Loading...
HomeMy WebLinkAbout20181271 Ver 1_Mitigation Information_20211006From: Davis. Erin B To: Baker, Caroline D Subject: FW: [External] Notice of NCDMS As -Built Review / Honey Mill / SAW-2018-01789/ Surry Co. Date: Wednesday, November 3, 2021 8:52:46 AM Laserfiche Upload: Email DWR#: 20181271 v.1 Doc Type: Mitigation Information From: Haywood, Casey M CIV (USA)[ma ilto:Casey.M.Haywood@usace.army.mi1] Sent: Wednesday, October 6, 2021 12:37 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Browning@usace.army.miI>; Davis, Erin B <erin.davis@ncdenr.gov>; Bowers, Todd <bowers.todd@epa.gov>; Youngman, Holland J <hollandyouungman@fws.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Cc: Twyla Cheatwood - NOAA Federal (twyla.cheatwood@noaa.gov) <twyla.cheatwood@noaa.gov>; Aaron Earley <aearley@wildlandseng.com>; Phillips, Kelly D <Kelly.Phillips@ncdenr.gov>; Shawn Wilkerson <swilkerson@wildlandseng.com>; Horton, Jeffrey <jeffrey.horton@ncdenr.gov>; Hajnos, Edward A <edward.hajnos@ncdenr.gov>; Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Allen, Melonie <melonie.allen@ncdenr.gov>; Rice, Blane <blane.rice@doa.nc.gov>; Wiesner, Paul <paul.wiesner@ncdenr.gov> Subject: [External] Notice of NCDMS As -Built Review / Honey Mill / SAW-2018-01789/ Surry Co. CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good afternoon IRT, The below referenced FINAL Record Drawing (As -Built) Report review has been requested by NCDMS. Per Section 332.8(g) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: October 11, 2021 15-Day Comment Deadline: October 26, 2021 45-Day Credit Release Approval Deadline: November 25, 2021 Proiect information and location of the FINAL As -Built Baseline Monitorine Report (MY0) Honey Mill Mitigation Site DMS Project # 100083 USACE # SAW-2018-01789 DWR# 2018-1271 RFP: 16-007406 — Issued 12/7/2017 Institution Date: 06/22/2018 — Full Delivery Yadkin River Basin Cataloging Unit 03040101 Surry County, North Carolina Proposed Mitigation Plan Assets: 4,793.432 SMUs (cool) As -Built MYO Project Credits: 4,793.432 SMUs (cool) Mitigation Plan Lengths/ Acreages: 8,692.840 linear ft. As-Built-MYO Lengths/ Acreages: 8,683.000 linear ft. Please note: Stream construction and planting were complete by March 1, 2021. No major field adjustments were made during construction that differ from the design plans. Changes were made due to unforeseen site conditions and availability of on -site materials. Field adjustments are listed in Section 5.1 of the MYO report and in the record drawings. Changes to the planting list were made to account for the species availability at the time of planting and some areas of supplemental planting were removed at the engineer's discretion. Vegetation planting plan changes are detailed in Section 5.1.7 of the MYO report and in the record drawings. A 10-foot farm path was fenced within the conservation easement along Venable Creek Reach 3. The encroachment is due to a miscommunication with the surveyor about the placement of the easement line. This encroachment upon the 30-foot buffer width affects 38 LF of Venable Creek. The overall buffer impacts have been calculated to be 2.77%, which is below the allowable 5% threshold. This issue is detailed in Section 5.2.1 of the MYO report and is shown on Sheet 1.3 in the record drawings. A farm crossing culvert on UT2 Reach 2 extends into the conservation easement on the upstream side and downstream side of the internal easement crossing approximately 4 linear feet and 6 linear feet, respectively. This encroachment was included on the Mitigation Plan set for the project; however, the length adjustment was inadvertently excluded from the reach length calculation in the Mitigation Plan Project Asset Table. A loss of 10 linear feet is reflected in the total as -built linear footage for UT2 Reach 2 in Table 1 of Appendix 1 of the MYO report. This issue is detailed in Section 5.2.2 of the MYO report and is shown on Sheet 1.16 of the record drawings. DMS has discussed the two documented conservation easement infrastructure encroachments with Wildlands Engineering, the State Property Office (SPO) and DEQ Stewardship. DMS has also requested that Wildlands Engineering discuss these areas directly with the project landowner. Based on these conversations, DMS plans to document these minor infrastructure encroachments in the DMS infrastructure geodatabase and DEQ Stewardship project file without completing a conservation easement modification. FD Provider: Wildlands Engineering Inc.; Contact: Aaron Early aearley(@wildlandseng.com, Tel. 704.332.7754 x.109 (office), 704.819.0848 (cell) NCDEQ- DMS PM: Kelly Phillips, kelly_phillips(@ncdenr.gov, 919-723-7565 The Final As -Built Baseline Monitoring Report (MYO) and Record Drawings can be accessed directly on the DMS SharePoint site here: IRT-DMS SharePoint Page: https://ncconnect.sharepoint.com/sites/IRT-DMS/Site Pages/Home.aspxx Honey Mill_100083_MYO_2021.pdf https://ncconnect.sharepoint.com/:b:Vsites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Hone)1%20Mill%20(100083)/HoneyMilI 100083 MYO 2021.pdf? csf=1&web=1&e=cN N Fm I Honey Mill _100083_AB_2021 https://ncconnect.sharepoint.com/:b:/r/sites/IRT- DMS/AsBuilt%20Report%20%20Drawing/Honey%20Mill%20(100083)/HoneyMill_100083_AB_2021.pdf? csf=1&web=1&e=8dsr6X RIBITS: https://ribits.ops.usace.army.mil/ords/f?p=107:278:2275160618489:::RP,278:P278_BANK_ID:5183 Thank you, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers BUILDING STRONG °