Loading...
HomeMy WebLinkAbout20180785 Ver 1_Mitigation Information_20211005Mitigation Project Name Hip Bone Creek USACE Action ID DMS ID 100059 DWR Permit River Basin Cape Fear Date Project Instituted Cataloging Unit 03030003 Date Prepared County Chatham Stream/Wet. Service Area Signature of Official Approving Credit Release 2018-01160 2018-0785 4/25/2018 10/5/2021 Cape Fear 03030003 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 997.920 997.920 0.000 997.920 2021 10/5/2021 3 - Year 1 Monitoring 10.00% 332.640 2022 4 - Year 2 Monitoring 10.00% 332.640 2023 5 - Year 3 Monitoring 10.00% 332.640 2024 6 - Year 4 Monitoring 5.00% 166.320 2025 7 - Year 5 Monitoring 10.00% 332.640 2026 8 - Year 6 Monitoring 5.00% 166.320 2027 9 - Year 7 Monitoring 10.00% 332.640 2028 Stream Bankfull Standard 10.00% 332.640 2025 Totals 997.920 Total Gross Credits 3,326.400 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 997.920 Total Percentage Released 30.00% Remaining Unreleased Credits 2,328.480 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1.383 1.383 0.000 1.383 2021 10/5/2021 3 - Year 1 Monitoring 10.00% 0.461 2022 4 - Year 2 Monitoring 10.00% 0.461 2023 5 - Year 3 Monitoring 15.00% 0.691 2024 6 - Year 4 Monitoring 5.00% 0.231 2025 7 - Year 5 Monitoring 15.00% 0.691 2026 8 - Year 6 Monitoring 5.00% 0.231 2021 9 - Year 7 Monitoring 10.00% 0.461 1 2028 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 1.383 Total Gross Credits 4.610 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1.383 Total Percentage Released 30.00% Remaining Unreleased Credits 3.227 Hip Bone Creek Page 1 of 2 Cape Fear 03030003 Mitigation Project Name Hip Bone Creek USACE Action ID DMS ID 100059 DWR Permit River Basin Cape Fear Date Project Instituted Cataloging Unit 03030003 Date Prepared County Chatham Stream/Wet. Service Area Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 2,860.000 Warm Stream Enhancement II 1,166.000 Riparian Restoration 4.511 Riparian Enhancement 1.473 2018-01160 2018-0785 4/25/2018 10/5/2021 Cape Fear 03030003 Debits Warm Stream Restoration Credits Riparian Restoration Credits Riparian Restoration Equivalent Credits Beginning Balance (mitigation credits) 3,326.400 4.021 0.589 Released Credits 997.920 1.206 0.177 Unrealized Credits 0.000 0.000 0.000 Converted Credits 0.000 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 997.920 1.206 0.177 Remaining Balance (Unreleased credits) 2,328.480 2.815 0.412 Total Remaining Balance (Released and Unreleased credits) 3,326.400 4.021 0.589 Hip Bone Creek Page 2 of 2 Cape Fear 03030003 From: Davis. Erin B To: Baker, Caroline D Subject: FW: NCDMS As -Built Review / Hip Bone Creek / SAW-2018-001160 Date: Wednesday, November 3, 2021 8:51:20 AM Attachments: Hio Bone 100059 CF 03 STR RW Initial Release.pdf Laserfiche Upload: Email & Attachment DWR#: 20180785 v.1 Doc Type: Mitigation Information From: Crocker, Lindsay Sent: Tuesday, October 5, 20214:04 PM To: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Kim Browning <Kimberly.D.Brown ing@usace.army.miI>; Davis, Erin B <erin.davis@ncdenr.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Haywood, Casey M CIV (USA)<Casey.M.Haywood@usace.army.mil> Cc: Dow, Jeremiah J <jeremiah.dow@ncdenr.gov>; 'Tim.Morris@kci.com' <Tim.Morris@kci.com>; Corson, Kristie <kristie.corson@ncdenr.gov>; Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov> Subject: NCDMS As -Built Review / Hip Bone Creek / SAW-2018-001160 Project information and location of the FINAL As -Built Baseline Monitoring Report (MYO): Proiect Information: Name: USACE Action ID: NCDWR ID: DMS Project: Hip Bone Creek SAW-2018-001160 20180785 100059 RFP: 16-007331—Issued 9/8/2017 Institution: 4/25/2018—Full Delivery River Basin: Cape Fear 03030003 County: Chatham Mitigation Plan Assets: 3,326.400 SMUs (Warm) & 4.610 WMUs* Provider: KCI Associates of North Carolina, Tim Morris, 919-278-2511 DIMS PM: Jeremiah Dow, 919-218-0226 Please note: Earthwork was completed April 16, 2021 and planting was completed April 30, 2021. 2021 will be Monitoring Year 1 for this project. Deviations from the construction plan are shown in red on the As -built plan sheets in Appendix E. The as -built stream length is —26 linear feet less than the centerline design length. No change in project stream credits is requested (see note below about miscalculation in the mitigation plan). * Total project WMUs were updated from 4.630 WMUs to 4.610 WMUs due to a miscalculation in the mitigation plan discovered during MYO review. Project credits were reduced by 0.020 WMUs. There is no change to stream credits. The final baseline (as -built) report, record drawings, and drone video were uploaded to the DMS/IRT SharePoint, and DWR Laserfiche for review. htti2s://ncconnect.sharel2oint.com/sites/IRT-DMS/SitePages/Home.aspx A drone video of the site is available here: https://www.youtube.com/watch?v=4xzm5mH91gY The debit ledger is attached for review and signature. Lindsay Crocker Eastern Regional Supervisor NC DEQ Division of Mitigation Services 217 West Jones St., Raleigh, NC 27603 919.594.3910 lindsay.crocker(@ncdenr.gov 4 P�� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation.