVISED REQUEST: NCDMS As -Built Review / Hip Bone Creek / SAW-2018-001160 Date: Wednesday, November 3, 2021 9:03:01 AM Attachments: Hii) Bone 100059 CF 03 STR RW Initial Release Revised.pdf Laserfiche Upload: Email & Attachment DWR#: 20180785 v.1 Doc Type: Mitigation Information From: Crocker, Lindsay Sent: Monday, October 11, 2021 11:23 AM To: Haywood, Casey M CIV (USA) <Casey.M.Haywood@usace.army.mil>; Kim Browning <Kimberly.D.Brown ing@usace.army.miI>; Davis, Erin B <erin.davis@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Cc: 'Tim.Morris@kci.com' <Tim.Morris@kci.com>; Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Dow, Jeremiah J <jeremiah.dow@ncdenr.gov> Subject: REVISED REQUEST: NCDMS As -Built Review / Hip Bone Creek / SAW-2018-001160 All, This one was updated to reflect Mitigation Plan assets. Apologies for the confusion. The SharePoint is up to date, along with a revised report uploaded to Laserfishe. LC Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO): Project Information: Name: Hip Bone Creek USACE Action ID: SAW-2018-001160 NCDWR ID: 20180785 DMS Project: 100059 RFP: 16-007331—Issued 9/8/2017 Institution: 4/25/2018—Full Delivery River Basin: Cape Fear 03030003 County: Chatham Mitigation Plan Assets: 3,326.400 SMUs (Warm) & 4.630 WMUs Provider: KCI Associates of North Carolina, Tim Morris, 919-278-2511 DIMS PM: Jeremiah Dow, 919-218-0226 Please note: Earthwork was completed April 16, 2021 and planting was completed April 30, 2021. 2021 will bE Monitoring Year 1 for this project. Deviations from the construction plan are shown in red on the As -built plan sheets in Appendix E. The as -built stream length is —26 linear feet less than the centerline design length, and there is a minor change in wetland area due to miscalculation at Mitigation Plan. No change in project assets is requested. The final baseline (as -built) report, record drawings, and drone video were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for review. https://ncconnect.sharepoint.com/sites/IRT-DMS/SitePages/Home.aspx A drone video of the site is available here: https://www.youtube.com/watch?v=4xzm5mH9lgY The debit ledger is attached for review and signature. Lindsay Crocker Eastern Regional Supervisor NC DEQ Division of Mitigation Services 217 West Jones St., Raleigh, NC 27603 919.594.3910 Iindsay.crockerCa ncdenr.g_ov D__E 4 -13 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.